From To Owner Type Element Scheduled Activity Date/Time Comments Interconnection
05-Oct-18 08:00 31-Dec-24 16:00 EPCOR IO C2 (Rossdale) forced outage 2,279.38 Days
Continuous
 
24-Oct-18 01:13 31-Dec-24 16:00 EPCOR IO C1 (Rossdale) forced outage 2,260.66 Days
Continuous
 
04-Sep-22 16:50 30-Sep-24 18:00 ATCO Outage 848s 401R (848s Ruth Lake) forced outage 757.05 Days
Continuous
 
31-Jul-23 14:56 27-Sep-24 16:00 ENMAX Outage 38.1C (SS-38) motor run time fail 424.04 Days
Continuous
 
27-Nov-23 08:00 07-Mar-25 16:00 ENMAX Outage 32.2TR (SS-32) 32 sub 32.2TR 8 kV bus switchgear demolition 466.33 Days
Continuous
 
07-Mar-24 06:30 29-Aug-24 16:00 ALTALINK Outage 477s T1 (477s Amoco West Pembina) disconnect T1 and VR1 permanently, draining oil, release 477s T1, VR1, & 4.16kV equipment for salvage and RSLD2 then RSLD3 to be implemented at end of outage 175.35 Days
Continuous
 
02-Apr-24 07:00 31-Aug-24 17:00 EPCOR Outage T1 (Garneau), GT1 (Garneau) Garneau S/S Tx1 bay outage 151.42 Days
Continuous
 
23-Apr-24 08:00 27-Sep-24 16:00 ENMAX Outage 41.2TR (SS-41) forced outage - differential protection trip 157.33 Days
Continuous
 
06-May-24 07:00 08-Nov-24 17:00 EPCOR Outage EP 511s Victoria T1 (EP 511s Victoria) Victoria: TX1 LCR, civil, demo, and construction 186.46 Days
Continuous
 
07-May-24 07:00 30-Sep-24 17:00 EPCOR TE 330p Protection & Control (330p Genesee) 138/500kV protection blocking for Repower Project Cut-Overs 146.42 Days
Continuous
 
03-Jun-24 07:00 30-Aug-24 17:00 EPCOR Outage T1 (Namao), EP 511s Victoria T1 (EP 511s Victoria), EP 511s V721 (EP 511s Victoria), EP 511s V722 (EP 511s Victoria) Victoria: TX1 LCR. Civil, Demo, and Construction 88.42 Days
Continuous
 
20-Jun-24 08:00 07-Oct-24 16:00 Syncrude Outage 1315 (Syncrude Mildred Lake) allow power distribution time to replace the 72 kV cables from plant 31 to C05 substation 109.33 Days
Continuous
 
08-Jul-24 08:00 16-Aug-24 18:00 SUNCOR TE 29EDD-60 Inglis Island, 29EDD-61 Stony Island CBR HV relay & SCADA commissioning 39.42 Days
Continuous
 
09-Jul-24 08:00 13-Sep-24 16:00 ENMAX Outage 31.1C (SS-31) HV breaker maintenance 66.33 Days
Continuous
 
11-Jul-24 00:00 31-Oct-24 17:00 ALTALINK Outage 74s C4 (74s Janet) forced outage 112.71 Days
Continuous
 
16-Jul-24 12:00 26-Nov-24 18:00 ALTALINK Outage 256s C1 (256s Harmattan) 256s C1 will be out of service until repairs are completed 133.29 Days
Continuous
 
21-Jul-24 16:00 09-Oct-24 07:00 ALTALINK, TRANSALTA Outage 229s T1 (229s Glenwood), 229s T2 (229s Glenwood) station refurbishment 79.63 Days
Continuous
 
22-Jul-24 07:00 22-Aug-24 17:00 ALTALINK TE 38s RTU/SCADA (38s East Edmonton) cutover new alarms, controls, and statuses to new SCADA system 31.42 Days
Daily
 
22-Jul-24 07:00 25-Oct-24 17:00 EPCOR TE 805s Protection & Control (805s Jasper), 805s RTU/SCADA (805s Jasper) protection blocking for P&C maintenance 95.42 Days
Continuous
 
22-Jul-24 07:00 27-Aug-24 17:00 ALTALINK TE 171s Protection & Control (171s Redwater) test trips from new 11(96/79)/652 171s735X to devices as needed 36.42 Days
Daily
 
22-Jul-24 10:00 23-Aug-24 16:30 ATCO, BSSL TE 1004s Protection & Control (1004s Bullseye) 7L760 A&B protection require setting modifications and commissioning of
RAS-A/1004S and RAS-B/1004S
32.27 Days
Continuous
 
22-Jul-24 11:00 23-Aug-24 17:00 ATCO TE 767s Protection & Control (767s Oyen), 767s RTU/SCADA (767s Oyen) 7L760 A and B protection require setting modifications
32.25 Days
Continuous
 
26-Jul-24 10:00 31-Dec-24 16:00 ATCO Outage 826s 504R (826s Marguerite Lake) emergency removal to replace failed 502R @834S 158.29 Days
Continuous
 
29-Jul-24 07:00 30-Aug-24 17:00 EPCOR Outage T3 (Rossdale) Rossdale - TX3 zone doble and RAB3, RDS6, RDS7 disconnect maintenance 32.42 Days
Continuous
 
29-Jul-24 08:00 20-Sep-24 16:00 ENMAX TE Protection & Control (SS-27) 27 sub auto switching protection replacement 53.33 Days
Continuous
 
30-Jul-24 08:00 16-Aug-24 16:00 SUNCOR Outage 29EDD-94 407T (29EDD-94 Voyageur), 29EDD-94 29-952-9705 (29EDD-94 Voyageur), 29EDD-94 29-952-9704 (29EDD-94 Voyageur), 29EDD-94 29PS-392 (29EDD-94 Voyageur), 29EDD-94 29PS-393 (29EDD-94 Voyageur), 29EDD-94 29PS-400 (29EDD-94 Voyageur) 5 Year PM, bad contactor coil
and replace AVR
17.33 Days
Continuous
 
