Alberta Electric System Operator | |
System Co-ordination Plan | |
2024-06-13 to 2024-06-21 | |
Approved Outages |
Previous Version | |
Download CSV |
From | To | Owner | Type | Element | Scheduled Activity | Date/Time Comments | Interconnection |
---|---|---|---|---|---|---|---|
05-Oct-18 08:00 | 31-Dec-24 16:00 | EPCOR | IO | C2 (Rossdale) | forced outage | 2,279.38 Days
Continuous |
|
24-Oct-18 01:13 | 31-Dec-24 16:00 | EPCOR | IO | C1 (Rossdale) | forced outage | 2,260.66 Days
Continuous |
|
04-Sep-22 16:50 | 30-Sep-24 18:00 | ATCO | Outage | 848s 401R (848s Ruth Lake) | forced outage | 757.05 Days
Continuous |
|
31-Jul-23 14:56 | 27-Sep-24 16:00 | ENMAX | Outage | 38B138-38.1CAP (SS-38), 38.1C (SS-38) | motor run time fail | 424.04 Days
Continuous |
|
27-Nov-23 08:00 | 07-Mar-25 16:00 | ENMAX | Outage | 32.2TR (SS-32) | 32 sub 32.2TR 8 kV bus switchgear demolition | 466.33 Days
Continuous |
|
08-Jan-24 07:00 | 14-Jun-24 17:00 | EPCOR | Outage | T2 (Rossdale), R721 (Rossdale), R723 (Rossdale), RAB2 (Rossdale) | rossdale transformer assembly and scaffold build | 158.38 Days
Continuous |
|
19-Feb-24 10:00 | 17-Jun-24 17:00 | ATCO | TE | 863s RTU/SCADA (863s Paintearth) | modifications to existing RTU and new SCADA equipment | 119.25 Days
Continuous |
|
07-Mar-24 06:30 | 29-Aug-24 16:00 | ALTALINK | Outage | 477s T1 (477s Amoco West Pembina) | disconnect T1 and VR1 permanently, draining oil, release 477s T1, VR1, & 4.16kV equipment for salvage and RSLD2 then RSLD3 to be implemented at end of outage | 175.35 Days
Continuous |
|
02-Apr-24 07:00 | 30-Jun-24 17:00 | EPCOR | Outage | T1 (Garneau), GT1 (Garneau) | Garneau S/S Tx1 bay outage | 89.42 Days
Continuous |
|
09-Apr-24 15:00 | 18-Jun-24 16:30 | ALTALINK | Outage | 151s C1 (151s Strathmore) | broken | 70.06 Days
Continuous |
|
18-Apr-24 09:00 | 14-Jun-24 16:00 | ATCO | TE | 716s RTU/SCADA (716s Lloydminster) | lloyd sub rebuild is completed in stages and therefore SCADA verifications performed at varying times | 57.29 Days
Continuous |
|
23-Apr-24 08:00 | 27-Sep-24 16:00 | ENMAX | Outage | 41.2TR (SS-41) | forced outage - differential protection trip | 157.33 Days
Continuous |
|
29-Apr-24 07:00 | 02-Aug-24 17:00 | EPCOR | TE | 557s Protection & Control (557s Castle Downs) | protection blocking for annual relay maintenance | 95.42 Days
Continuous |
|
06-May-24 07:00 | 08-Nov-24 17:00 | EPCOR | Outage | EP 511s Victoria T1 (EP 511s Victoria) | Victoria: TX1 LCR, civil, demo, and construction | 186.46 Days
Continuous |
|
07-May-24 07:00 | 30-Jun-24 17:00 | EPCOR | TE | 330p Protection & Control (330p Genesee) | 138/500kV protection blocking for Repower Project Cut-Overs | 54.42 Days
Continuous |
|
12-May-24 12:00 | 17-Jul-24 17:30 | ATCO | TE | 788s RTU/SCADA (788s Hotchkiss) | 500SST1(AC/DC/SCADA), 701TCS, and 701T | 66.23 Days
Continuous |
|
13-May-24 07:00 | 21-Jun-24 17:00 | EPCOR | Outage | 805s T3 (805s Jasper) | tap changer rebuild w/Hitachi and oil processing w/stark | 39.42 Days
Continuous |
|
20-May-24 08:00 | 21-Jun-24 16:00 | ENMAX | Outage | 5.10TR (SS-5) | transformer protection upgrade | 32.33 Days
Continuous |
|
21-May-24 07:00 | 21-Jun-24 17:00 | EPCOR | Outage | 816s P2403 (816s Petrolia) | breaker LCR | 31.42 Days
Continuous |
|
21-May-24 13:30 | 13-Jun-24 17:30 | ALTALINK | Outage | 12s T1 (12s Heartland), 12s 1452 (12s Heartland), 12s 1752 (12s Heartland), 12s 3689 (12s Heartland) | internal inspection, hotspot repair (12s3689), breaker maintenance (12s1752) | 23.17 Days
Continuous |
|
28-May-24 08:00 | 13-Jun-24 16:00 | REDDEER | Outage | 217s T2 (217s North Red Deer) | 14T2 RTD replacement and transformer testing | 16.33 Days
Continuous |
|
01-Jun-24 08:00 | 14-Jun-24 16:00 | ATCO, ALBIAN | Outage | 920s 901T (920s Jackpine), 920s 901 (920s Jackpine), 920s A1 (920s Jackpine) | repair SF6 gas leaks in 72kV GIS switchgear | 13.33 Days
Continuous |
|
03-Jun-24 07:00 | 16-Jun-24 18:00 | ALTALINK | Outage | 701L (223s Strome - 395s North Holden), 395s 701X (395s North Holden) | 701L CRU & WMP component replacement | 13.46 Days
Continuous |
|
03-Jun-24 07:00 | 30-Aug-24 17:00 | EPCOR | Outage | EP 511s Victoria T1 (EP 511s Victoria), EP 511s V721 (EP 511s Victoria), EP 511s V722 (EP 511s Victoria) | Victoria: TX1 LCR. Civil, Demo, and Construction | 88.42 Days
Continuous |
|
03-Jun-24 08:00 | 27-Jun-24 17:30 | ALTALINK | TE | 255s RTU/SCADA (255s Vulcan) | Enterprise project - update RTU for AIS1147 modification | 24.4 Days
Daily |
|
03-Jun-24 08:00 | 26-Jul-24 17:00 | ALTALINK | TE | 15s RTU/SCADA (15s Fort Macleod) | updating RTU configuration for the addition of a new RTU | 53.38 Days
Daily |
|
03-Jun-24 08:00 | 14-Jun-24 16:00 | ATCO | Outage | 2075s 901T (2075s Newell), 2075s ACF11 (2075s Newell), 2075s ACF12 (2075s Newell), 2075s ACF13 (2075s Newell), 2075s ACF14 (2075s Newell), 2075S 927 (2075s Newell), 2075S 928 (2075s Newell), 2075S 929 (2075s Newell), 2075S 934 (2075s Newell) | filter bank AC maintenance and green guard installation | 11.33 Days
Continuous |
|
03-Jun-24 08:00 | 13-Jun-24 17:30 | ALTALINK | TE | 28s RTU/SCADA (28s West Brooks) | Enterprise project - update RTU for AIS1147 modification | 10.4 Days