31-Jul-24 16:00 16-Aug-24 17:00 ALTALINK TE 163s Protection & Control (163s Amoco Empress) 760L (163s-A767s) A protection is out of service due to TPR issue at remote end 16.04 Days
Continuous
 
02-Aug-24 10:00 16-Aug-24 17:30 ATCO RB 7L82 (788s Hotchkiss - 855s Hamburg), 7L82 (853s Ring Creek - 855s Hamburg) connect/disconnect mobile substation - 7L82 reclosing required off for the duration of the 855s 701T outage 14.31 Days
Continuous
 
05-Aug-24 08:00 17-Aug-24 18:00 SUNCOR Outage 29EDD-65 260kV Bus 29PP-0048 (29EDD-65), 29EDD-65 29-952-4811 (29EDD-65), 29EDD-65 29-952-4821 (29EDD-65) maintenance 12.42 Days
Continuous
 
05-Aug-24 08:00 04-Oct-24 17:00 ALTALINK TE 523s RTU/SCADA (523s Bullshead) update and addition of new SCADA alarms/controls 60.38 Days
Daily
 
06-Aug-24 07:00 29-Aug-24 17:00 ALTALINK, EPCOR RB 1058L (657s Summerside - EP 803s Lambton) 1058L reclosure: steel structure refurbishment 23.42 Days
Continuous
 
06-Aug-24 07:00 30-Aug-24 17:00 ALTALINK TE 171s RTU/SCADA (171s Redwater) update configuration for P&C protection upgrade 24.42 Days
Daily
 
06-Aug-24 07:00 26-Aug-24 17:00 ALTALINK TE 171s Protection & Control (171s Redwater) 81-1 & 1201 ILRAS relay outage to support the move of the PT1 distribution module 20.42 Days
Daily
 
06-Aug-24 08:00 16-Aug-24 16:00 ENMAX Outage 1.6TR (SS-1) oil spill cleanup 10.33 Days
Continuous
 
06-Aug-24 09:00 26-Aug-24 10:00 ALTALINK Outage 171s T1 (171s Redwater) replace protections and control, replace PT1 distribution, connect CTs to new B87/138B, create "171s open point "A" for replacement of 171s38 20.04 Days
Continuous
 
06-Aug-24 09:30 29-Aug-24 17:00 ALTALINK, EPCOR Outage 1059L (EP 803s Lambton - 1059AL tap), 1059AL (52s East Industrial - 1059L tap), 1059L (38s East Edmonton - 1059AL tap), EP 803s L2401 (EP 803s Lambton), EP 803s L2404 (EP 803s Lambton), 52s E2401 (52s East Industrial), 52s T1 (52s East Industrial) steel structure refurbishment 23.31 Days
Continuous
 
06-Aug-24 09:30 29-Aug-24 17:00 ALTALINK, EPCOR Outage 1059L (38s East Edmonton - 1059AL tap), 1059L (EP 803s Lambton - 1059AL tap) steel structure refurbishment 23.31 Days
Continuous
 
06-Aug-24 10:00 16-Aug-24 17:30 ATCO Outage 855s 701T (855s Hamburg) 701T oil reclaim, major testing, 501VR major testing and tap changer maintenance 10.31 Days
Continuous
 
10-Aug-24 07:00 07-Nov-24 16:00 ENMAX Outage 2.82L (SS-2 - SS-5), 5B138-2.82 (SS-5), 2MD138-2.82 (SS-2) modification work for 2.82/2.83 Victoria park green line relocation - install future str 24 (2.83L riser) and future str 26 (2.82L riser) 89.42 Days
Continuous
 
12-Aug-24 07:00 16-Aug-24 17:00 EPCOR Outage 987s T1 (987s Clover Bar), 987s CCP7213 (987s Clover Bar), 987s CCP7214 (987s Clover Bar), 987s C2401 (987s Clover Bar), 987s C2403 (987s Clover Bar), 987s CDS25 (987s Cloverbar) PT retest and C2401 dashpot repair 4.42 Days
Continuous
 
12-Aug-24 07:00 20-Aug-24 13:00 ALTALINK, BPWF Outage 1097L (356s Milo – 611s Amber), 611s T1 (611s Amber), 611s T2 (611s Amber), 356s 1097 (356s Milo), 611s 52-240-1 (611s Amber), 611s 52-240-2 (611s Amber), 356s 789 (356s Milo), 611s 89-B1 (611s Amber) closing open point 'C' and completed final commissioning/testing 8.25 Days
Continuous
 
12-Aug-24 07:00 15-Aug-24 17:00 ALTALINK TE 852s Protection & Control (852s Round Hill) relay maintenance 3.42 Days
Daily
 
12-Aug-24 07:30 17-Aug-24 18:00 ALTALINK Outage 535s T1 (535s Joffre) migrate and commission all T1 protections, 189 status, controls, metering, and remote access to new RTU and LAN, install new SEL-735 meter, T1 revenue meter install, CT6 replacement 5.44 Days
Continuous
 
12-Aug-24 07:30 15-Aug-24 17:00 ALTALINK TE 213s RTU/SCADA (213s Hughenden) 213s RTU configuration for new substation security alarms 3.4 Days
Daily
 
12-Aug-24 08:00 14-Feb-25 16:00 ENMAX Outage 28.1TR (SS-28) 28.1TR transformer replacement 186.38 Days
Continuous
 
12-Aug-24 08:00 16-Aug-24 16:00 ENMAX Outage 5.7TR (SS-5) tap changer replacement, oil sampling MT 4.33 Days
Continuous
 