Daily |
|
03-Jun-24 09:00 | 16-Jun-24 16:00 | ATCO | Outage | 7L32 (813s Little Smoky - 862s South Bezanson) | pole replacement from test and treat | 13.29 Days
Continuous |
|
03-Jun-24 10:00 | 18-Jun-24 12:00 | ATCO | Outage | 730s STATCOM (730s Rycroft), 730s 705 (730s Rycroft) | SVC annual inspection and fire system inspection | 15.08 Days
Continuous |
|
07-Jun-24 08:00 | 13-Jun-24 17:00 | ALTALINK | TE | 580s Protection & Control (580s Sylvan Lake) | protection cutovers | 6.38 Days
Continuous |
|
10-Jun-24 07:00 | 15-Jun-24 17:00 | EPCOR | Outage | 72DS26 (665s Dome - Strathcona), T1 (Strathcona), S721 (Strathcona), S722 (Strathcona), SAB1 (Strathcona) | doble and disconnect maintenance | 5.42 Days
Continuous |
|
10-Jun-24 07:00 | 28-Jun-24 17:00 | EPCOR | Outage | 72NW15 (Namao - Woodcroft), N726 (Namao), W723 (Woodcroft) | pole replacement and pole straightening | 18.42 Days
Continuous |
|
10-Jun-24 07:30 | 14-Jun-24 16:30 | ALTALINK | Outage | AML 511s 240kV ACF 2 Bus (511s Crossings), AML 511s 5052 (AML 511s Crossings), AML 511s 4952 (AML 511s Crossings), AML 511s ACF21 (AML 511s Crossings), AML 511s ACF22 (AML 511s Crossings) | annual ACF 21, 22 inspections | 4.38 Days
Continuous |
|
10-Jun-24 07:30 | 14-Jun-24 18:00 | ALTALINK, NOVAC | Outage | 535s 5652 (535s Joffre), 535s 5552 (535s Joffre), 330L1 (535s Joffre - 330s Nova Joffre) | migrate and commission all associated line protections | 4.44 Days
Continuous |
|
10-Jun-24 08:00 | 17-Jun-24 07:00 | CNRL, ATCO | Outage | 859s 52G (859s Primrose), 859s 701T (859s Primrose), 859s Protection & Control (859s Primrose) | 701T will be isolated to start work on 25kV switchgear project |
6.96 Days
Continuous |
|
10-Jun-24 08:00 | 30-Sep-24 18:00 | ATCO, CNRL | Outage | 859s 501TD (859s Primrose) | replace 25kV Switchgear to new GIS | 112.42 Days
Continuous |
|
10-Jun-24 08:00 | 16-Jun-24 17:00 | ALTALINK | TE | 163s RTU/SCADA (163s Amoco Empress) | update configuration and testing to implement new bus protection - for 1004s Bullseye | 6.38 Days
Daily |
|
10-Jun-24 08:00 | 19-Jun-24 16:00 | ENMAX | Outage | 8B138-6A0 (SS-8) | Install new BMR-6a0, change out CT terminal blocks in E6 panel | 9.33 Days
Continuous |
|
10-Jun-24 08:00 | 28-Jun-24 16:00 | ENMAX | TE | Protection & Control (SS-8) | SS8 autoswitching for Z67(Old) (8.1TR & 8.2TR) to be permanently disabled for demo | 18.33 Days
Continuous |
|
10-Jun-24 08:00 | 24-Jun-24 16:00 | Syncrude | Outage | 25 (Aurora), UT2 (Aurora) | need to isolate the 15kv bus for inspection repair | 14.33 Days
Continuous |
|
10-Jun-24 08:00 | 14-Jun-24 17:00 | ALTALINK | TE | 535s RTU/SCADA (535s Joffre) | supervisory visibility outage required to download new configurations and migrating and commissioning of 330L1A protections, recloser, 5652 alarms controls and status | 4.38 Days
Continuous |
|
10-Jun-24 08:00 | 14-Jun-24 17:00 | ALTALINK | TE | 233s RTU/SCADA (233s Beamer) | update and test configuration for DDR installation | 4.38 Days
Daily |
|
10-Jun-24 08:00 | 13-Jun-24 17:30 | ALTALINK | TE | 504s RTU/SCADA (504s Queenstown) | update RTU for AIS1147 modification - required for Enterprise project | 3.4 Days
Daily |
|
10-Jun-24 08:00 | 13-Jun-24 16:00 | ENMAX | Outage | 38.3TR (SS-38) | transformer power factor test - 38.3TR, secondary cable test, transformer maintenance, relay fault pressure test, check reversing switch, oil sampling MT, TC | 3.33 Days
Continuous |
|
10-Jun-24 09:00 | 14-Jun-24 17:00 | BCH | RB | 2L113 (BCH Cranbrook - BCH Natal) | 40-01 to 45-01 CANFOR logging for burnt timber | 4.33 Days
Continuous |
AB-BC |
10-Jun-24 09:00 | 14-Jun-24 17:00 | BCH | RB | 5L92 (BCH Cranbrook - BCH Selkirk) | replacing Flashed insulators via BAREHAND methods | 4.33 Days
Continuous |
AB-BC |
10-Jun-24 09:30 | 13-Jun-24 16:00 | ATCO | Outage | 7LA53 (969s Lindbergh - 7L53 tap), 969s 701T (969s Lindbergh), 969s 501 (969s Lindbergh), 969s 701 (969s Lindbergh), 969s 301 (969s Lindbergh) | maintenance, and leak repairs |
3.27 Days
Continuous |
|
10-Jun-24 09:30 | 14-Jun-24 14:00 | ALTALINK | Outage | 161L (255s Vulcan - 504s Queenstown), 255s 138kV Bus 1 (255s Vulcan), 255s T1 (255s Vulcan), 255s 1152 (255s Vulcan), 504s 161 (504s Queenstown), 255s 352 (255s Vulcan) | install and commission new Bus 1 ‘B’ protection | 4.19 Days
Continuous |
|
10-Jun-24 10:00 | 21-Jun-24 17:30 | ATCO | Outage | 786s SVC (786s High Level), 786s 703T (786s High Level), 786s 703 (786s High Level) | 703T leak repair check up , 703T remediation, civil work, and containment installation |
11.31 Days
Continuous |
|
10-Jun-24 14:00 | 13-Jun-24 17:00 | ALTALINK | Outage | 746s T2 (746s Sherwood Park) | 25kV bushing replacement, doble, maintenance, leaks | 3.13 Days
Continuous |
|
11-Jun-24 07:00 | 17-Jul-24 17:00 | ATCO | TE | 788s Protection & Control (788s Hotchkiss) | block 144kV bus differential relay during 701T GOI | 36.42 Days
Continuous |
|
11-Jun-24 08:00 | 21-Jun-24 09:59 | ATCO | Outage | 788s 701T (788s Hotchkiss), 788s 701TCS (788s Hotchkiss), 788s 702 (788s Hotchkiss) | remove 701TCS, add NEW 707 breaker and switch 707A. Add new 701T | 10.08 Days
Continuous |
|
11-Jun-24 08:00 | 21-Jun-24 17:30 | ATCO | TE | 788s Protection & Control (788s Hotchkiss) | temporary settings update on 7L51 & 7L82 protection relays | 10.4 Days
Continuous |
|
11-Jun-24 08:00 | 21-Jun-24 17:30 | ATCO | TE | ATC 793s Protection & Control (ATC 793s West Peace River) | temporary settings update on 7L51 protection relays | 10.4 Days
Continuous |
|
11-Jun-24 08:00 | 21-Jun-24 17:30 | ATCO | TE | 853s Protection & Control (853s Ring Creek), 853s RTU/SCADA (853s Ring Creek) | temporary settings update on 7L82 protection relays | 10.4 Days
Continuous |
|
11-Jun-24 08:00 | 16-Jun-24 16:00 | ENMAX | TE | Protection & Control (SS-36) | 36PT138-Z31 secondary fuse outage. 36 sub DFR install | 5.33 Days
Daily |
|
11-Jun-24 08:00 | 16-Jun-24 16:00 | ENMAX | Outage | 36.3TR (SS-36) | 36 sub DFR installation | 5.33 Days
Continuous |
|
11-Jun-24 08:00 | 16-Jun-24 16:00 | ENMAX | Outage | 36.1TR (SS-36) | 36 sub DFR installation | 5.33 Days
Continuous |
|
11-Jun-24 08:00 | 13-Jun-24 16:00 | ALTALINK | Outage | 163s T5 (163s Amoco Empress), 163s 1552 (163s Amoco Empress), 163s 1252 (163s Amoco Empress), 163s T1 (163s Amoco Empress), 163s 989 (163s Amoco Empress), 163s 189 (163s Amoco Empress) | connect CTs, test trip, for 1004s Bullseye project, replace SS1 | 2.33 Days
Continuous |
|
11-Jun-24 08:00 | 13-Jun-24 17:00 | ALTALINK | TE | 580s RTU/SCADA (580s Sylvan Lake) | Update RTU config for new maintenance switches, New DER ‘A’ relay, new AIS relay, new T2 ‘B’/DER ‘B’ relay, updates to L9 feeder protection relay. Short loss of visibility (2-15 Minutes) during update about 4 times each day. | 2.38 Days
Continuous |
|
11-Jun-24 08:30 | 14-Jun-24 17:30 | ALTALINK | Outage | 748L (267s Killarney Lake - 277s Hayter), 277s 138kV Bus 1 (277s Hayter), 277s T1 (277s Hayter), 277s 189 (277s Hayter), 277s 852 (277s Hayter), 277s 748 (277s Hayter), 277s 2 (277s Hayter), 277s 952 (277s Hayter) | 277s 189 switch replacement, 277s 2 switch replacement, TX protection upgrade | 3.38 Days
Continuous |
|
11-Jun-24 09:00 | 14-Jun-24 17:00 | ALTALINK | TE | 277s Protection & Control (277s Hayter) | trip testing for new T1 protection upgrade | 3.33 Days
Daily |
|
11-Jun-24 18:45 | 13-Jun-24 10:00 | ATCO, ALTALINK | Outage | 7L701 (757s Battle River - 7LA701 tap), 7LA701 (764s Heisler - 7L701 tap), 701L (223s Strome - 7LA701 tap) | forced outage | 1.64 Days
Continuous |
|
11-Jun-24 18:55 | 14-Jun-24 18:00 | ATCO | Outage | 7L85 (801s Anderson - ATC 803s Bullpound) | forced outage | 2.96 Days
Continuous |
|
11-Jun-24 19:08 | 21-Jun-24 18:00 | ATCO | Outage | 9L950 (132s Ware Junction - 801s Anderson) | forced outage | 9.95 Days
Continuous |
|
12-Jun-24 07:00 | 14-Jun-24 18:00 | ALTALINK, GWPCORP | Outage | 603L (138s Windy Flats - 243s Soderglen), 243s T1 (243s Soderglen Wind Farm), 243s C1 (243s Soderglen Wind Farm), 243s 25CB1 (243s Soderglen), 243s 138DS1 (243s Soderglen) | mainenance 603L between structures #1 - 109 | 2.46 Days
Continuous |
|
12-Jun-24 07:00 | 14-Jun-24 17:00 | ALTALINK | TE | 277s RTU/SCADA (277s Hayter) | RTU database update | 2.42 Days
Daily |
|
12-Jun-24 08:00 | 20-Jun-24 18:00 | SUNCOR | Outage | 29EDD-18 29PT-100 (29EDD-18 Firebag), 29EDD-18 29-752-102 (29EDD-18 Firebag), 29EDD-18 29-752-103 (29EDD-18 Firebag), 29EDD-18 29PS-0055 (29EDD-18 Firebag), 29EDD-18 29PS-0056 (29EDD-18 Firebag) | FB - 450092664 29EDD18;29PT-100 SYSTEM;PM 5y |
8.42 Days
Continuous |
|
12-Jun-24 08:00 | 13-Aug-24 17:00 | ALTALINK | TE | AltaLink RTU/SCADA (AltaLink) | Fortis is replacing the power feed to Nakiska ski hill gold chair, which in turn feeds our 9115R radio site. | 62.38 Days
Continuous |
|
12-Jun-24 08:00 | 13-Jun-24 16:00 | ENMAX | Outage | 162.4TR (SS-162) | tap changer inspection - 162.4-TC, oil sampling MT, TC, tap changer oil filtration maintenance, check reversing switch | 1.33 Days
Continuous |
|
12-Jun-24 08:00 | 14-Jun-24 16:00 | ATCO | Outage | 7L81 (791s Rainbow Lake - BCH Harvest Energy FNC Tap), 791s 702 (791s Rainbow Lake) | BC Hydro is requesting a COG/GOI on 7L81 to install two new disconnect switches and restore the temporary line cut | 2.33 Days
Continuous |
|
12-Jun-24 09:00 | 13-Jun-24 17:00 | BCH | RB | 2L294 (BCH A. A. Lambert - BCH Cranbrook), 2L294 (BCH A. A. Lambert - BCH Nelway) | proximity live line for barehand work on 5L92 at 153-2 | 1.33 Days
Continuous |
AB-BC |
12-Jun-24 10:00 | 13-Jun-24 16:00 | ALTALINK | RB | 1201L (520s Bennett - BCH Cranbrook) | replace flashed insulators using BAREHAND methods | 30 Hours
Daily |
|
12-Jun-24 11:00 | 13-Jun-24 17:00 | BCH, ALTALINK | RB | 5L94 (BCH Cranbrook - 102s Langdon), 1201L (520s Bennett - BCH Cranbrook) | replace flashed insulators using barehand methods | 30 Hours
Continuous |
AB-BC |
12-Jun-24 12:00 | 14-Jun-24 17:30 | ATCO | Outage | 905s 708 (905s Meikle) | PRC-005 - trip coil testing | 2.23 Days
Continuous |
|
12-Jun-24 16:01 | 28-Jun-24 18:00 | ATCO | RB | 7L81 (791s Rainbow Lake - BCH Harvest Energy FNC Tap) | helicopter work in proximity to 1L359 | 16.08 Days