12-Aug-24 08:00 15-Aug-24 16:00 ATCO RB 7L09 (823s Wapiti - 7L03 tap) changing rotten cross arm under live line technique 3.33 Days
Continuous
 
12-Aug-24 08:00 29-Aug-24 17:30 ALTALINK TE 15s RTU/SCADA (15s Fort Macleod) update RTU for AIS1147 modification 17.4 Days
Daily
 
12-Aug-24 08:00 17-Aug-24 17:00 ALTALINK TE 535s RTU/SCADA (535s Joffre) download new configurations and migrating and commissioning T1 TX18341 alarms controls and status 5.38 Days
Continuous
 
12-Aug-24 08:00 23-Aug-24 16:00 REDDEER Outage 247s T1 (247s Piper Creek) transformer testing 11.33 Days
Continuous
 
12-Aug-24 08:00 20-Aug-24 17:00 ALTALINK TE 356s RTU/SCADA (356s Milo) download new configurations and for any deficiency cleanup 8.38 Days
Daily
 
12-Aug-24 08:00 20-Aug-24 17:00 ALTALINK TE 102s RTU/SCADA (102s Langdon) download new configurations and for any deficiency cleanup 8.38 Days
Daily
 
12-Aug-24 08:00 06-Sep-24 17:00 ALTALINK, BPWF TE 611s RTU/SCADA (611s Amber) download new configurations and for any deficiency cleanup 25.38 Days
Daily
 
12-Aug-24 08:00 23-Aug-24 16:00 ENMAX TE Protection & Control (SS-23) 23 Sub auto switching protection upgrade 11.33 Days
Continuous
 
12-Aug-24 08:00 20-Aug-24 16:00 ENMAX Outage 23.3TR (SS-23) 23 Sub auto switching protection upgrade 8.33 Days
Continuous
 
12-Aug-24 08:00 13-Sep-24 17:00 ALTALINK TE 244s RTU/SCADA (244s Bowmanton) update and addition of new 676L SCADA alarms/controls pertaining to the Winnifred Wind project 32.38 Days
Daily
 
12-Aug-24 08:00 18-Aug-24 16:00 ENMAX Outage 39.1TR (SS-39) transformer testing and maintenance, oil sampling MT, TC, bushing, check reversing switch 6.33 Days
Continuous
 
12-Aug-24 08:00 15-Aug-24 16:00 ENMAX Outage 14.1TR (SS-14) transformer testing and maintenance, relay fault pressure test, check reversing switch, oil sampling MT, TC 3.33 Days
Continuous
 
12-Aug-24 08:00 16-Aug-24 17:00 ALTALINK TE 163s Protection & Control (163s Amoco Empress) implementation of three terminal settings, three terminal end-end testing with ATCO - 760L protection 4.38 Days
Continuous
 
12-Aug-24 09:00 16-Aug-24 17:30 ATCO Outage 7L146 (700s Bonnyville - 970s Bourque), 700s 704 (700s Bonnyville) HPL breaker 704 complete testing, replace densimeter covers 4.35 Days
Continuous
 
12-Aug-24 09:00 22-Aug-24 17:00 ALTALINK, BHE RB 879L (368s Burdett - 879L tap), 879L (244s Bowmanton - 879AL tap), 879AL (719s Rattlesnake Ridge - 879L tap) component replacement str 460-730 - live line 10.33 Days
Daily
 
12-Aug-24 09:00 23-Aug-24 16:00 ALTALINK Outage 133s T1 (133s Stelco Edmonton), 133s T2 (133s Stelco Edmonton) equipment maintenance 11.29 Days
Continuous
 
12-Aug-24 09:00 16-Aug-24 17:00 ALTALINK RB 757L (17s Benalto - 758L tap), 757L (297s Rimbey - 758L tap) replace structure 74-87 4.33 Days
Daily
 
12-Aug-24 10:00 15-Aug-24 17:00 ATCO Outage 959s SVC (959s Lanfine), 959s 921 (959s Lanfine) converter inspection, fire system inspection 3.29 Days
Continuous
 
12-Aug-24 11:00 15-Aug-24 18:00 ALTALINK Outage 706L (410s Josephburg - 706AL tap), 706L (54s Fort Saskatchewan - 706AL tap), 706AL (452s B.F. Goodrich Fort Saskatchewan - 706L tap), 452s T1 (452s B.F. Goodrich Fort Saskatchewan), 54s 706N (54s Fort Saskatchewan), 452s 10 (452s B.F. Goodrich Fort Saskatchewan), 706L72D (706AL tap), 706L72B (706AL tap), 452s 1 (452s B.F. Goodrich Fort Saskatchewan) replace 25kv bushings on T1 and maintenance 3.29 Days
Continuous
 
12-Aug-24 13:30 22-Aug-24 16:30 ALTALINK Outage 489s T1 (489s Petro Canada Brazeau River) oil reclamation, doble, maintenance 10.13 Days
Continuous
 
12-Aug-24 14:30 15-Aug-24 16:30 ALTALINK Outage 377s T1 (377s AML Hardisty) maintenance, doble 3.08 Days
Continuous
 
13-Aug-24 07:00 19-Aug-24 17:00 ATCO TE 788s Protection & Control (788s Hotchkiss), 788s RTU/SCADA (788s Hotchkiss) cutover existing protection relays to new SCADA system 6.42 Days
Continuous
 
13-Aug-24 08:30 15-Aug-24 16:00 ATCO Outage 786s 701T (786s High Level), 786s 505C (786s High Level), 786s 506C (786s High Level), 786s 701TCS (786s High Level) replace 25 kV switches 2.31 Days
Continuous
 
13-Aug-24 08:30 15-Aug-24 13:30 ALTALINK Outage 103s 552 (103s Goose Lake) first trip, gas leak repair and maintenance 2.21 Days
Continuous
 
13-Aug-24 09:00 15-Aug-24 17:00 ALTALINK TE 69s Protection & Control (69s North Barrhead) implement fault reporting on 913LX A21/59/L2, 913LN B21/L8, 723L B21/L3, 7L230 A21/79/L5 and 7L230 B21/L5 2.33 Days
Daily
 
13-Aug-24 09:00 15-Aug-24 17:00 ALTALINK TE 69s RTU/SCADA (69s North Barrhead) update configuration to implement fault reporting 2.33 Days
Daily
 
13-Aug-24 09:00 15-Aug-24 16:00 ATCO TE 751s Protection & Control (751s Hill), 751s RTU/SCADA (751s Hill) ITM settings and non electrical function update 2.29 Days
Continuous
 
14-Aug-24 07:30 16-Aug-24 17:30 ALTALINK RB 776L (308s Albchem Beaverhill Creek - 410s Josephburg) framing of new structures and outage prep of (str96-100) for road widening 2.42 Days
Continuous
 
14-Aug-24 08:00 15-Aug-24 15:00 ATCO Outage 7L159 (770s Three Hills - 7L159 tap), 770s 704 (770s Three Hills) clearance mitigation 7L159 replace structures 31, 95, 111 31 Hours
Continuous
 
14-Aug-24 08:00 20-Aug-24 17:00 ALTALINK TE 102s Protection & Control (102s Langdon) modify existing settings to remove tripping to 991s 6.38 Days
Daily
 
14-Aug-24 08:00 15-Aug-24 16:00 ENMAX Outage 2.80L (SS-2 - SS-23), SW83 (SS-23), 2MD138-2.80 (SS-2) 23 Sub Auto switching protection Upgrade 1.33 Days
Continuous
 
14-Aug-24 08:30 16-Aug-24 14:00 ENMAX Outage 11.4TR (SS-11) grounding improvements 2.23 Days
Continuous
 
14-Aug-24 09:30 15-Aug-24 17:30 ATCO Outage 813s 701 (813s Little Smoky) complete SF6 HGF testing 1.33 Days
Continuous
 
15-Aug-24 07:00 15-Aug-24 18:00 ALTALINK, EPCOR Outage 1059L (38s East Edmonton - 1059AL tap), 1059L (EP 803s Lambton - 1059AL tap), 1059AL (52s East Industrial - 1059L tap), 38s 7552 (38s East Edmonton), 38s 7452 (38s East Edmonton) cutover new alarms, controls, and statuses to new SCADA system 11 Hours
Daily
 
15-Aug-24 07:00 15-Aug-24 17:00 ALTALINK TE 678s Protection & Control (678s Okotoks) perform PRC/standard relay maintenance 10 Hours
Daily
 
15-Aug-24 07:00 28-Aug-24 18:00 ALTALINK RB 848AL (531s Shell Schrader Creek - 848L tap), 848L (17s Benalto - 848AL tap), 848L (378s Shell Caroline - 848AL tap) removing and replacing a bridge that runs parallel to 848L 71-72 13.46 Days
Daily
 
15-Aug-24 07:00 15-Aug-24 17:00 ALTALINK TE 15s Protection & Control (15s Fort Macleod) urgent - replace power supplied on relays 725L B21/25SC/L9 URD60 10 Hours
Daily
 
15-Aug-24 08:00 15-Aug-24 17:00 ALTALINK TE 535s Protection & Control (535s Joffre) 138B2 bus autorestoration protection outage to function DC fail alarm 9 Hours
Daily
 
15-Aug-24 10:00 15-Aug-24 17:00 ATCO TE ATCO Telecom Equipment, 827s RTU/SCADA (827s Cranberry Lake) Cranberry Lake_S-Telecom and Lubicon_T-Telecom outage for low bes firewall installation 7 Hours
Continuous
 
15-Aug-24 10:00 15-Aug-24 16:00 ATCO Outage 820s 507C1 (820s Hangingstone), 820s 507C2 (820s Hangingstone) breaker maintenance 6 Hours
Continuous
 
15-Aug-24 10:00 15-Aug-24 15:00 ATCO TE ATCO Telecom Equipment Poplar Hill_S-Telecom - updating lowbes firewalls at PoplarHill substation 5 Hours
Continuous
 
17-Aug-24 07:00 17-Aug-24 17:00 ATCO RB 7L46 (813s Little Smoky - 845s Big Mountain) high load move 10 Hours
Continuous
 
17-Aug-24 07:00 17-Aug-24 17:00 ATCO RB 7L45 (798s Bridge Creek - 845s Big Mountain), 7L45 (798s Bridge Creek - 813s Little Smoky) high load 10 Hours
Continuous
 
17-Aug-24 07:15 24-Aug-24 17:45 ALTALINK Outage 776L (308s Albchem Beaverhill Creek - 410s Josephburg), 308s 776W (308s Albchem Beaverhill Creek) structures replacements (str96-100) for road widening 7.44 Days
Continuous
 
17-Aug-24 07:30 17-Aug-24 12:30 ALTALINK Outage 897L (38s East Edmonton - 45s Bretona), 38s 897 (38s East Edmonton), 45s 897 (45s Bretona) cutover new alarms, controls, and statuses to new SCADA system 5 Hours
Daily
 
17-Aug-24 07:30 23-Aug-24 17:30 ALTALINK RB 856L (409s Shell Scotford - 410s Josephburg) lower ADSS on Str 12-13, to increase the vertical distance between the 138kV line and the ADSS 6.42 Days
Daily
 
17-Aug-24 08:00 18-Aug-24 16:00 ENMAX, ALTALINK Outage 24.83L (74s Janet - SS-24), 24.81L (SS-24 - SS-31), 24.1TR (SS-24), 74s 24.83X (74s Janet), 24B138-24.83 (SS-24), 24B138-24.81 (SS-24), 24B138-24BT3 (SS-24), 31B138-24.81 (SS-31) power factor test 1.33 Days
Continuous
 