Continuous |
|
12-Jun-24 23:00 | 13-Jun-24 03:00 | ALTALINK | Outage | 62s 11 (62s Brazeau Plant) | maintenance | 4 Hours
Daily |
|
13-Jun-24 03:00 | 13-Jun-24 07:00 | ALTALINK | Outage | 62s 12 (62s Brazeau Plant) | maintenance | 4 Hours
Daily |
|
13-Jun-24 07:00 | 18-Jun-24 18:00 | ALTALINK | Outage | 409s T1 (409s Shell Scotford) | installation of new 138KV bus B protection requiring CT contributions from T1 | 5.46 Days
Continuous |
|
13-Jun-24 07:00 | 20-Jun-24 18:00 | ALTALINK | Outage | 233s T1 (233s Beamer) | install DDR circuits to transformer and low side breakers, replace T1 transformer bushings | 7.46 Days
Continuous |
|
13-Jun-24 07:00 | 18-Jun-24 17:00 | ALTALINK | TE | 409s Protection & Control (409s Shell Scotford) | protection outage on A87/138B2 to facilitate the implementation of new B87/138B2 | 5.42 Days
Daily |
|
13-Jun-24 07:00 | 13-Jun-24 18:00 | ALTALINK, DOW | Outage | 707L (54s Fort Saskatchewan - 166s Dow Chemical Fort Saskatchewan), 54s 707N (54s Fort Saskatchewan), 166s 707X (166s Dow Chemical Fort Saskatchewan) | tighten hardware on structure, install new ground rod and repair downlead, re-tie OHSW |
11 Hours
Continuous |
|
13-Jun-24 07:00 | 14-Jun-24 17:00 | ALTALINK, EPCOR | Outage | 1055L (629s Argyll Transfer Station - 816s Petrolia), 240BA3 (629s Argyll Transfer Station - 814s Bellamy), 816s P2403 (816s Petrolia), 816s P2402 (816s Petrolia), 816s PDS11 (816s Petrolia) | breaker P2403 LCR commissioning (PDS11 Op Checks) | 1.42 Days
Continuous |
|
13-Jun-24 08:00 | 13-Jun-24 16:00 | ENMAX | Outage | 26.81L (SS-26 - SS-32), 32B138-26.81 (SS-32) | breaker maintenance | 8 Hours
Continuous |
|
13-Jun-24 08:00 | 13-Jun-24 17:00 | ALTALINK | TE | AltaLink Telecom Equipment | 9244R Bowmanton work | 9 Hours
Daily |
|
13-Jun-24 08:00 | 13-Jun-24 16:00 | ENMAX | Outage | 6.80L (SS-6 - SS-35), 6.4TR (SS-6), 6B138-6.80 (SS-6) | power factor test - 6PT138-6.80 and 6PT138-Z31 | 8 Hours
Continuous |
|
13-Jun-24 08:00 | 13-Jun-24 17:00 | ALTALINK | TE | 429s Protection & Control (429s Nelson Lake) | standard relay maintenance | 9 Hours
Daily |
|
13-Jun-24 08:00 | 13-Jun-24 17:00 | ALTALINK | TE | 429s RTU/SCADA (429s Nelson Lake) | RTU database update | 9 Hours
Daily |
|
13-Jun-24 08:30 | 15-Jun-24 09:15 | ALTALINK | Outage | 326s 1012 (326s Murray Lake) | urgent customer request for isolation @ 326s | 2.03 Days
Continuous |
|
13-Jun-24 10:00 | 13-Jun-24 17:00 | ATCO | TE | ATCO Telecom Equipment, 875s RTU/SCADA (875s Algar) | low bes firewall install | 7 Hours
Continuous |
|
13-Jun-24 12:00 | 13-Jun-24 17:00 | ATCO | RB | 7L76 (786s High Level - 832s Blumenort) | high load move 7L76-4 | 5 Hours
Continuous |
|
14-Jun-24 08:00 | 16-Jun-24 17:00 | ALTALINK | Outage | 163s T2 (163s Amoco Empress) | replace SS2, and lightning arresters | 2.38 Days
Continuous |
|
14-Jun-24 08:00 | 21-Jun-24 12:00 | ENMAX | Outage | 2.83L (SS-5 - 2.83L tap), 5B138-2.83 (SS-5) | 2.83L T-tap 5 Sub leg. Outage for pulling and racking new cable up structure 24 and return OH to service afte | 7.17 Days
Continuous |
|
14-Jun-24 08:00 | 16-Jun-24 16:00 | ENMAX | Outage | 7.84L (SS-7 - SS-36) | 36 sub DFR install | 2.33 Days
Continuous |
|
14-Jun-24 08:00 | 14-Jun-24 16:00 | ALTALINK | Outage | 163s C1 (163s Amoco Empress), 163s C2 (163s Amoco Empress) | connect CTs, test trip for 1004s Bullseye project | 8 Hours
Daily |
|
14-Jun-24 08:00 | 14-Jun-24 12:00 | ENMAX | Outage | 2.83L (SS-5 - 2.83L tap), 2.83L (SS-2 - 2.83L tap), 2.83L (SS-13 - 2.83L tap), 5B138-2.83 (SS-5), 13B138-2.83 (SS-13) | outage required to open 2.83L T-TAP 5sub leg. 5sub leg to remain out of service on return. | 4 Hours
Continuous |
|
14-Jun-24 08:00 | 14-Jun-24 12:00 | ENMAX | Outage | 38.83L (SS-38 - SS-39), 38B138-38.83 (SS-38) | breaker SF6 gas sample - 38B138-38.83 | 4 Hours
Continuous |
|
14-Jun-24 08:00 | 14-Jun-24 17:00 | ALTALINK | TE | AltaLink Telecom Equipment, 353s RTU/SCADA (353s Plamondon) | upgrade 353s MPLS node | 9 Hours
Daily |
|
14-Jun-24 12:00 | 14-Jun-24 16:00 | ENMAX | Outage | 13.82L (SS-13 - SS-22), 13B138-13.82 (SS-13) | breaker SF6 gas sample - 13B138-13.82 | 4 Hours
Continuous |
|
14-Jun-24 17:31 | 20-Jun-24 17:30 | ALTALINK | Outage | 277s T1 (277s Hayter), 277s 189 (277s Hayter), 277s 852 (277s Hayter), 277s 2 (277s Hayter) | 25 kV switch (277s11) / breaker (277s324X, 277s324N) replacements, SCADA and relay addition | 6 Days
Continuous |
|
15-Jun-24 07:00 | 18-Jun-24 17:00 | ENMAX, ALTALINK | TE | 653s Protection & Control (653s Summit) | update RAS49-50-51 SCADA controls | 3.42 Days
Daily |
|
15-Jun-24 07:00 | 18-Jun-24 17:00 | ALTALINK, GLPC | TE | 1055s Protection & Control (1055s Sollair) | update RAS49-50-51 SCADA controls | 3.42 Days
Daily |
|
15-Jun-24 07:00 | 18-Jun-24 17:00 | ALTALINK | TE | 199s Protection & Control (199s East Airdrie) | update RAS49-50-51 SCADA controls | 3.42 Days
Daily |
|
15-Jun-24 07:00 | 18-Jun-24 17:00 | ENMAX, ALTALINK | TE | 653s RTU/SCADA (653s Summit) | rename and update alarms for RAS relays | 3.42 Days
Daily |
|
15-Jun-24 07:00 | 18-Jun-24 17:00 | ALTALINK, GLPC | TE | 1055s RTU/SCADA (1055s Sollair) | rename and update alarms for RAS relays | 3.42 Days