17-Aug-24 08:00 31-Aug-24 16:00 SUNCOR Outage 29EDD-94 29PP-98 260kV Bus (29EDD-94 Voyageur), 29EDD-94 406T (29EDD-94 Voyageur), 29EDD-94 29-952-9702 (29EDD-94 Voyageur), 29EDD-94 29-952-9703 (29EDD-94 Voyageur), 29EDD-94 29-952-9704 (29EDD-94 Voyageur), 29EDD-94 29-952-9709 (29EDD-94 Voyageur), 29EDD-94 29-952-9710 (29EDD-94 Voyageur), 29EDD-94 29PS-399 (29EDD-94 Voyageur), 29EDD-94 29PS-391 (29EDD-94 Voyageur), 29EDD-94 29PS-388 (29EDD-94 Voyageur), 29EDD-94 29PS-389 (29EDD-94 Voyageur), 29EDD-94 29PS-390 (29EDD-94 Voyageur), 29EDD-94 29PS-633 (29EDD-94 Voyageur), 29EDD-94 29PS-634 (29EDD-94 Voyageur), 29EDD-94 29PS-632 (29EDD-94 Voyageur), 29EDD-94 29PS-635 (29EDD-94 Voyageur) 5 year PM and replace coils 14.33 Days
Continuous
 
17-Aug-24 08:00 17-Aug-24 18:00 ENMAX Outage 32.3TR (SS-32) cap changer inspection and oil filtration maintenance 10 Hours
Continuous
 
17-Aug-24 12:31 17-Aug-24 17:30 ALTALINK Outage 780L (38s East Edmonton - 522s Cooking Lake), 38s 780X (38s East Edmonton), 522s 780 (522s Cooking Lake) cutover new alarms, controls, and statuses to new SCADA system 4.98 Hours
Continuous
 
18-Aug-24 07:00 18-Aug-24 17:00 ATCO RB 7L46 (813s Little Smoky - 845s Big Mountain) high load move 10 Hours
Continuous
 
18-Aug-24 07:00 18-Aug-24 17:00 ATCO RB 7L45 (798s Bridge Creek - 845s Big Mountain), 7L45 (798s Bridge Creek - 813s Little Smoky) high load 10 Hours
Continuous
 
18-Aug-24 07:30 18-Aug-24 12:30 ALTALINK Outage 865L (38s East Edmonton - 216s Knightsbridge), 38s 865N (38s East Edmonton), 216s 865X (216s Knightsbridge) cutover new alarms, controls, and statuses to new SCADA system 5 Hours
Daily
 
18-Aug-24 08:00 22-Aug-24 18:00 SUNCOR Outage 29PL9-25 (29EDD-94 Voyageur - 29EDD-61 Stony Island) tie in & initial energization of excitation transformer 4.42 Days
Continuous
 
18-Aug-24 12:31 18-Aug-24 17:30 ALTALINK Outage 738L (38s East Edmonton - 738AL tap), 38s 738W (38s East Edmonton) cutover new alarms, controls, and statuses to new SCADA system 4.98 Hours
Continuous
 
19-Aug-24 06:30 23-Aug-24 15:00 ATCO Outage 7L153 (609s Wheatland - 804s Wintering Hills), 804s 703 (804s Wintering Hills) maintenance 4.35 Days
Continuous
 
19-Aug-24 07:00 25-Aug-24 17:00 EPCOR Outage 72CH9 (987s Clover Bar - EP Hardisty), T3 (EP Hardisty), H723 (EP Hardisty), H724 (EP Hardisty) doble TX3 and HDS8, HDS9, HAB3 disconnects and H723 breaker maintenance 6.42 Days
Continuous
 
19-Aug-24 07:00 22-Aug-24 17:00 EPCOR Outage EP 803s T1 (EP 803s Lambton) conservator leak repair and PDR 3.42 Days
Continuous
 
19-Aug-24 07:00 25-Aug-24 17:00 ALTALINK, EPCOR Outage 1239L (330p Genesee - 510s Sunnybrook), 330p 1205 (330p Genesee), 330p 1206 (330p Genesee) Genesee: 1239L CVT, Arrestor Doble and 1239LD, 1205b, 1206B Disconnect Maintenance and 1239L, 1205, 1206 P&C Maintenance 6.42 Days
Continuous
 
19-Aug-24 07:00 19-Aug-24 17:00 ALTALINK TE 186s Protection & Control (186s Dry Creek) relay maintenance 10 Hours
Daily
 
19-Aug-24 07:00 19-Aug-24 17:00 ALTALINK TE 378s Protection & Control (378s Shell Caroline) maintenance on the relays 10 Hours
Daily
 
19-Aug-24 07:00 15-Oct-24 08:00 ALTALINK Outage 19s 240kV Bus A (19S Wabamun), 19s 240kV Transfer Bus (19S Wabamun) salvage 19s78,19s35,19s51,19s PT 684, 685,686, 19s250,19s191,19s192,19s45,19s46,19s61,19s63,19s62,19s81,19s82,19s904, 19s83,19s84,19s96,19s99,19s64,19s194,19s193,19s54. RSLD 2 to be implemented after outage is complete. Issue salvage clearance on 19s 240kV ‘A’ & Transfer Busses. 57.04 Days
Continuous
 
19-Aug-24 07:30 22-Aug-24 18:00 ALTALINK Outage 889L (535s Joffre - 536s Brookfield), 536s T1 (536s Brookfield), 535s 106 (535s Joffre) SCADA project at 535s, station equipment maintenance at 536s 3.44 Days
Continuous
 
19-Aug-24 07:30 30-Aug-24 17:30 ALTALINK RB 677L (305s Acheson - 595s Spruce Grove) complete OPGW splicing at structure 1 & 30. 11.42 Days
Daily
 
19-Aug-24 08:00 28-Aug-24 18:00 SUNCOR Outage 29EDD-65 260kV Bus 29PP-0049 (29EDD-65), 29EDD-65 29-952-4813 (29EDD-65), 29EDD-65 29-952-4823 (29EDD-65) maintenance 9.42 Days
Continuous
 
19-Aug-24 08:00 23-Aug-24 16:00 ENMAX Outage 5.8TR (SS-5) Tap changer replacement. 5.8TR Cabinet heater failed-replace. Oil Sampling MT, TC. Check reversing switch. 4.33 Days
Continuous
 
19-Aug-24 08:00 22-Aug-24 16:00 ATCO RB 7L09 (823s Wapiti - 7L03 tap) Changing Rotten Cross Arm under live line technique 3.33 Days
Continuous
 
19-Aug-24 08:00 29-Aug-24 17:30 ALTALINK TE 349s RTU/SCADA (349s Stavely) update RTU for AIS1147 modification 10.4 Days
Daily
 
19-Aug-24 08:00 04-Sep-24 16:00 ENMAX Outage 1.84L (SS-1 - SS-5) Cable pulling work on Structure 26 above the 1.84L potheads – old 2.82L slack span removal in 5 Sub 16.33 Days
Continuous
 
19-Aug-24 08:00 22-Aug-24 17:00 ALTALINK TE 535s RTU/SCADA (535s Joffre) download new configurations and migrating and commissioning of 889L protection, 535s106 controls 3.38 Days
Daily
 
19-Aug-24 08:00 02-Sep-24 16:00 Syncrude Outage Mildred T2 (Syncrude Mildred Lake), 2235 (Syncrude Mildred Lake), 235 (Syncrude Mildred Lake), 234 (Syncrude Mildred Lake) SCL - complete replacement of potheads, and cables on transformer T2 14.33 Days
Continuous
 
19-Aug-24 08:00 20-Aug-24 16:00 ENMAX TE Protection & Control (SS-23) 23sub 138kV Bus Differential Pritection Outage. 23 Sub Auto switching protection Upgrade 1.33 Days
Daily
 
19-Aug-24 08:00 22-Aug-24 16:00 ENMAX Outage 34.2TR (SS-34) transformer power factor, relay fault pressure and secondary cable tests and transformer maintenance 3.33 Days
Continuous
 
19-Aug-24 08:00 22-Aug-24 16:00 ENMAX Outage 39.2TR (SS-39) transformer power factor, relay fault pressure and secondary cable tests and transformer maintenance 3.33 Days
Continuous
 
19-Aug-24 08:00 20-Aug-24 16:00 ENMAX TE Protection & Control (SS-2) 2 sub 138kV bus differential protection Z32 "A" outage for relay protection test - 2RLY138-2.Z32 A GE 1.33 Days
Continuous
 
19-Aug-24 08:00 19-Aug-24 16:00 ENMAX Outage 1.84L (SS-1 - SS-5) Repair grounding deficiency on line surge arrestors 8 Hours
Continuous
 
19-Aug-24 08:30 20-Aug-24 17:00 ATCO Outage 763s 507C (763s Hanna) PCB Program - Replace Cap Bank Wafers on 507C @ 763s Hanna
BREAKER VACUUM R2 COMPLETE TESTING - 507 @ 763S
TCM Program. RTXP Test Switch Mitigation and Replacement: 51-27-59/507C @ 763S
1.35 Days
Continuous
 
19-Aug-24 09:00 24-Aug-24 16:00 ATCO Outage 7L48 (794s Valleyview - 7LA48 tap) Changing Poles on a road crossing issues 5.29 Days
Continuous
 
19-Aug-24 09:00 25-Aug-24 17:00 ALTALINK RB 757L (17s Benalto - 758L tap), 757L (297s Rimbey - 758L tap) Replace STR 74-87. 6.33 Days
Daily
 
19-Aug-24 09:00 21-Aug-24 17:30 ATCO TE ATCO RTU/SCADA 6502S Empress Solar RTU Upgrades & Changes, Local isolations as required. Solar control ramp rate settings changes. RTAC will be rebooted causing momentary drops in production. SOC will have brief losses of visibility during updates/reboots (<10 mins). 2.35 Days
Continuous
 
19-Aug-24 09:30 25-Aug-24 17:00 ALTALINK, EPCOR IO 1239L (330p Genesee - 510s Sunnybrook) Genesee: 1239L CVT, arrestor doble and 1239LD, 1205b, 1206B disconnect maintenance and 1239L, 1205, 1206 P&C maintenance 6.31 Days
Continuous
 
19-Aug-24 09:30 20-Aug-24 17:30 ATCO Outage 813s 704 (813s Little Smoky) complete SF6 HGFtesting 1.33 Days
Continuous
 
19-Aug-24 10:00 23-Aug-24 16:00 ATCO Outage 796s 702T (796s Nipisi) perform tap changer maintenance with MR rep and test tap changer 4.25 Days
Continuous
 
19-Aug-24 10:00 06-Sep-24 16:00 ATCO TE 710s RTU/SCADA (710s Vermilion) Project:
Site prep, wire tracing, cable pull.
Working near in-service equipment.
710s SCADA Config Changes loss of visibility for 5-10min at a time during downloads
18.25 Days
Continuous
 
19-Aug-24 10:30 21-Aug-24 12:30 ALTALINK Outage 535s T1 (535s Joffre), 535s 138kV Bus 2 (535s Joffre), 535s T3 (535s Joffre), 535s T5 (535s Joffre), 889L (535s Joffre - 536s Brookfield), 535s 6652 (535s Joffre) 535s52 switch motor mech replacement and testing 2.08 Days
Continuous
 
19-Aug-24 11:00 22-Aug-24 17:00 ALTALINK TE 159s Protection & Control (159s Colinton) implement fault reporting. 3.25 Days
Daily
 