Daily |
|
15-Jun-24 08:00 | 15-Jun-24 18:00 | ENMAX | Outage | 37.81L (SS-37 - SS-38), 38.2TR (SS-38), 38.3TR (SS-38), 38.1C (SS-38), 37B138-37.81 (SS-37), SW83 (SS-38) | power factor test - 38PT138-Z5, SW87 corrective, hot spot SW82 at 38 sub North phase jaw end | 10 Hours
Continuous |
|
16-Jun-24 08:00 | 16-Jun-24 16:00 | ENMAX | Outage | 39.82L (SS-39 - SS-162), 39B138-39.82 (SS-39), 162MD138-39.82 (SS-162) | power factor test - 39B138-39.82-CT | 8 Hours
Continuous |
|
16-Jun-24 09:00 | 18-Jun-24 16:00 | SUNCOR | Outage | 30EDD-1 624T (30EDD-1), 30EDD-1 627 (30EDD-1), 30EDD-1 628 (30EDD-1) | BP - TA maintenance - 30PL2-49 | 2.29 Days
Continuous |
|
17-Jun-24 06:00 | 17-Jun-24 19:00 | EPCOR | Outage | 1164L (816s Petrolia - EP Riverview), RW2401 (EP Riverview), RW2402 (EP Riverview), 816s P2404 (816s Petrolia), 816s P2403 (816s Petrolia) | P&C commissioning, LCR and aerial insulator replacement | 13 Hours
Continuous |
|
17-Jun-24 07:00 | 17-Jun-24 17:00 | EPCOR | Outage | T1 (Kennedale) | breaker cell inspection | 10 Hours
Continuous |
|
17-Jun-24 07:30 | 20-Jun-24 17:30 | ALTALINK | RB | 603L (138s Windy Flats - 243s Soderglen) | maintenance 603L between structures #1 - 109 | 3.42 Days
Daily |
|
17-Jun-24 07:30 | 17-Jun-24 10:30 | ALTALINK | RB | 612L (336s Fincastle - 368s Burdett) | removing an underbuilt spar arm and guy attachment on structure #181 | 3 Hours
Daily |
|
17-Jun-24 08:00 | 27-Jun-24 16:00 | ATCO | RB | 9L56 (720s Wabasca - 876s Brintnell) | walk up and climbing inspection | 10.33 Days
Continuous |
|
17-Jun-24 08:00 | 24-Jun-24 16:00 | ATCO | RB | 7L23 (796s Nipisi - 7L23 tap), 7L23 (858s Narrows Creek - 7L23 tap), 7L23 (732s Mitsue - 7L23 tap) | walk up and climbing inspection | 7.33 Days
Continuous |
|
17-Jun-24 08:00 | 20-Jun-24 16:00 | ATCO | RB | 7L120 (788s Hotchkiss - 905s Meikle) | walk up and climbing inspection | 3.33 Days
Continuous |
|
17-Jun-24 08:00 | 20-Jun-24 16:00 | ATCO | RB | 7L138 (788s Hotchkiss - 905s Meikle) | walk up and climbing inspection | 3.33 Days
Continuous |
|
17-Jun-24 08:00 | 21-Jun-24 17:00 | ALTALINK | TE | 233s RTU/SCADA (233s Beamer) | Update and test config for DDR installation, 735L protection replacement, & 233s46 PT addition. Supervisory will be in local control. No ACC visibility for 60 min during update. Restoration time 4 hours. RTU restored each day. | 4.38 Days
Daily |
|
17-Jun-24 08:00 | 17-Jun-24 16:00 | ENMAX | Outage | 1.81L (SS-1 - SS-20), 20B138-1.81 (SS-20) | HV breaker maintenance - 20B138-1.81 | 8 Hours
Continuous |
|
17-Jun-24 08:00 | 21-Jun-24 16:00 | ALTALINK | TE | 349s Protection & Control (349s Stavely) | update settings and test | 4.33 Days
Continuous |
|
17-Jun-24 08:00 | 17-Jun-24 16:00 | ENMAX | Outage | 31.84L (SS-31 - SS-32), 31B138-31.84 (SS-31) | power factor test | 8 Hours
Continuous |
|
17-Jun-24 08:00 | 21-Jun-24 16:00 | ALTALINK | TE | 15s Protection & Control (15s Fort Macleod) | update 180L protections to 255s | 4.33 Days
Daily |
|
17-Jun-24 08:00 | 21-Jun-24 17:00 | ALTALINK | TE | 15s RTU/SCADA (15s Fort Macleod) | update RTU to add 180L breaker fail transfer trip alarms | 4.38 Days
Daily |
|
17-Jun-24 08:00 | 21-Jun-24 13:00 | ALTALINK | TE | 55s RTU/SCADA (55s Olds) | add SCADA I/O, 2037S protection upgrade, T2 B protection | 4.21 Days
Continuous |
|
17-Jun-24 08:00 | 21-Jun-24 16:00 | ALTALINK | TE | 255s Protection & Control (255s Vulcan) | testing 452 C60 breaker controls | 4.33 Days
Daily |
|
17-Jun-24 08:00 | 11-Jul-24 17:00 | ALTALINK | TE | 281s RTU/SCADA (281s Johnson), AltaLink Telecom Equipment | DWDM hardware upgrades- 2024 CR&U at 281s | 24.38 Days
Daily |
|
17-Jun-24 08:00 | 19-Jun-24 17:00 | ALTALINK | TE | 510s RTU/SCADA (510s Sunnybrook), AltaLink Telecom Equipment | DWDM hardware upgrades- 2024 CR&U at 510s Sunnybrooks DC | 2.38 Days
Daily |
|
17-Jun-24 08:00 | 17-Jul-24 17:00 | ALTALINK | TE | AltaLink RTU/SCADA (AltaLink) | DWDM hardware upgrades- 2024 CR&U at 9520R | 30.38 Days
Continuous |
|
17-Jun-24 08:00 | 21-Jun-24 18:00 | ATCO | TE | ATCO RTU/SCADA | Implement changes to 6500S Barlow Solar SCADA and RTAC to uprate site export and implement new volt-watt control mode. Changes may cause temporary loss of visuals on HMI screen and cause export fluctuations while commissioning new control function. | 4.42 Days
Continuous |
|
17-Jun-24 08:00 | 21-Jun-24 18:00 | ATCO | TE | ATCO RTU/SCADA | Implement changes to 6501S Deerfoot Solar SCADA and RTAC to uprate site export and implement new volt-watt control mode. Changes may cause temporary loss of visuals on HMI screen and cause export fluctuations while commissioning new control function. | 4.42 Days
Continuous |
|
17-Jun-24 08:00 | 20-Jun-24 16:00 | ENMAX | Outage | 54.1TR (SS-54) | transformer power factor test, secondary cable test, maintenance, relay fault pressure test, check reversing test and oil sampling MT, TC | 3.33 Days
Continuous |
|
17-Jun-24 08:00 | 18-Jun-24 16:00 | ENMAX | Outage | 21.1C (SS-21) | maintenance | 1.33 Days
Continuous |
|
17-Jun-24 08:00 | 20-Jun-24 16:00 | ENMAX | Outage | 31.2TR (SS-31) | tap changer inspection - 31.2-TC, reinhausen | 3.33 Days
Continuous |
|
17-Jun-24 08:00 | 11-Jul-24 16:00 | ALTALINK | TE | AltaLink Telecom Equipment, AltaLink RTU/SCADA (AltaLink) | DWDM hardware upgrades- 2024 CR&U at 9010R | 24.33 Days
Daily |
|
17-Jun-24 08:30 | 20-Jun-24 17:30 | ALTALINK | RB | 172L (83s Taber - 172EL tap), 172L (254s Coaldale - 172EL tap), 172EL (139s Hillridge - 172L tap) | FRM component replacement (STR 826-1017) - live line | 3.38 Days
Daily |
|
17-Jun-24 08:30 | 20-Jun-24 17:30 | ALTALINK | RB | 172L (254s Coaldale - 370s North Lethbridge) | FRM component replacement 172L1022-1195 - live line | 3.38 Days
Daily |
|
17-Jun-24 09:00 | 21-Jun-24 17:30 | ATCO | Outage | 822s 702 (822s Wolf Lake), 7L574 (822s Wolf Lake - 7L574 tap) | Investigate the low gas alarm and densimeter, SF6 top up pole. | 4.35 Days
Continuous |
|
17-Jun-24 09:00 | 17-Jun-24 12:00 | ATCO | Outage | 2014s 701T (2014s Halfway), 2014s 701 (2014s Halfway) | PRC-005 trip coil testing | 3 Hours
Continuous |
|
17-Jun-24 09:00 | 20-Jun-24 17:00 | ALTALINK, BHE | Outage | 879AL (719s Rattlesnake Ridge - 879L tap) | Completion of critical work scopes. This outage will involve multiple work scopes. Repair of oil leakage on Main Transformer. Installation of additional protection alarms on main transformer. | 3.33 Days
Continuous |
|
17-Jun-24 09:00 | 17-Jun-24 16:00 | ATCO | TE | 822s Wolf Lake RTU/SCADA | resolve Siemens remote access issue | 7 Hours
Continuous |
|
17-Jun-24 09:00 | 21-Jun-24 17:30 | ATCO | RB | 7L587 (822s Wolf Lake - 826s Marguerite Lake) | reclosing turned off | 4.35 Days
Continuous |
|
17-Jun-24 09:30 | 21-Jun-24 17:30 | ATCO | Outage | 12L70 (12s Heartland - 2029s Heathfield), 2029s 1202 (2029s Heathfield), 2029s 1203 (2029s Heathfield) | PRC-005 trip coil testing on breaker 1202/1203, relay testing | 4.33 Days
Continuous |
|
17-Jun-24 09:30 | 17-Jun-24 17:30 | ATCO | Outage | 7L32 (811s Clairmont Lake - 862s South Bezanson), 811s 710 (811s Clairmont Lake) | PRC-005 trip coil testing on breaker 710 | 8 Hours
Continuous |
|
17-Jun-24 09:30 | 21-Jun-24 14:00 | ALTALINK | Outage | 180L (255s Vulcan - 928s East Stavely), 255s T2 (255s Vulcan), 255s 289 (255s Vulcan), 255s 34 (255s Vulcan), 255s 352 (255s Vulcan) | install and commission new bus 2 ‘B’ protection, cutover over line LTO statues to AIS relay, replace 452 breaker control relay and replace breaker control module for 255s34 | 4.19 Days
Continuous |
|
17-Jun-24 10:00 | 05-Jul-24 17:30 | ATCO | Outage | 770s 703T (770s Three Hills), 770s 703 (770s Three Hills), 7L159 (770s Three Hills - 7L159 tap) | 2023 Apparatus Leak Repairs Program - 703T at 770S Three Hills 25kv Load transferred to 701T |
18.31 Days
Continuous |
|
17-Jun-24 10:00 | 20-Jun-24 16:00 | ATCO | Outage | 7L50 (757s Battle River - 491L tap), 757s 709 (757s Battle River), 757s 704T (757s Battle River) | 7L50 pole and arm replacement | 3.25 Days
Continuous |
|
17-Jun-24 12:01 | 17-Jun-24 15:00 | ATCO | Outage | 2014s 702T (2014s Halfway), 2014s 702 (2014s Halfway) | PRC-005 trip coil testing | 2.98 Hours
Continuous |
|
17-Jun-24 12:30 | 20-Jun-24 17:30 | ALTALINK | RB | 701L (223s Strome - 395s North Holden) | live line reclose block for 701L CRU and WMP component replacement (str 1-111) | 3.21 Days
Daily |
|
17-Jun-24 12:30 | 21-Jun-24 17:30 | ATCO | RB | 7L701 (757s Battle River - 7LA701 tap) | live line reclose block for 701L CRU and WMP component replacement (str 423 - 449) | 4.21 Days
Continuous |
|
17-Jun-24 12:30 | 21-Jun-24 17:30 | ALTALINK | RB | 701L (223s Strome - 7LA701 tap) | live line reclose block for 701L CRU and WMP component replacement (str 423 - 449) | 4.21 Days
Daily |
|
17-Jun-24 13:30 | 20-Jun-24 16:30 | ALTALINK | Outage | 799s T1 (799s Coleman) | maintenance and bushing replacement | 3.13 Days
Continuous |
|
18-Jun-24 07:00 | 22-Jun-24 17:00 | EPCOR | Outage | 1098L (EP 805s Jasper - Poundmaker), EP 805s J2401 (EP 805s Jasper), EP 805s J2407 (EP 805s Jasper) | JDS1 LCR | 4.42 Days
Continuous |
|
18-Jun-24 07:00 | 18-Jun-24 17:00 | EPCOR | Outage | T2 (Kennedale) | Kennedale: TX2 breaker cell inspection | 10 Hours
Continuous |
|
18-Jun-24 07:00 | 20-Jun-24 17:00 | ALTALINK | TE | 277s RTU/SCADA (277s Hayter) | update RTU database | 2.42 Days
Daily |
|
18-Jun-24 07:30 | 18-Jun-24 17:30 | ALTALINK | RB | 900L (17s Benalto - 63s Red Deer) | AML crews will be doing barehand training at 900L1 | 10 Hours
Daily |
|
18-Jun-24 08:00 | 19-Jun-24 11:00 | ALTALINK | Outage | 264s 240kV Bus 1 (264s Elkwater), 264s 452 (264s Elkwater) | remove riser from low bus to high bus and install new design with rigid bus in two locations and lower voltage tap on SSTX1 | 27 Hours
Continuous |
|
18-Jun-24 08:00 | 18-Jun-24 16:00 | ENMAX | Outage | 26.83L (SS-26 - SS-65), 26B138-26.83 (SS-26) | HV Breaker Maintenance - 26B138-26.83. 26B138-26.83 Broken Counter - Replace | 8 Hours
Continuous |
|
18-Jun-24 08:00 | 18-Jun-24 16:00 | ENMAX, ALTALINK | Outage | 7.82L (42s Sarcee - SS-7) | Power Factor Test - 7PT138-7.82 | 8 Hours
Continuous |
|
18-Jun-24 08:00 | 27-Jun-24 17:00 | ALTALINK | Outage | 677L (305s Acheson - 595s Spruce Grove) | Structure replacement. Replace OHSW with OPGW | 9.38 Days
Continuous |
|
18-Jun-24 08:00 | 27-Jun-24 17:00 | ALTALINK | RB | 453L (305s Acheson - 367s Harry Smith) | work on 677L in vicinity | 9.38 Days
Daily |
|
18-Jun-24 08:00 | 18-Jun-24 16:00 | ENMAX, ALTALINK | IO | 7.82L (42s Sarcee - SS-7) | power factor test - 7PT138-7.82 | 8 Hours
Daily |
|
18-Jun-24 08:00 | 18-Jun-24 16:00 | ENMAX | TE | Protection & Control (SS-8) | 8 sub Z65 A and B bus differential protection program and test DFR triggers | 8 Hours
Continuous |
|
18-Jun-24 09:00 | 18-Jun-24 12:00 | ATCO | Outage | 2060s 701 (2060s Engstrom) | prc-005 trip coil testing | 3 Hours
Continuous |
|
18-Jun-24 09:00 | 18-Jun-24 16:30 | ALTALINK | Outage | 151s C1 (151s Strathmore) | 151s44 low gas and SF6 camera investigation | 7.5 Hours
Daily |
|
18-Jun-24 09:00 | 21-Jun-24 17:00 | ATCO | TE | ATCO Telecom Equipment, 893s RTU/SCADA (893s Cavendish) | troubleshooting intermittent issue with the IRU radio link between Cappon_T and Cavendish_S. SUPEP186 |
3.33 Days
Continuous |
|
18-Jun-24 09:30 | 18-Jun-24 17:30 | ATCO | Outage | 811s 709 (811s Clairmont Lake) | PRC-005 - TRIP COIL TESTING - BREAKER 709 @ 811S TCM Program. RTXP Test Switch Mitigation and Replacement: 21A/7L39 @ 811S TCM Program. RTXP Test Switch Mitigation and Replacement: 21B/7L39 @ 811S |
8 Hours
Continuous |
|
18-Jun-24 10:00 | 18-Jun-24 16:00 | ATCO | Outage | 732s 901 (732s Mitsue) | prc-005 trip coil testing | 6 Hours
Continuous |
|
18-Jun-24 11:00 | 19-Jun-24 14:00 | ALTALINK | TE | AltaLink Telecom Equipment | Site access to add inline fuses this will require the Telecom cabinet and all components to be shut down including MPLS, Switch, Firewall, Multitel Fusion etc. 719s supervisory will be OOS for 30 minutes. | 27 Hours
Daily |
|
18-Jun-24 12:00 | 18-Jun-24 15:00 | ATCO | Outage | 2060s 702 (2060s Engstrom) | prc-005 trip coil testing | 3 Hours
Continuous |
|
19-Jun-24 07:00 | 19-Jun-24 16:00 | TRANSALTA, ALTALINK | Outage | 528s Blue Trail Wind Farm, 608AL (528s Blue Trail Wind Farm - 608L tap), 528s 138CB1 (528s Blue Trail Wind Farm), 528s 138MDS3 (528s Blue Trail Wind Farm) | maintenance on 138MDS4 at 528s | 9 Hours
Daily |
|
19-Jun-24 07:00 | 19-Jun-24 18:00 | ALTALINK | Outage | 812L (65s High River - 812AL tap), 812L (392s Black Diamond - 812AL tap), 812AL (512s Hartell - 812L tap), 512s T1 (512s Hartell) | Replace arms and insulators on Structure #179 | 11 Hours
Daily |
|
19-Jun-24 07:00 | 20-Jun-24 17:00 | EPCOR | TE | 816s Protection & Control (816s Petrolia) | protection blocking for commissioning of P2403 | 1.42 Days
Continuous |
|
19-Jun-24 07:30 | 19-Jun-24 17:30 | ALTALINK | RB | 757L (17s Benalto - 758L tap), 757L (297s Rimbey - 758L tap) | AML crews will be doing barehand training at 757L1A | 10 Hours
Daily |
|
19-Jun-24 07:30 | 19-Jun-24 17:30 | ALTALINK | Outage | 819L1 (819L Line) | required for AML crews will be doing barehand training at 757L1A | 10 Hours
Daily |
|
19-Jun-24 08:00 | 19-Jun-24 16:00 | ENMAX | Outage | 6.82L (SS-6 - SS-41), 6B138-6.82 (SS-6) | HV Breaker Maintenance - 6B138-6.82 | 8 Hours
Continuous |
|
19-Jun-24 08:00 | 19-Jun-24 16:00 | ALTALINK | TE | 255s Protection & Control (255s Vulcan) | A77/1147AIS, Relay will be taken out of service to update settings and test - Non redundant protection. | 8 Hours
Daily |
|
19-Jun-24 08:00 | 19-Jun-24 16:00 | ENMAX, ALTALINK | Outage | 832L (SS-10 - SS-12), 12.1TR (SS-12) | Power Factor Test - 12PT138-Z31 | 8 Hours
Continuous |
|
19-Jun-24 08:00 | 27-Jun-24 17:00 | ALTALINK | TE | AltaLink RTU/SCADA (AltaLink), AltaLink Telecom Equipment | DWDM hardware upgrades - 2024 CR&U at 9074R | 8.38 Days
Daily |
|
19-Jun-24 08:00 | 20-Jun-24 17:00 | ALTALINK | TE | AltaLink RTU/SCADA (AltaLink), AltaLink Telecom Equipment | DWDM hardware upgrades - 2024 CR&U at 9004R | 1.38 Days
Continuous |
|
19-Jun-24 08:00 | 20-Jun-24 16:00 | ENMAX | TE | RTU/SCADA (SS-25) | SCADA RTU Test - RTU-25. SCADA Alarm Test - RTU-25 ANN | 1.33 Days
Daily |
|
19-Jun-24 08:00 | 19-Jun-24 16:00 | ENMAX, ALTALINK | IO | 832L (SS-10 - SS-12) | Power Factor Test - 12PT138-Z31 | 8 Hours
Daily |
|
19-Jun-24 08:00 | 20-Jun-24 17:00 | ALTALINK | TE | 535s RTU/SCADA (535s Joffre) | download new configurations | 1.38 Days
Daily |
|
19-Jun-24 09:00 | 19-Jun-24 12:00 | ATCO | Outage | 2060s 703 (2060s Engstrom) | PRC-005 trip coil testing | 3 Hours
Continuous |
|
19-Jun-24 09:00 | 19-Jun-24 17:00 | ALTALINK | Outage | 256s C1 (256s Harmattan) | weed spraying and cap bank unbalance repair | 8 Hours
Daily |
|
19-Jun-24 09:30 | 20-Jun-24 17:30 | ATCO | Outage | 811s 708 (811s Clairmont Lake) | PRC-005 - TRIP COIL TESTING - BREAKER 708 @ 811S TCM Program. RTXP Test Switch Mitigation and Replacement: 21A/7L22 @ 811S TCM Program. RTXP Test Switch Mitigation and Replacement: 21B/7L22 @ 811S TCM Program. RTXP Test Switch Mitigation and Replacement: 50BF/708 @ 811S |
1.33 Days
Continuous |
|
19-Jun-24 10:00 | 19-Jun-24 16:00 | ATCO | Outage | 732s 903 (732s Mitsue) | PRC-005 trip coil testing | 6 Hours
Continuous |
|
19-Jun-24 10:00 | 19-Jun-24 17:00 | ATCO | TE | ATCO Telecom Equipment | low bes firewall install | 7 Hours
Continuous |
|
19-Jun-24 12:00 | 20-Jun-24 18:00 | ALTALINK, Wild Rose Wind 2 | Outage | 264s 240kV Bus 2 (264s Elkwater), 264s 240kV Bus 3 (264s Elkwater), 264s 89-B1 (264s Elkwater), 264s 352 (264s Elkwater), 264s 252 (264s Elkwater), 264s T1 (264s Elkwater), 264s 52-L1 (264s Elkwater), 264s 89-L1 (264s Elkwater), 264s 289 (264s Elkwater) | remove riser from low bus to high bus and install new design with rigid bus in two locations | 30 Hours
Continuous |
|
19-Jun-24 12:00 | 19-Jun-24 15:00 | ATCO | Outage | 2060S 704 (2060s Engstrom) | PRC-005 trip coil testing | 3 Hours
Continuous |
|
20-Jun-24 07:00 | 26-Jun-24 17:00 | ALTALINK | Outage | 74s T2 (74s Janet), 74s 77 (74s Janet) | upgrade transformer protection relays | 6.42 Days
Continuous |
|
20-Jun-24 07:00 | 26-Jun-24 17:00 | ALTALINK | TE | 74s RTU/SCADA (74s Janet) | SCADA configuration update | 6.42 Days
Daily |
|
20-Jun-24 07:00 | 28-Jun-24 17:00 | ALTALINK | Outage | 735L (171s Redwater - 233s Beamer) | 233s replace VSR with new 233s47 PT. 233s13 switch replacement. 233s DDR install. 735L line and BF protection change @ 233s. 735L line protection change @ 171s. 233s RSLD 1 to be implemented after outage is complete. | 8.42 Days
Continuous |
|
20-Jun-24 07:00 | 28-Jun-24 17:00 | ALTALINK | TE | 171s RTU/SCADA (171s Redwater) | cutover new 735L alarms, controls, and statuses to new SCADA system | 8.42 Days
Daily |
|
20-Jun-24 07:00 | 28-Jun-24 17:00 | ALTALINK | TE | 171s RTU/SCADA (171s Redwater) | update configuration for 735L protection upgrade | 8.42 Days
Daily |
|
20-Jun-24 07:00 | 28-Jun-24 17:00 | ALTALINK | TE | AltaLink Telecom Equipment, 233s Protection & Control (233s Beamer), 171s Protection & Control (171s Redwater) | equip 2 new channels between 171s and 233s and decommission the old circuits | 8.42 Days
Continuous |
|
20-Jun-24 07:30 | 23-Jun-24 17:30 | ALTALINK | RB | 900L (17s Benalto - 63s Red Deer) | crews will be doing barehand training at structure #900L1 | 3.42 Days
Daily |
|
20-Jun-24 07:30 | 20-Jun-24 17:30 | ALTALINK | RB | 848L (17s Benalto - 848AL tap), 848L (378s Shell Caroline - 848AL tap), 848AL (531s Shell Schrader Creek - 848L tap) | crews will be doing barehand training at structure #900L1 | 10 Hours
Daily |
|
20-Jun-24 08:00 | 20-Jun-24 16:00 | ENMAX | Outage | 31.84L (SS-31 - SS-32), 32B138-31.84 (SS-32) | HV Breaker Maintenance - 32B138-31.84 | 8 Hours
Continuous |
|
20-Jun-24 08:00 | 07-Oct-24 16:00 | Syncrude | Outage | 1315 (Syncrude Mildred Lake), 1314 (Syncrude Mildred Lake) | allow power distribution time to replace the 72 kV cables from plant 31 to C05 substation | 109.33 Days
Continuous |
|
20-Jun-24 08:00 | 20-Jun-24 16:00 | ENMAX, ALTALINK | Outage | 832L (SS-10 - SS-12) | Power Factor Test - 10PT138-832. | 8 Hours
Continuous |
|
20-Jun-24 08:00 | 20-Jun-24 18:00 | ALTALINK | TE | 264s RTU/SCADA (264s Elkwater) | implement SCADA changes for MOD and breaker fail alarm | 10 Hours
Daily |
|
20-Jun-24 08:00 | 20-Jun-24 16:00 | ENMAX, ALTALINK | IO | 832L (SS-10 - SS-12) | Power Factor Test - 10PT138-832. 1TR | 8 Hours
Daily |
|
20-Jun-24 08:00 | 20-Jun-24 18:30 | ALTALINK | TE | 277s Protection & Control (277s Hayter) | trip testing for new 25kV breakers | 10.5 Hours
Daily |
|
20-Jun-24 08:00 | 21-Jun-24 17:00 | ALTALINK | TE | 267s Protection & Control (267s Killarney Lake) | revert temporary settings | 1.38 Days
Daily |
|
20-Jun-24 08:00 | 20-Jun-24 16:00 | ENMAX | Outage | 12.1TR (SS-12) | check reversing switch and oil sampling | 8 Hours
Continuous |
|
20-Jun-24 09:00 | 20-Jun-24 17:00 | ATCO | RB | 788s 144kV Bus 700BUS1 (788s Hotchkiss) | 701T replacement project, removal of jumper J1 on 144kv bus at 788s Hotchkiss |
8 Hours
Continuous |
|
20-Jun-24 09:30 | 20-Jun-24 15:30 | ATCO | Outage | 834s 502R (834s Wesley Creek), 834s 501 (834s Wesley Creek) | trip coil testing on 502 breaker | 6 Hours
Continuous |
|
20-Jun-24 10:00 | 20-Jun-24 16:00 | ATCO | Outage | 732s 904 (732s Mitsue) | trip coil testing | 6 Hours
Continuous |
|
20-Jun-24 10:00 | 20-Jun-24 17:00 | ATCO | TE | ATCO Telecom Equipment | Low Bes Firewall Install, Total outage to IP Network access traffic for up to 90 minutes, Includes MICHICHI SCADA |
7 Hours
Continuous |
|
21-Jun-24 08:00 | 21-Jun-24 16:00 | ENMAX | Outage | 2.83L (SS-5 - 2.83L tap), 5.9TR (SS-5), 5.10TR (SS-5), 5B138-2.83 (SS-5), 5B138-5BT12 (SS-5), 5MD138-5.9TR (SS-5) | substation washing | 8 Hours
Continuous |
|
21-Jun-24 10:00 | 17-Jul-24 17:00 | ATCO | Outage | 788s 701T (788s Hotchkiss) | remove 701TCS, add new 707 breaker and switch 707A. Add NEW 701T, install jumper J1 to isolate low bus from high bus | 26.29 Days
Continuous |
|
21-Jun-24 13:00 | 21-Jun-24 18:00 | ENMAX | Outage | 2.83L (SS-2 - 2.83L tap), 2.83L (SS-13 - 2.83L tap), 13B138-2.83 (SS-13) | Outage required to return 2.83L T-TAP 5sub leg. | 5 Hours
Continuous |
This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein. © 2009 Alberta Electric System Operator. All rights reserved |