19-Aug-24 11:00 22-Aug-24 17:00 ALTALINK TE 159s RTU/SCADA (159s Colinton) update config to implement fault reporting. 3.25 Days
Daily
 
19-Aug-24 12:30 20-Aug-24 17:00 ALTALINK Outage 205s 452 (205s Castle Rock Ridge) 205s452 Maint. First Trip 28.5 Hours
Daily
 
19-Aug-24 12:30 22-Aug-24 16:30 ALTALINK Outage 83s T3 (83s Taber), 83s 64 (83s Taber) 83sT3 Maintenance, TC oil replacement 3.17 Days
Continuous
 
19-Aug-24 13:00 22-Aug-24 15:30 ATCO Outage 7L159 (948s Heatburg - 7LA159 tap), 948s 704 (948s Heatburg) replace structures for 7L159 line to ground clearance mitigation 3.1 Days
Continuous
 
19-Aug-24 13:00 22-Aug-24 17:30 ALTALINK Outage 89s 952 (89s Ellerslie) Breaker maint. + First Trip, repair riser hot spot 3.19 Days
Continuous
 
19-Aug-24 13:30 22-Aug-24 17:30 ALTALINK Outage 410s T1 (410s Josephburg) Rad leaks, doble and LR/SFRA testing, added more T1 leaks 3.17 Days
Continuous
 
20-Aug-24 07:00 20-Aug-24 17:00 ALTALINK TE 428s Protection & Control (428s Namaka) Relay maintenance. Redundant protection remains in service. 10 Hours
Daily
 
20-Aug-24 07:00 29-Aug-24 17:00 ALTALINK, EPCOR IO 920L (37s North Calder - 557s Castle Downs) AltaLink will work 37s substation and require 920LW line outage 9.42 Days
Continuous
 
20-Aug-24 07:15 29-Aug-24 16:45 ALTALINK, EPCOR Outage 920L (37s North Calder - 557s Castle Downs), 37s 82 (37s North Calder), 37s 88 (37s North Calder), 37s 87 (37s North Calder) remove old breaker (37s88) and switch (37s87), foundation work, install new breaker (37s88), install new string insulators, wire new breaker and install risers 9.4 Days
Continuous
 
20-Aug-24 08:00 21-Aug-24 17:00 ALTALINK TE AltaLink Telecom Equipment We will be replacing the existing dish at BCH 9912R Morrisey ridge, this outage will impact 1201L RAS for 50ms while being re-routed. Redundant channel will be in service at all times. Impact to 887L RAS DTT not available for 50ms. 1.38 Days
Daily
 
20-Aug-24 08:00 21-Aug-24 16:00 ENMAX Outage 3.82L (SS-3 - SS-8) CT terminal replacements in LCC E5 1.33 Days
Continuous
 
20-Aug-24 08:00 29-Aug-24 17:00 ALTALINK TE 37s RTU/SCADA (37s North Calder) RTU database update, several ~15min supervisory outages required over this period. Qualified switchmen on site for the duration 9.38 Days
Daily
 
20-Aug-24 08:00 20-Aug-24 18:00 ALTALINK TE 120s RTU/SCADA (120s Picture Butte) MPLS Raw socket conversion at 120S, supervisory circuit "SPV-1192 MATL 120S ACC" and SPV-1033 Picture Butte 120S ACC will be down for 2 hours. 10 Hours
Daily
 
20-Aug-24 08:00 20-Aug-24 17:00 ALTALINK TE 562s RTU/SCADA (562s Cypress), AltaLink Telecom Equipment This is for access and outage to 562s to complete a raw socket conversion on 7705A. 562s Visibility will be OOS for 2hrs during the outage. 9 Hours
Daily
 
20-Aug-24 08:00 20-Aug-24 17:00 ALTALINK TE AltaLink Telecom Equipment, 394s RTU/SCADA (394s Empress) This is for access and outage to 394s to complete a raw socket conversion on 7705A. 394s Visibility will be OOS for 2hrs during the outage. 9 Hours
Daily
 
20-Aug-24 08:00 20-Aug-24 17:00 ALTALINK TE 428s RTU/SCADA (428s Namaka) Repair remote access. Update RTU config to correct alarm label. Loss of visibility of 428s for 15 minutes in the timeframe indicated. 9 Hours
Daily
 
20-Aug-24 08:00 20-Aug-24 17:00 ALTALINK Outage 995s T1 (995s Yarrow) Customer switchgear maintenance 9 Hours
Daily
 
20-Aug-24 08:00 20-Aug-24 17:00 ALTALINK, TRANSALTA TE 1063s RTU/SCADA (1063s Windrise) Techs to troubleshoot the suspect SMP4 and replace if a reboot does not return it back to working.Momentary losses of visibility when completing configuration download (site is currently suspect). D 9 Hours
Daily
 
20-Aug-24 09:00 25-Aug-24 17:00 BCH Outage 5L92 (BCH Cranbrook - BCH Selkirk) 5L92 replace insulators & spacers, BC maintenance does not affect the Alberta ATC 5.33 Days
Continuous
AB-BC
20-Aug-24 09:30 21-Aug-24 17:30 ATCO Outage 834s 903 (834s Wesley Creek)
PRC-005 - trip coil testing, 903B phase counter replacement at 834s Wesley Creek
1.33 Days
Continuous
 
20-Aug-24 10:00 20-Aug-24 15:00 ATCO TE ATCO Telecom Equipment Muskeg River_S-Telecom.
Updating lowbes firewalls at Muskeg river Substation, expected outage is all network traffic for a total of less than 10 seconds.
847s SCADA impact approximately for 90 minutes
5 Hours
Continuous
 
20-Aug-24 13:00 26-Aug-24 18:00 ATCO, CNRL Outage 859s 703 (859s Primrose), 859s 702 (859s Primrose), 859s 702A (859s Primrose), 859s 703A (859s Primrose), 859s 703B (859s Primrose) 25kV GIS Project requires outage on 702 and 703 breakers for tie-ins of interconnection wiring. 6.21 Days
Continuous
 
21-Aug-24 07:00 21-Aug-24 17:00 ALTALINK TE 253s Protection & Control (253s Blackie) techs to complete PRC maintenance on the following relay BAT1 27/BAT CSL3860010 10 Hours
Daily
 
21-Aug-24 07:00 21-Aug-24 17:00 ALTALINK TE 349s Protection & Control (349s Stavely) relay maintenance 10 Hours
Daily
 
21-Aug-24 07:15 24-Aug-24 17:45 ALTALINK Outage 202L (58s Edson - 178s Cynthia), 58s 202X (58s Edson), 178s 202N (178s Cynthia) system upgrade on structure 560, 563, 647, 764, 784 3.44 Days
Continuous
 
21-Aug-24 08:00 21-Aug-24 12:00 ATCO RB 7LA48 tap connect mobile substation 902S to 7LA48 4 Hours
Continuous
 
21-Aug-24 08:00 21-Aug-24 17:00 ALTALINK TE 535s Protection & Control (535s Joffre) perform trip and block close testing to 535s106 breaker during 889L outage from T3 protections 9 Hours
Daily
 
21-Aug-24 08:00 23-Aug-24 16:00 ENMAX Outage 23.4TR (SS-23) 23 Sub auto switching protection upgrade 2.33 Days
Continuous
 
21-Aug-24 08:00 28-Aug-24 17:00 ATCO Outage 6L11 (743s Sarah Lake - 854s Swan Dive), 743s 603 (743s Sarah Lake) changing out structures 39-46 as part of TCM L-G mitigation, project 1106736 7.38 Days
Continuous
 
21-Aug-24 08:00 21-Aug-24 17:00 ALTALINK TE AltaLink Telecom Equipment, 404s RTU/SCADA (404s Peace Butte) complete a raw socket conversion on 7705A 9 Hours
Daily
 
21-Aug-24 08:00 22-Aug-24 16:00 ENMAX TE Protection & Control (SS-2) 2 Sub 138kV bus differential protection Z31 "B" outage, relay protection test - 2RLY138-2.Z32 B SEL 1.33 Days
Continuous
 
21-Aug-24 08:00 22-Aug-24 14:00 ENMAX Outage 22.1TR (SS-22) grounding improvements 30 Hours
Continuous
 
21-Aug-24 08:00 23-Aug-24 17:00 ALTALINK TE 178s Protection & Control (178s Cynthia) settings change 2.38 Days
Daily
 
21-Aug-24 09:00 23-Aug-24 16:00 ALTALINK TE 58s Protection & Control (58s Edson) settings change 2.29 Days
Daily
 
21-Aug-24 09:30 22-Aug-24 17:30 ATCO Outage 813s 707 (813s Little Smoky) SF6 HGF complete testing 1.33 Days
Continuous
 
22-Aug-24 07:00 22-Aug-24 17:00 ALTALINK TE 281s Protection & Control (281s Johnson) PRC maintenance on relays 10 Hours
Daily
 
22-Aug-24 07:00 22-Aug-24 17:00 ALTALINK TE 525s Protection & Control (525s Carseland) relay maintenance, 10 Hours
Daily
 
22-Aug-24 08:00 27-Aug-24 12:00 ATCO Outage 7L224 (650s Hansman Lake - 774s Monitor) Pole change under TCM L-L mitigation project 1102671 5.17 Days
Continuous
 
22-Aug-24 08:00 27-Aug-24 16:00 ALTALINK Outage 650s 224 (650s Hansman Lake) pole change under TCM 5.33 Days
Continuous
 
22-Aug-24 08:00 23-Aug-24 16:00 ENMAX Outage 23.80L (74s Janet - SS-23), 23.4TR (SS-23) 23 Sub Auto switching protection Upgrade 1.33 Days
Continuous
 
22-Aug-24 08:00 22-Aug-24 17:00 ALTALINK TE AltaLink Telecom Equipment, 438s RTU/SCADA (438s Westlock) 9374R to 438s radio maintenance. 9 Hours
Daily
 
22-Aug-24 09:00 22-Aug-24 16:00 ALTALINK TE 510s Protection & Control (510s Sunnybrook) repair bus differential 510s Sunnybrook AC filter bank 7 Hours
Daily
 
22-Aug-24 09:30 23-Aug-24 17:30 ATCO Outage 834s 904 (834s Wesley Creek) test switch mitigation and replacement 1.33 Days
Continuous
 
22-Aug-24 10:00 23-Aug-24 16:00 ATCO Outage 820s 702 (820s Hangingstone), 7L97 (820s Hangingstone - 7LA97 tap) breaker maintenance 30 Hours
Continuous
 
22-Aug-24 10:00 22-Aug-24 15:00 ATCO TE ATCO Telecom Equipment updating low bes firewalls at McMillan Substation, 5 Hours
Continuous
 
22-Aug-24 10:00 22-Aug-24 14:00 ATCO TE ATCO Telecom Equipment Bes firewall install. 4 Hours
Continuous
 
23-Aug-24 08:00 31-Aug-24 18:00 SUNCOR Outage 29PL9-24 (29EDD-94 Voyageur - 29EDD-60 Inglis Island) BP(Pulkit) - 29PL9-24 Powerlines between 29EDD94 & 29EDD60 Outage in order to Tie in & Initial Energization of Excitation Transformer 30PT-471 8.42 Days
Continuous
 
23-Aug-24 08:00 23-Aug-24 17:00 ALTALINK TE AltaLink Telecom Equipment, 454s RTU/SCADA (454s Buck Lake) upgrade 9495R MPLS node. 9 Hours
Daily
 

Prepared On:   2024-08-14   15:31:52

This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein.