Alberta Electric System Operator
Long Range Significant Transmission Outages for the period of 24 months starting 2023-07-29

The table below contains the significant transmission outages submitted as tentative to the AESO.
These Outages have not yet necessarily been approved, but are listed for awareness and coordination purposes.
An Outage has been considered significant for this table if it meets any one (1) or more of the following criteria:
  1. it affects a transmission facility operating at two hundred and forty (240) kV or greater;
  2. it affects an intertie;
  3. it affects an element connecting facilities owned by two (2) or more different legal owners of transmission facilities;
  4. it affects an element that connects a generating unit or an aggregated generating facility to the interconnected electric system;
  5. it requires the ISO to issue a dispatch or directive for generation in order to facilitate the planned outage;
  6. it affects a cutplane limit;
  7. it limits or reduces the operability of a synchronous condenser, static VAr compensator, static compensator or other similar dynamic device; or
  8. it affects high voltage direct current facilities.
Note: Where a transmission outage requires generation curtailments, the adjustments to generation will typically happen in the hours before the scheduled transmission outage and in the hour after the element is returned to service.

Previous Version
Download CSV

Owner From To Duration Element Scheduled Activity Affected Intertie
ATCO 03-May-23 05:25 01-Aug-23 18:00 90.52 Days
Continuous
7L81 (791s Rainbow Lake - BCH Harvest Energy FNC Tap) forced outage due to fire  
ATCO 29-May-23 08:20 31-Jul-23 23:00 63.61 Days
Continuous
840s McNeill Station filter bank forced outage AB-SK
ATCO, AESO-SC 12-Jun-23 00:00 01-Aug-23 00:00 50 Days
Continuous
7L64 (747s Bassett - 930s Arcenciel), 7L64 (747s Bassett - 748s Haig River), 7L64 (748s Haig River - 779s Chinchaga River), 7L64 (779s Chinchaga River - 789s Keg River), 7L64-Pseudo (789s Keg River) forced outage due to fire  
ALTALINK 24-Jul-23 10:00 03-Aug-23 18:00 10.33 Days
Continuous
901L (63s Red Deer - 901AL tap), 901L (74s Janet - 901AL tap), 901AL (64s East Crossfield - 901L tap), 64s 240kV Bus (64s East Crossfield), 64s T2 (64s East Crossfield), 64s 901 (64s East Crossfield), 64s 30 (64s East Crossfield) Replace 64s29, 64s28 and CVT1 (64s32)  
ATCO 24-Jul-23 10:00 04-Aug-23 10:00 11 Days
Continuous
813s SVC (813s Little Smoky), 813s 706 (813s Little Smoky), 813s 712 (813s Little Smoky), 813s 719 (813s Little Smoky) protection cutover for 5&7 harmonic relays for SVC, wiring in 703T CT circuit  
BCH 24-Jul-23 11:00 11-Aug-23 17:00 18.25 Days
Continuous
2L293 (BCH Nelway - BCH Selkirk) replace timbers BC maintenance does not affect the Alberta ATC AB-BC
ATCO 24-Jul-23 13:00 04-Aug-23 17:00 11.17 Days
Continuous
939s 903T (939s Livock), 939s 910 (939s Livock), 939s 911 (939s Livock) 903T Maintenance  
ATCO 25-Jul-23 10:00 21-Aug-23 17:00 27.29 Days
Continuous
7L143 (766s Nevis - 769s Stettler), 7L16 (766s Nevis - 948s Heatburg), 766s 901T (766s Nevis), 766s 701T (766s Nevis) 766S Nevis Rebuild Project - P&C wiring and commissioning 7L16 and 701T protection upgrade, refurbish 701T tapchanger, replace 500D1/D2, and Bkr 502  
ATCO 25-Jul-23 13:30 31-Jul-23 14:00 6.02 Days
Continuous
7L760 (767s Oyen - 7LA760 tap) Pole change from test and treat 7L760 structures 406, 408, 409, 450, 455, 460, 461, 468, 471, 479, 494.
Pole change for clearance mitigation 7L760 structures 480, 492, 493
 
ATCO 25-Jul-23 16:00 25-Sep-23 17:00 62.04 Days
Continuous
7L574 (822s Wolf Lake - 7L574 tap), 7L587 (822s Wolf Lake - 826s Marguerite Lake), 7L86 (822s Wolf Lake - 1200s Foster Creek), 822s 701 (822s Wolf Lake), 822s 702 (822s Wolf Lake), 822s 703 (822s Wolf Lake), 822s 704 (822s Wolf Lake), 822s 701A (822s Wolf Lake), 822s 702A (822s Wolf Lake), 822s 703A (822s Wolf Lake) 822S Wolf lake P&C and SCADA Upgrade
Replace breakers 701, 702, and associated CT's, rewire 703, upgrade line protections
(Primrose fed from 970S Borque, Foster Creek fed from 826S Marguerite Lake via bypass)
 
ALTALINK 28-Jul-23 07:00 05-Aug-23 18:00 8.46 Days
Continuous
199L (268s Whitecourt - 199AL tap) urgent structure replacements  
EPCOR 31-Jul-23 07:00 23-Aug-23 17:00 23.42 Days
Continuous
1058L @ Lambton E803S and Summerside E657S, 1058L (657s Summerside - EP 803s Lambton) 1058L: Aerial- Structure Refurbishment Steel  
ALTALINK 31-Jul-23 07:30 31-Jul-23 17:30 10 Hours
Daily
158s 763X (158s Vauxhall) CT circuit wiring and change tap of ratio, CT Loop and Saturation. Wiring of breaker status to the relay. Tie-in output of new B87 Bus Diff in trip circuit. Change settings of 96/452 relay and element testing. Trip testing of breaker 158s763X  
EPCOR, ALTALINK 31-Jul-23 09:30 04-Aug-23 17:00 4.31 Days
Continuous
930L @ Poundmaker and North Calder 37S, 930L (37s North Calder - Poundmaker) 930L: Aerial- Broken Insulator Replacement and Marker Cones Upgrade  
ATCO 31-Jul-23 10:00 01-Aug-23 16:00 30 Hours
Continuous
845S 710, 7L44, 7L44 (749s Flyingshot Lake - 845s Big Mountain) breaker maintenance 710, switch inspections 709B, 710B  
ALTALINK 31-Jul-23 13:30 03-Aug-23 17:30 3.17 Days
Continuous
62s T3 (62s Brazeau Plant), 62s 31 (62s Brazeau Plant) 62sT3 LV (138kV) & Neutral (15kV) bushing replacements. Leak repairs.  
ALTALINK 01-Aug-23 07:30 01-Aug-23 12:30 5 Hours
Daily
158s 763N (158s Vauxhall) CT Circuit wiring, CT Loop and Saturation. Wiring of breaker status to the relay. Tie-in output of new B87 Bus Diff in trip circuit. Trip testing of breaker 158s763N  
ALTALINK 01-Aug-23 11:00 01-Aug-23 15:00 4 Hours
Daily
760L (163s Amoco Empress - 394s Empress), 394s 760N (394s Empress) 1st trip PRC5 maintenance  
ALTALINK 01-Aug-23 12:30 01-Aug-23 17:30 5 Hours
Daily
158s 821E (158s Vauxhall) CT Circuit wiring, CT Loop and Saturation. Wiring of breaker status to the relay. Tie-in output of new B87 Bus Diff in trip circuit. Trip testing of breaker 158s821E  
ATCO 02-Aug-23 10:00 04-Aug-23 16:00 2.25 Days
Continuous
845S 703, 7L228 (845s Big Mountain - 2091S), 845s 703 (845s Big Mountain), 7L228 (845s Big Mountain - 7L20 tap) breaker maintenance 703, switch inspections 703B, 704BB  
ENMAX, ALTALINK 03-Aug-23 08:00 03-Aug-23 16:00 8 Hours
Continuous
832L (SS-10 - SS-12), 10B138-832 (SS-10), 10.1TR (SS-10) HV breaker SF6 Gas Sample - 10B138-832L. 10MD138-10.1TR whips not set  
SUNCOR 04-Aug-23 08:00 13-Aug-23 18:00 9.42 Days
Continuous
29PP-98 Outage at 29EDD94 BP -29PP-98 outage for CBR scope & asset tie-ins
perform tie-in and commissioning of CT circuits
 
ATCOP, CNRL 06-Aug-23 08:00 13-Aug-23 17:00 7.38 Days
Continuous
838s 75-TR-1701 (838s Horizon Mining) Replace 34.5kV Bushings  
ALTALINK 08-Aug-23 08:00 11-Aug-23 17:00 3.38 Days
Continuous
754L (437s Baymag - 742L tap) Insulator change 754L91A. Str Change 79 and str 91A  
ATCO 08-Aug-23 10:00 09-Aug-23 16:00 30 Hours
Continuous
825s 904 (825s Whitefish Lake) investigative testing on Nissin CTs due to recent failure of 2 similar devices  
ALTALINK 08-Aug-23 10:00 10-Aug-23 18:00 2.33 Days
Continuous
64s T1 (64s East Crossfield) replace 25kV PT1 (64s24), adjust switch 64s589, replace SS1  
ALTALINK 09-Aug-23 07:00 09-Aug-23 18:00 11 Hours
Daily
787L (71s Lamoureux - 787AL tap) FRM component replacement 787L (Str 14-26)  
ALTALINK 09-Aug-23 07:00 11-Aug-23 18:00 2.46 Days
Continuous
795L (121s Brooks - 421s Hays) Installing bird diverters between Structures #30 - 357  
Saskpower 09-Aug-23 18:00 12-Aug-23 19:00 3.04 Days
Continuous
SaskPower A1R planned outage AB-SK
ALTALINK 10-Aug-23 07:00 10-Aug-23 18:00 11 Hours
Daily
787L (166s Dow Chemical Fort Saskatchewan - 787AL tap) FRM component replacement 787L (Str 37-39)  
ALTALINK 10-Aug-23 08:30 10-Aug-23 16:30 8 Hours
Daily
89s 1552 (89s Ellerslie) 1st trip & PRC5 maintenance, fix  
ATCO 10-Aug-23 10:00 10-Aug-23 16:00 6 Hours
Continuous
826s 904 (826s Marguerite Lake) investigative testing on Nissin CTs due to recent failure of 2 similar devices  
EPCOR 14-Aug-23 07:00 14-Aug-23 17:00 10 Hours
Continuous
52s E2401 (52s East Industrial), 52s T1 (52s East Industrial) East Industrial: Lighting Upgrade TX1 Side  
EPCOR 14-Aug-23 07:00 16-Aug-23 17:00 2.42 Days
Continuous
CD2406 @ Castledowns E557S, 557s CD2406 (557s Castle Downs) Castledowns: CD2406 Tank Heater Repair (034597)  
ALTALINK 14-Aug-23 07:30 17-Aug-23 16:30 3.38 Days
Continuous
510s ACF14 (510s Sunnybrook) Doble TX18882 Reactor, Breaker Dashpot Inspection and 6MD66 relay maintenance  
ENMAX 14-Aug-23 08:00 14-Aug-23 10:00 2 Hours
Continuous
25B240-D140 (SS-25) HV breaker SF6 Gas Sample - 25B240-D140  
ENMAX, ALTALINK 14-Aug-23 08:00 14-Aug-23 15:30 7.5 Hours
Continuous
932L (74s Janet - SS-162) transitioning from JMUX to JPAX in fiber ring 1  
ALTALINK 14-Aug-23 08:00 18-Aug-23 18:00 4.42 Days
Continuous
754L (118s Canmore - 437s Baymag) Working on str 91B, 99, 113, 114, 115, 121, 133, 134, 135, 137, 141, 143  
ALTALINK 14-Aug-23 09:00 17-Aug-23 18:00 3.38 Days
Continuous
64s 138kV Bus1 (64s East Crossfield), 64s T1 (64s East Crossfield), 64s T2 (64s East Crossfield), 64s 652 (64s East Crossfield) Replace 138kV CVT2 (64s27)  
ATCO 14-Aug-23 09:30 16-Aug-23 17:30 2.33 Days
Continuous
755S 903, 755s 903 (755s Cordel) BREAKER 903 SF6 GL315 COMPLETE TESTING  
ENMAX 14-Aug-23 10:00 14-Aug-23 13:00 3 Hours
Continuous
25B240-D141 (SS-25) HV breaker SF6 Gas Sample - 25B240-D141  
ATCO 14-Aug-23 10:00 15-Aug-23 16:00 30 Hours
Continuous
845S 707, 845S 708, 7L33 (749s Flyingshot Lake - 7LA33 tap) switch inspections 707B, 708B  
ATCO 14-Aug-23 11:00 18-Aug-23 17:30 4.27 Days
Continuous
840s McNeill Station, 840s 701T (840s McNeill Station), 840s 901T (840s McNeill Station), 840s Protection & Control (840s McNeill Station), 840s RTU/SCADA (840s McNeill Station), 840S 7L830D1 (840s McNeill Station), 840S 9LS1MD1 (840s McNeill Station) converter inspection and testing@ MCNEILL 840S
valve cooling maintenance @ MCNEILL 840S
AB-SK
ENMAX 14-Aug-23 13:00 14-Aug-23 16:00 3 Hours
Continuous
25B240-D142 (SS-25) HV breaker SF6 Gas Sample - 25B240-D142  
ALTALINK 14-Aug-23 13:00 17-Aug-23 17:00 3.17 Days
Continuous
87s T1 (87s Gaetz) maintain & test - PRC5  
EPCOR 15-Aug-23 07:00 15-Aug-23 17:00 10 Hours
Continuous
52s E2402 (52s East Industrial), 52s T2 (52s East Industrial) East Industrial: Lighting Upgrade TX2 Side  
ALTALINK 15-Aug-23 07:00 18-Aug-23 18:00 3.46 Days
Continuous
202L (61s Lodgepole - 62s Brazeau Plant Plant) Arctic Arrow will require a GOI on 202L LCM to replace structure 108, install Horizontal line posts and remove existing cross-arms on str’s 109-114. Install cross arm extension on str 116, 117.  
ENMAX 15-Aug-23 08:00 15-Aug-23 11:00 3 Hours
Continuous
25B240-D133 (SS-25) HV breaker SF6 Gas Sample - 25B240-D133  
SUNCOR 15-Aug-23 08:00 19-Aug-23 18:00 4.42 Days
Continuous
29PL9-16 (29EDD-1 Millennium - 29EDD-94 Voyageur), 29EDD-1 952-101 (29EDD-1 Millennium), 29EDD-1 952-102 (29EDD-1 Millennium), 29EDD-94 29-952-9701 (29EDD-94 Voyageur), 29EDD-94 29-952-9702 (29EDD-94 Voyageur), 29EDD-1 29PS-409 (29EDD-1 Millennium), 29EDD-94 29PS-397 (29EDD-94 Voyageur), 29EDD-94 29PP-97 260kV Bus (29EDD-94 Voyageur), 29EDD-94 29-952-9706 (29EDD-94 Voyageur) tie in CT CCT for new DFR  
SUNCOR 15-Aug-23 08:00 22-Aug-23 18:00 7.42 Days
Continuous
29EDD-34 29PT-341 (29EDD-34) BP-29PT-341 Sensing / Ground Resistor Clean, Repair and Sealing, 29EDD-34 DFR completion  
ENMAX 15-Aug-23 11:00 15-Aug-23 14:00 3 Hours
Continuous
25B240-D136 (SS-25) HV breaker SF6 Gas Sample - 25B240-D136  
EPCOR 16-Aug-23 07:00 18-Aug-23 17:00 2.42 Days
Continuous
816s P2402 (816s Petrolia) Petrolia: P2402 CT Doble  
SUNCOR 16-Aug-23 08:00 18-Aug-23 18:00 2.42 Days
Continuous
29EDD-94 Voyageur BP -Perform initial energization(including all the post energization checks) for the newly extended portion of Voyageur substation from 29PP-97 bus and 29PP-98 bus.  
EPCOR 17-Aug-23 07:00 17-Aug-23 17:00 10 Hours
Continuous
814s T2 (814s Bellamy), BR722 (Rossdale), 814s B2402 (814s Bellamy), 814s B2406 (814s Bellamy) Bellamy: TX2 Tap Changer Repair  
ENMAX 18-Aug-23 08:00 18-Aug-23 18:00 10 Hours
Continuous
65.2TR (SS-65), 65B138-D85 (SS-65), 65B138-D82 (SS-65), 65B240-D132 (SS-65), 65B240-D135 (SS-65) Summer Substation Washing  
ALTALINK 19-Aug-23 09:00 19-Aug-23 18:00 9 Hours
Daily
659s Pegasus Lake, 526BL (659s Pegasus Lake - 526L tap), 526L190 (526BL tap), 526L208 (519L tap), 659s T1 (659s Pegasus Lake), 659s T2 (659s Pegasus Lake) Connect mobile 475s to 526L and 25 kV bus 2 and replace 526L strain insulators. Replace 526L Strain insulators during mobile install  
SUNCOR 20-Aug-23 08:00 24-Aug-23 18:00 4.42 Days
Continuous
29PL9-17 (29EDD-1 Millennium - 29EDD-94 Voyageur), 29EDD-1 952-104 (29EDD-1 Millennium), 29EDD-1 952-105 (29EDD-1 Millennium), 29EDD-94 29-952-9706 (29EDD-94 Voyageur), 29EDD-94 29-952-9705 (29EDD-94 Voyageur) tie in CT CCT for new DFR  
EPCOR 21-Aug-23 07:00 21-Aug-23 17:00 10 Hours
Continuous
657s T1 (657s Summerside) Summerside: TX1 Tap Changer Maintenance  
EPCOR 21-Aug-23 07:00 22-Aug-23 17:00 1.42 Days
Continuous
987s C2401 (987s Clover Bar), 987s C2403 (987s Clover Bar), 987s CCP7213 (987s Clover Bar), 987s CCP7214 (987s Clover Bar), 987s T1 (987s Clover Bar) Cloverbar: TX1, P&C- 240kV Mimic Panel Decomm  
EPCOR 21-Aug-23 07:00 24-Aug-23 17:00 3.42 Days
Continuous
665s D2404 (665s Dome), 665s D2401 (665s Dome) Dome: D2401/D2404, P&C- DFR Upgrade  
ALTALINK 21-Aug-23 07:00 25-Aug-23 17:00 4.42 Days
Continuous
983AL (1019s Woolchester - 983L tap), 983L (244s Bowmanton - 983L tap), 983L (251s Whitla - 983L tap) installing laminate pole on T-tap to I-1019s @ Structure #117  
EPCOR 21-Aug-23 07:00 25-Aug-23 17:00 4.42 Days
Continuous
EP 803s L2401 (EP 803s Lambton), EP 803s L2402 (EP 803s Lambton), EP 803s T1 (EP 803s Lambton) Lambton: LDS3 Repair and TX1 Leak Repair  
ALTALINK 21-Aug-23 09:00 21-Aug-23 13:00 4 Hours
Daily
754L (245s Seebe - 742L tap), 754L (437s Baymag - 742L tap), 742L (985s Exshaw - 754L tap) Opening 754L65A to limit amount of line being de-energized to stay within allowable charging current limits.  
EPCOR, ALTALINK 21-Aug-23 09:30 01-Sep-23 17:00 11.31 Days
Continuous
920LW Zone @ Castledowns E557S and North Calder 37S, 920L (37s North Calder - 557s Castle Downs) Castledowns: CD2403/CD2401 Breaker Maintenance and 920LW CVT/Arrestor/CT Doble and CDDS2/CDDS3/CDDS12 Disconnect Maintenance  
ATCO, SUNCOR 21-Aug-23 09:30 07-Oct-23 16:00 47.27 Days
Continuous
848S 29PL9-2 Protection Relay, 848S 901, 848S 902, 29PL9-2, 848s 901 (848s Ruth Lake), 29PL9-2 (29EDD-1 Millennium - 848s Ruth Lake), 848s 902 (848s Ruth Lake) Suncor Capacity Increase project.
Suncor is reconductoring 29PL9-2, ATCO is completing a line protection upgrade in coordination with the outage
 
ATCO 21-Aug-23 09:30 17-Nov-23 16:00 88.31 Days
Continuous
848S 29PL9-1 Protection Relay, 848S 29PL9-1 SUNCOR ISLANDING RAS (IRAS), 848S 903, 848S 906, 848s 903 (848s Ruth Lake), 848s 906 (848s Ruth Lake) Suncor Capacity Increase project.
Suncor is reconductoring 29PL9-1, ATCO is completing a line protection upgrade in coordination with the outage
 
ATCO 21-Aug-23 10:00 25-Aug-23 17:30 4.31 Days
Continuous
825s 908 (825s Whitefish Lake), 825s 908C (825s Whitefish Lake), 825s 908R (825s Whitefish Lake) Unbalance alarms present in 908C. Replace 908PT  
ATCO 21-Aug-23 10:00 11-Sep-23 17:00 21.29 Days
Continuous
7L574 (822s Wolf Lake - 7L574 tap) 822S Wolf lake P&C and SCADA Upgrade
Work on Breaker 822S 702
Cut over cabling and protection to new panel
Line crew prep 7L86/7L574 bypass and connect to 7L574
Commission new protection including teleprotection DTT from 970S Bourque to 822S, install temp relay settings for 7L574/7L86 bypass
 
ALTALINK 21-Aug-23 13:00 21-Aug-23 15:30 2.5 Hours
Daily
370s 852 (370s North Lethbridge) 1st Trip PRC5 Breaker Maintenance  
ALTALINK 21-Aug-23 13:00 23-Aug-23 16:00 2.13 Days
Continuous
103s T1(Tx 18776) GOI, 103s T1 (103s Goose Lake) Doble, maintenance, connector, steam clean. Requested By: MAPS South  
ALTALINK 21-Aug-23 13:00 01-Sep-23 13:00 11 Days
Continuous
754L (245s Seebe - 742L tap) 754L Str 1-74 work  
ATCO 21-Aug-23 17:01 04-Dec-23 17:00 105.04 Days
Continuous
766s 901T (766s Nevis) This Permit has been created to capture the 901T outage for AESO. Other permits referenced are
2-62349, 2-62350 & 2-62356
 
ALTALINK, Lethbridge 22-Aug-23 06:30 22-Aug-23 16:30 10 Hours
Continuous
734L (241s Uplands - 370s North Lethbridge), 241s 734L (241s Uplands) replacing cabinet heater on 241s734l  
ENMAX, ALTALINK 22-Aug-23 08:00 22-Aug-23 12:00 4 Hours
Continuous
833L (SS-2 - SS-12) Transitioning from JMUX to JPAX in Fiber Ring 1  
ATCO 22-Aug-23 08:00 23-Aug-23 17:00 1.38 Days
Continuous
7L24 (700s Bonnyville - 7LA24 tap) Line to ground clearance mitigation pole replace 7L24 structure 54 & 64  
ALTALINK 22-Aug-23 08:00 24-Aug-23 17:00 2.38 Days
Continuous
935L (324s Cassils - 356s Milo) Installing new 240kV bridge for 240kV bay expansion. Line crossing over substation and need to isolate for installation of bridge. Required due to being inside LOA when installing steel 240kV bridge to tie A-frames together  
ALTALINK 22-Aug-23 08:30 24-Aug-23 13:30 2.21 Days
Continuous
171s T1 (171s Redwater) PRC5 maintenance, fix tap changer, replace hydran battery, test transformer  
ALTALINK 22-Aug-23 09:00 22-Aug-23 16:00 7 Hours
Daily
723s 252 (723s Christina Lake), 723s T2 (723s Christina Lake) 723s252 1st trip & PRC5 maintenance  
BCH 22-Aug-23 09:00 22-Aug-23 16:00 7 Hours
Continuous
5L92 (BCH Cranbrook - BCH Selkirk), 5CB3 (BCH Selkirk), 5CB4 (BCH Selkirk) inspection BC maintenance does not affect the Alberta ATC AB-BC
BCH 22-Aug-23 09:00 02-Sep-23 17:00 11.33 Days
Continuous
5L92 (BCH Cranbrook - BCH Selkirk) replace defective insulators and spacers BC maintenance does not affect the Alberta ATC AB-BC
ALTALINK, BHE Canada 22-Aug-23 10:30 22-Aug-23 14:30 4 Hours
Daily
120s 152 (120s Picture Butte) 1st Trip PRC5 Breaker Maintenance  
ENMAX 22-Aug-23 12:00 22-Aug-23 16:00 4 Hours
Continuous
35.81L (42s Sarcee - SS-35) Transitioning from JMUX to JPAX in Fiber Ring 1  
ALTALINK 22-Aug-23 12:00 22-Aug-23 16:00 4 Hours
Continuous
42s 35 (42s Sarcee) Transitioning from JMUX to JPAX in Fiber Ring 1  
EPCOR 23-Aug-23 07:00 25-Aug-23 17:00 2.42 Days
Continuous
987s T2 (987s Clover Bar), 987s CC721 (987s Clover Bar), 987s C2405 (987s Clover Bar), 987s C2406 (987s Clover Bar) Cloverbar: TX2, P&C- 240kV Mimic Panel Decomm  
ENMAX, ALTALINK 23-Aug-23 08:00 23-Aug-23 15:00 7 Hours
Continuous
932L (74s Janet - SS-162) transitioning from JMUX to JPAX in fiber ring 1  
ATCO, IMPERIALOIL 23-Aug-23 08:00 30-Sep-23 18:00 38.42 Days
Continuous
7L105 (837s Mahihkan - 909s Mahno), 7L161 (909s Mahno - 942s Nabiye), 909s 52A3 (909s MAHNO), 909s TNS-A1 (909s Mahno), 909s TNS-A2 (909s Mahno) maintenance  
ALTALINK 23-Aug-23 09:30 23-Aug-23 15:30 6 Hours
Daily
72s 752 (72s Leismer) 1st trip & PRC5 maintenance  
ATCO 23-Aug-23 10:00 24-Aug-23 16:00 30 Hours
Continuous
813s 719 (813s Little Smoky), 813s SVC (813s Little Smoky) vendor site visit to troubleshoot coolant high temperature trips  
ALTALINK 23-Aug-23 23:00 24-Aug-23 03:00 4 Hours
Daily
62s 11 (62s Brazeau Plant) maintenance  
ALTALINK 24-Aug-23 03:00 24-Aug-23 07:00 4 Hours
Daily
62s 12 (62s Brazeau Plant) maintenance  
ALTALINK 24-Aug-23 09:30 24-Aug-23 17:30 8 Hours
Daily
616L (59s Peigan - 616AL tap), 59s 616 (59s Peigan) 1st Trip PRC5 Breaker Maintenance  
ENMAX 25-Aug-23 08:00 25-Aug-23 16:00 8 Hours
Continuous
162.81L (391s Balzac - SS-162) Power factor test 162PT138-162.81. Surge Arrestor Power Factor Test - 162MD138-162.81  
ALTALINK 26-Aug-23 09:00 26-Aug-23 18:00 9 Hours
Daily
659s Pegasus Lake, 526BL (659s Pegasus Lake - 526L tap), 526L190 (526BL tap), 526L208 (519L tap), 659s T1 (659s Pegasus Lake), 659s T2 (659s Pegasus Lake) disconnect mobile 475s and install new 69 kV, 48 kV MCOV surge arrestors on line side 526L of 659s1  
EPCOR, ALTALINK 27-Aug-23 07:00 10-Sep-23 17:00 14.42 Days
Continuous
Genesee S/S 430L Bay Isolation, 430L (330P Genesee - 510S Sunnybrook) 1.String BB2L , BB2L1 to BB2L2 & 12TC2L , 12TC2L1 to 12TC2L3
2. String BB2L , BB2L1 to BB2L2 & 12TC2L , 12TC2L1 to 12TC2L3
 
EPCOR 28-Aug-23 07:00 28-Aug-23 17:00 10 Hours
Continuous
987s T3 (987s Clover Bar), 987s C2407 (987s Clover Bar) Cloverbar: TX3, P&C- 240kV Mimic Panel Decomm  
ALTALINK, EPCOR 28-Aug-23 07:00 29-Aug-23 17:00 1.42 Days
Continuous
947L (89s Ellerslie - 987s Clover Bar) Cloverbar: 947L, P&C- 240kV Mimic Panel Decomm  
EPCOR 28-Aug-23 07:00 31-Aug-23 17:00 3.42 Days
Continuous
665s D2401 (665s Dome), 665s D2402 (665s Dome), 665s T1 (665s Dome) Dome: TX1 Zone, P&C- DFR Upgrade  
ATCO, IMPERIALOIL 28-Aug-23 09:00 28-Aug-23 13:00 4 Hours
Continuous
837S 702, 837S 7L105 Protection Relay, 7L105, 837s 702 (837s Mahihkan), 7L105 (837s Mahihkan - 909s Mahno) RTXP switch replacements for 7L105  
ALTALINK 28-Aug-23 11:00 31-Aug-23 17:00 3.25 Days
Continuous
618s 725 (618s Riverbend), 725L (111s Coalbanks - 725AL tap), 725L (674s Bowron - 725AL tap), 725AL (618s Riverbend - 725L tap) change out CTs on 618s725 & single line phase CVT on 618s14  
ALTALINK 28-Aug-23 11:00 05-Sep-23 12:00 8.04 Days
Continuous
151s T1 (151s Strathmore) T1 Protection upgrade  
ALTALINK 28-Aug-23 12:00 31-Aug-23 18:00 3.25 Days
Continuous
58s T2 (58s Edson) 58sT2 25kV bushings replacement and leakage reactance test, leaks and LA base insulators  
ALTALINK 28-Aug-23 12:30 31-Aug-23 17:30 3.21 Days
Continuous
310p 952 (310p Sundance) Maintenance on 310p952 including 1st trips  
ATCO 28-Aug-23 14:00 31-Aug-23 13:00 2.96 Days
Continuous
7L171, 7L171 (802s Michichi Creek - 804s Wintering Hills) Cross arm and insulator replacement on 7L171, 49 structures.  
ALTALINK, EPCOR 29-Aug-23 07:00 29-Aug-23 17:00 10 Hours
Continuous
947L (89s Ellerslie - 987s Clover Bar), 987s C2402 (987s Clover Bar), 987s C2404 (987s Clover Bar) Cloverbar: 947L, P&C- 240kV Mimic Panel Decomm  
ALTALINK, EPCOR 30-Aug-23 07:00 30-Aug-23 17:00 10 Hours
Continuous
921L (71s Lamoureux - 987s Clover Bar), 987s C2404 (987s Clover Bar), 987s C2406 (987s Clover Bar) Cloverbar: 921L, P&C- 240kV Mimic Panel Decomm  
ALTALINK, EPCOR 30-Aug-23 07:00 30-Aug-23 17:00 10 Hours
Continuous
921L (71s Lamoureux - 987s Clover Bar) Cloverbar: 921L, P&C- 240kV Mimic Panel Decomm  
ALTALINK 30-Aug-23 09:00 30-Aug-23 11:00 2 Hours
Daily
151s 765W (151s Strathmore) Breaker out of service for decommissioning of T1 Trips.  
EPCOR, ALTALINK 31-Aug-23 07:00 31-Aug-23 17:00 10 Hours
Continuous
987s C2403 (987s Clover Bar), 987s C2405 (987s Clover Bar), 915L (38s East Edmonton - 987s Clover Bar) Cloverbar: 915L, P&C- 240kV Mimic Panel Decomm  
ALTALINK, EPCOR 31-Aug-23 07:00 31-Aug-23 17:00 10 Hours
Continuous
915L (38s East Edmonton - 987s Clover Bar) Cloverbar: 915L, P&C- 240kV Mimic Panel Decomm  
ATCO 31-Aug-23 13:00 31-Aug-23 17:30 4.5 Hours
Continuous
959s 906 (959s Lanfine) PRC-005 - TRIP COIL TESTING - BREAKER 906 @ 959S  
SUNCOR 01-Sep-23 08:00 01-Sep-23 17:00 9 Hours
Continuous
635PT-1001, 635EDD-1000 635PT-1001 (635EDD-1000) Planned Repair on Transformer 2ndary Side Breaker Mech Heaters  
ATCO 01-Sep-23 09:00 01-Sep-23 13:00 4 Hours
Continuous
959s 919 (959s Lanfine) PRC-005 - TRIP COIL TESTING - BREAKER 919 @ 959S  
ALTALINK 01-Sep-23 13:00 01-Sep-23 17:00 4 Hours
Daily
754L (437s Baymag - 742L tap), 754L (245s Seebe - 742L tap), 742L (985s Exshaw - 754L tap) Opening 754L65A to limit amount of line being energized to stay within allowable charging current limits.  
ATCO 01-Sep-23 13:00 01-Sep-23 17:30 4.5 Hours
Continuous
959s 920 (959s Lanfine) PRC-005 - TRIP COIL TESTING - BREAKER 920 @ 959S  
ALTALINK 02-Sep-23 09:00 02-Sep-23 13:00 4 Hours
Daily
151s 765W (151s Strathmore) wiring/testing T1 prot. trips.  
EPCOR 05-Sep-23 07:00 08-Sep-23 17:00 3.42 Days
Continuous
665s D2403 (665s Dome) Dome: D2403, P&C- DFR Upgrade  
EPCOR 05-Sep-23 07:00 28-Sep-23 17:00 23.42 Days
Continuous
240BA3 @ Argyll Transfer Station E629S and Bellamy E814S, 240BA3 (629s Argyll Transfer Station - 814s Bellamy) 240BA3: UGT Degassing Project  
SUNCOR 05-Sep-23 08:00 19-Sep-23 18:00 14.42 Days
Continuous
29EDD-1, 29EDD-1 29EDD1s752 (29EDD-1 Millennium) N260B1 + Relays, 29CVT-11, 29PS-72/76.
29EDD-1S1/1S7/1S13/1S452/1S152 + Relays,
952-101/104 + Controller + Relays
 
BCH 05-Sep-23 09:00 07-Sep-23 17:00 2.33 Days
Continuous
5L98 (BCH Nicola - BCH Vaseux Lake) replace end of life insulators BC Maintenance does not affect the Alberta ATC AB-BC
ATCO 05-Sep-23 09:30 05-Sep-23 13:00 3.5 Hours
Continuous
710s 703 (710s Vermilion), 7L65 (710s Vermilion - 7LA65 tap) PRC-005 - TRIP COIL TESTING - BREAKER 703 @ 710S  
ATCO 05-Sep-23 10:00 15-Sep-23 17:00 10.29 Days
Continuous
786s 703T (786s High Level), 786s SVC (786s High Level), 786s 703 (786s High Level) 703T has a minor leak and requires an oil top up.
In addition, we're planning to install a secondary oil containment on 703T.
 
ALTALINK 05-Sep-23 11:00 08-Sep-23 17:00 3.25 Days
Continuous
151s T1 (151s Strathmore) PT replacements, LAs, Post Insulators, switch salvage, Remove UG & Switch replacement. Create Open Point 'A' on 25kV Bus 1  
ATCO 05-Sep-23 12:00 10-Sep-23 17:30 5.23 Days
Continuous
7L45 (798s Bridge Creek - 813s Little Smoky) 7L45D2 switch replacement
7L45 between 845S Big Mountain and 798S Bridge Creek to remain in service
 
ALTALINK 05-Sep-23 12:30 05-Sep-23 16:30 4 Hours
Daily
254s 443X (254s Coaldale) 1st trip followed by GOI to fix 254s17  
ATCO 05-Sep-23 13:00 05-Sep-23 17:30 4.5 Hours
Continuous
710s 704 (710s Vermilion) PRC-005 - TRIP COIL TESTING - BREAKER 704 @ 710S  
ATCO 05-Sep-23 13:00 08-Sep-23 17:30 3.19 Days
Continuous
959s SVC (959s Lanfine) Converter inspection, fire system inspection  
ALTALINK 06-Sep-23 07:00 06-Sep-23 18:00 11 Hours
Daily
745L (602s Cold Creek - 745AL tap) Replace insulators on structure 574. Replace bayonet bolts & hardware tighten structures 628 & 630.  
EPCOR, ALTALINK 06-Sep-23 07:00 18-Oct-23 17:00 42.42 Days
Continuous
Cloverbar S/S 921L, Tx2 and Tx4 bays, 921L (71s Lamoureux - 987s Clover Bar), 987s C2404 (987s Clover Bar), 987s CDS35 (987s Cloverbar), 987s T4 (987s Clover Bar) Initial stage of 240 kV ring re-configuration for new 1191L construction. New disconnects CDS41 and CDS44 to be energized post outage.  
ALTALINK, EPCOR 06-Sep-23 07:00 18-Oct-23 17:00 42.42 Days
Continuous
71s 921X (71s Lamoureux), 921L (71s Lamoureux - 987s Clover Bar) initial stage of 240 kV ring re-configuration for new 1191L construction. New disconnects CDS41 and CDS44 to be energized post outage.  
ALTALINK 06-Sep-23 08:00 14-Sep-23 15:00 8.29 Days
Continuous
753L (65s High River - 253s Blackie), 851L (253s Blackie - 525s Carseland), 876L (179s Gleichen - 253s Blackie), 253s Blackie Replace multiple 138kV switches, 253s1, 253s2, 253s5, 253s6,253s9, 253s179 and 253s181. Replacement of wooden support beams to steel for switches. Replace 138kV strain insulators (10 sets throughout station)  
SUNCOR 06-Sep-23 08:00 10-Oct-23 18:00 34.42 Days
Continuous
29EDD-63 30-252-11301 (29EDD-63) Breaker Shutter Repair
(29PT-179, 30PT-219, 30-252-11301)
 
ALTALINK 06-Sep-23 09:30 07-Sep-23 17:30 1.33 Days
Continuous
37s 82 (37s North Calder) 1st trip PRC5 maintenance minor  
ALTALINK 07-Sep-23 12:30 07-Sep-23 16:00 3.5 Hours
Daily
254s 414W (254s Coaldale) Repairing hotspot on 254s11  
ENMAX 09-Sep-23 08:00 09-Sep-23 18:00 10 Hours
Continuous
7.84L (SS-7 - SS-36), 36B138-36.81 (SS-36), 36.1TR (SS-36), 36.3TR (SS-36) fall substation washing  
ALTALINK 09-Sep-23 09:00 14-Sep-23 17:00 5.33 Days
Continuous
151s T2 (151s Strathmore) 151s35 Breaker Replacement, 151s31, s34, s37 Switch replacements, 151s12, 151s40 Fuse disconnects, 151s31, s34s, s40 Post Insulators  
EPCOR 11-Sep-23 07:00 11-Sep-23 17:00 10 Hours
Continuous
VDS20 @ Victoria E511S, EP 511s VDS20 (EP 511s Victoria) Victoria: VDS20 Disconnect Repair  
EPCOR 11-Sep-23 07:00 13-Sep-23 17:00 2.42 Days
Continuous
PM2403 (Poundmaker), PM2404 (Poundmaker) Poundmaker: 930L Zone, P&C- DFR Upgrade  
EPCOR 11-Sep-23 07:00 14-Sep-23 17:00 3.42 Days
Continuous
665s D2402 (665s Dome), 665s D2403 (665s Dome), 665s T2 (665s Dome) Dome: TX2 Zone, P&C- DFR Upgrade  
ALTALINK 11-Sep-23 07:00 21-Sep-23 17:00 10.42 Days
Continuous
1325L WATL (510s-511s) - GOI, 1325L (510s Sunnybrook - AML 511s Crossings) Annual Link Outage, Station Misc work, Valve Hall Inspections, DC Bushing Doble, VCS Load bank testing.  
ENMAX, ALTALINK 11-Sep-23 08:00 11-Sep-23 18:00 10 Hours
Continuous
21.80L (42s Sarcee - SS-21), 20.82L (SS-20 - SS-21), 21.1TR (SS-21), 21.4TR (SS-21) Fall Substation Washing. Altalink required to remove AML VT4 60S100 fuses  
ENMAX, ALTALINK 11-Sep-23 08:00 11-Sep-23 18:00 10 Hours
Daily
21.80L (42s Sarcee - SS-21) Fall Substation Washing. Altalink required to remove AML VT4 60S100 fuses  
Lethbridge, ALTALINK 11-Sep-23 08:00 25-Sep-23 10:30 14.1 Days
Continuous
146s 667 (146s Macdonald), 667L (146s MacDonald - 370s North Lethbridge) Replace Protections on 146s667L  
ALTALINK, Lethbridge 11-Sep-23 08:00 25-Sep-23 10:30 14.1 Days
Continuous
667L (146s MacDonald - 370s North Lethbridge), 370s 667 (370s North Lethbridge) replace 146s667L Protections  
ATCO 11-Sep-23 09:00 11-Sep-23 17:30 8.5 Hours
Continuous
730s STATCOM (730s Rycroft), 730s 705 (730s Rycroft) Hitachi to complete outstanding warranty points  
ATCO 11-Sep-23 10:00 13-Sep-23 17:30 2.31 Days
Continuous
720s 901T (720s Wabasca), 720s 502R (720s Wabasca), 720s 504R (720s Wabasca) Repair 502RD & 901T deficiencies  
ALTALINK 12-Sep-23 07:30 13-Sep-23 08:00 24.5 Hours
Continuous
163s T2 (163s Amoco Empress) to replace bolted connections to crimp connections on the cables feeding T2.  
ENMAX, ALTALINK 12-Sep-23 08:00 12-Sep-23 18:00 10 Hours
Continuous
50L (44s Bearspaw Plant - SS-21), 21.2TR (SS-21), 21.1C (SS-21) Fall Substation Washing  
ENMAX, ALTALINK 12-Sep-23 08:00 12-Sep-23 18:00 10 Hours
Daily
50L (44s Bearspaw Plant - SS-21) Fall Substation Washing.  
ALTALINK 13-Sep-23 08:05 13-Sep-23 16:30 8.42 Hours
Continuous
163s T1 (163s Amoco Empress) to replace bolted connections to crimp connections on the cables feeding T1.  
ALTALINK 13-Sep-23 09:00 13-Sep-23 13:30 4.5 Hours
Daily
77s 40 (77s Sagitawah) 1st trip & PRC5 maintenance on 77s40  
EPCOR 14-Sep-23 07:00 16-Sep-23 17:00 2.42 Days
Continuous
PM2401 (Poundmaker), PM2402 (Poundmaker) Poundmaker: 1098L Zone, P&C- DFR Upgrade  
ENMAX 14-Sep-23 08:00 14-Sep-23 12:00 4 Hours
Continuous
23.80L (74s Janet - SS-23), 23.4TR (SS-23) Fall Substation Washing  
ALTALINK 14-Sep-23 08:00 14-Sep-23 12:00 4 Hours
Daily
74s 23.80W (74s Janet) Fall Substation Washing.  
ALTALINK 15-Sep-23 09:00 15-Sep-23 17:00 8 Hours
Daily
151s T1 (151s Strathmore) Close Open Point A  
EPCOR 18-Sep-23 07:00 18-Sep-23 17:00 10 Hours
Continuous
T2 (Poundmaker), PM2401 (Poundmaker), PM2405 (Poundmaker) Poundmaker: TX2 Zone, P&C- DFR Upgrade  
ATCO 18-Sep-23 09:00 22-Sep-23 16:00 4.29 Days
Continuous
7L62 (789s Keg River - 797s Kemp River) Line to Ground Mitigation  
BCH 18-Sep-23 09:00 29-Sep-23 17:00 11.33 Days
Continuous
5L91 (BCH Ashton Creek - BCH Selkirk) replace end of life spacers and insulators BC maintenance does not affect the Alberta ATC AB-BC
ATCO 18-Sep-23 09:30 22-Sep-23 17:30 4.33 Days
Continuous
2029S ACF11, 2029S ACF12, 2029S ACF13, 2029S ACF14, 2029s ACF11 (2029s Heathfield), 2029s ACF12 (2029s Heathfield), 2029s ACF13 (2029s Heathfield), 2029s ACF14 (2029s Heathfield) PRC-005 testing, filter bank inspections  
ATCO 18-Sep-23 10:00 18-Sep-23 17:00 7 Hours
Continuous
9L20, 9L912, 9L20 (755s Cordel - 766s Nevis), 9L912 (63s Red Deer - 766s Nevis), 766s 901T (766s Nevis) 766S Nevis Rebuild Project - Hot Line crew connect 9L20/9L912 bypass, cut in open Jumper J1 and J2  
ATCO 18-Sep-23 10:00 20-Sep-23 17:30 2.31 Days
Continuous
720s 901 (720s Wabasca) Bkr 901 Min Oil HPF testing, Load transferred to N.O. 902 Breaker  
ALTALINK 18-Sep-23 10:00 28-Sep-23 18:00 10.33 Days
Continuous
1034L (244s Bowmanton - 324s Cassils) Comp. replacement (Str. 186-380)  
ATCO 18-Sep-23 10:00 09-Oct-23 17:00 21.29 Days
Continuous
822S 703, 822s 703 (822s Wolf Lake) 822S Wolf lake P&C and SCADA Upgrade
Work on Breaker 822S 703
Cut over cabling and protection to new panel.
Commission new protection including teleprotection DTT.
7L86/7L574 bypass will be in service
 
ALTALINK 18-Sep-23 11:00 21-Sep-23 17:00 3.25 Days
Continuous
266s 1037L FSC1 (266s SC1), 266s 152 (266s SC1) annual maintenance on FSC1, change out a bad CT  
ENMAX, ALTALINK 18-Sep-23 12:00 18-Sep-23 18:00 6 Hours
Continuous
28.80L (42s Sarcee - SS-28), 28.2TR (SS-28) Fall Substation Washing  
ALTALINK 18-Sep-23 12:00 18-Sep-23 18:00 6 Hours
Daily
42s 28 (42s Sarcee) Fall Substation Washing.  
ALTALINK 18-Sep-23 12:00 21-Sep-23 17:00 3.21 Days
Continuous
28sT1(Tx18701) GOI, 28s T1 (28s West Brooks) replace leaking HOXO bushing  
ALTALINK 18-Sep-23 13:00 21-Sep-23 17:00 3.17 Days
Continuous
275s 8 (275s Jenner) 1st trip PRC5 maintenance  
ALTALINK 18-Sep-23 13:30 21-Sep-23 17:30 3.17 Days
Continuous
310p 2652 (310p Sundance) 1st trip & then full maintenance: replace grading caps, fix close dashpot leaks  
EPCOR 18-Sep-23 17:00 21-Sep-23 17:00 3 Days
Continuous
T2 (Poundmaker) Poundmaker: TX2, P&C- DFR Upgrade  
EPCOR 19-Sep-23 07:00 29-Sep-23 17:00 10.42 Days
Continuous
Genesee S/S 12TC2 Bay Outage, 330P 12TC2 (330p Genesee) Screw piles installation on west end of existing 500kv bus 2  
ALTALINK 19-Sep-23 08:30 21-Sep-23 13:00 2.19 Days
Continuous
760L (760AL tap - 7LA760 tap) Pole change for clearance mitigation 7L760 structures 494, 515, 516, 538  
ATCO, ALTALINK 19-Sep-23 09:00 21-Sep-23 14:00 2.21 Days
Continuous
7L760D3 (7LA760 tap), 760L (760AL tap - 7LA760 tap) Pole change for clearance mitigation 7L760 structures 515, 516, 538  
BCH 19-Sep-23 09:00 21-Sep-23 17:00 2.33 Days
Continuous
5L91 (BCH Ashton Creek - BCH Selkirk), 5D44 (BCH Ashton Creek) 5D44, 5D1CB4, 5D2CB3 disconnects inspection BC maintenance does not affect the Alberta ATC AB-BC
ATCO 19-Sep-23 10:00 19-Sep-23 17:00 7 Hours
Continuous
9L56 (720s Wabasca - 732s Mitsue) High Load Move to Cross Under 9L56-119 to 9L56-120, load is 8.65m, line height measured 8.9m July 13, 2023, 19c  
ATCO 19-Sep-23 10:00 24-Sep-23 17:00 5.29 Days
Continuous
9L93, 9L93 (615s Halkirk - 972s Tinchebray), 972s 901 (972s Tinchebray), 972s 903 (972s Tinchebray) Connect new 9LA93 T-tap. Cut in, reroute, restring, and splice OPGW from Str#60 to 615S Halkirk. Complete cutover and commission Protection/SCADA/Telecom at new 973S Lanes Lake, 972S, 615S Halkirk  
ATCO 19-Sep-23 10:00 04-Dec-23 17:00 76.33 Days
Continuous
766S 144KV Bus, 766S 240KV Bus, 766s 701 (766s Nevis), 766s 901T (766s Nevis) 766S Nevis Rebuild Project - Replace and commission 9L912D1, 9L20D2, 901, 902, 901CT, 902CT, 901A, 902A, 900PT1, connect new 903A and 704A  
ALTALINK 22-Sep-23 08:30 24-Sep-23 18:00 2.4 Days
Continuous
38s T4 (38s East Edmonton), 38s 240kV Bus 2 (38s East Edmonton) 38s T4 PRC5 testing, maintenance, & fix leaks. 38s57 hotspot repair.  
ATCO 22-Sep-23 10:00 22-Sep-23 17:00 7 Hours
Continuous
9L56 (720s Wabasca - 732s Mitsue) High Load Move to Cross Under 9L56-119 to 9L56-120, load is 8.65m, line height measured 8.9m July 13, 2023, 19c  
ALTALINK 23-Sep-23 08:30 24-Sep-23 16:30 1.33 Days
Continuous
237s T2 (237s Foothills) PRC5 Doble Maintenance and IDD  
ATCO 23-Sep-23 09:00 24-Sep-23 16:00 31 Hours
Continuous
7L62 (789s Keg River - 797s Kemp River) Line to Ground Mitigation  
EPCOR 25-Sep-23 07:00 25-Sep-23 17:00 10 Hours
Continuous
T3 (Poundmaker), PM2404 (Poundmaker), PM2405 (Poundmaker) Poundmaker: TX3 Zone, P&C- DFR Upgrade  
ALTALINK 25-Sep-23 08:30 29-Sep-23 16:30 4.33 Days
Continuous
510s ACF22 (510s Sunnybrook), 510s ACF21 (510s Sunnybrook), 510s 1952 (510s Sunnybrook), 510s 2052 (510s Sunnybrook) rebalance ACF21 A phase, replace a leaky capacitor in ACF 22 A and C phase.  
ATCO 25-Sep-23 09:00 02-Oct-23 16:00 7.29 Days
Continuous
7L03 (749s Flyingshot Lake - 7L09 tap) Replacing red tag poles  
BCH 25-Sep-23 09:00 27-Oct-23 16:00 32.29 Days
Continuous
T4 (BCH Natal), 2CB2 (BCH Natal) replace NTL 2CT2 BC maintenance does not affect the Alberta ATC AB-BC
ATCO 25-Sep-23 09:30 29-Sep-23 17:30 4.33 Days
Continuous
2029S ACF21, 2029S ACF22, 2029S ACF23, 2029s ACF21 (2029s Heathfield), 2029s ACF22 (2029s Heathfield), 2029s ACF23 (2029s Heathfield) PRC-005 testing, filter bank inspections  
ALTALINK 25-Sep-23 10:00 27-Sep-23 17:00 2.29 Days
Continuous
266s 1038L FSC2 (266s SC1), 266s 252 (266s SC1) annual maintenance on FSC2  
ATCO 25-Sep-23 11:00 06-Nov-23 13:00 42.13 Days
Continuous
885S 902T, 885S 704, 885S 500PT2, 885S 500SST2X, 885S 501, 885S 700PT2, 885s 902T (885s McMillan) 885S McMillan sub Protection Upgrade  
ATCO 25-Sep-23 13:00 28-Sep-23 13:00 3 Days
Continuous
7L760 (767s Oyen - 7LA760 tap) Pole change from test and treat 7L760 structures 406, 408, 409, 450, 455, 460, 461, 468, 471, 479, 494.
Pole change for clearance mitigation 7L760 structures 480, 492, 493
 
ALTALINK 25-Sep-23 13:00 06-Oct-23 12:00 10.96 Days
Daily
676L (244s Bowmanton - 523s Bullshead), 244s 2152 (244s Bowmanton), 244s 2252 (244s Bowmanton), 523s 676 (523s Bullshead) Install and commission new circuits and protections pertaining to the Dunmore Project  
EPCOR 25-Sep-23 17:00 28-Sep-23 17:00 3 Days
Continuous
T3 (Poundmaker) Poundmaker: TX3, P&C- DFR Upgrade  
ALTALINK 26-Sep-23 08:00 27-Sep-23 14:00 30 Hours
Continuous
170s T2 (170s Pike) Replace X0H0 bushings and replace Qualitrol on 170s T2  
ALTALINK, ATCO 26-Sep-23 08:30 26-Sep-23 12:30 4 Hours
Daily
526s 152 (526s Buffalo Creek), 7L129 (526s Buffalo Creek - 7LA129 tap) 1st trip and PRC5 maintenance  
ALTALINK, ATCO 26-Sep-23 12:30 26-Sep-23 17:30 5 Hours
Daily
526s 252 (526s Buffalo Creek), 7L50 (526s Buffalo Creek - 491L tap), AltaLink Distribution Breaker 1st trip and PRC5 maintenance  
ALTALINK 27-Sep-23 08:00 27-Sep-23 13:00 5 Hours
Daily
275s T1 (275s Jenner), 275s 240kV Bus 1 (275s Jenner) Outage on T1 and 240kV Bus 1 for integration of Buffalo Atlee Cluster 4 - 275s35 status wiring and testing to 1136 AIS.  
ATCO 27-Sep-23 10:00 27-Sep-23 17:00 7 Hours
Continuous
7L587 (822s Wolf Lake - 826s Marguerite Lake), 822s 701T (822s Wolf Lake), 826s 710 (826s Marguerite Lake), 826s 707 (826s Marguerite Lake), 822s 701 (822s Wolf Lake), 826s 7L587D1 (826s Marguerite Lake), 822s 7L587D2 (822s Wolf Lake) 822S Wolf lake P&C and SCADA Upgrade
Install normal relay settings
Disconnect 144kV bypass from 7L587
 
ALTALINK 28-Sep-23 08:00 28-Sep-23 13:00 5 Hours
Daily
275s T2 (275s Jenner), 275s 240kV Bus 2 (275s Jenner), 949L (275s Jenner - 306s Halsbury) outage on T2 and 240kV Bus 2 for integration of Buffalo Atlee Cluster 4 - 275s36 status wiring and testing to 1136 AIS.  
ENMAX, ALTALINK 30-Sep-23 12:00 30-Sep-23 18:00 6 Hours
Continuous
37.82L (74s Janet - SS-37), 37.2TR (SS-37) Summer Substation Washing  
ALTALINK 30-Sep-23 12:00 30-Sep-23 18:00 6 Hours
Daily
74s 37.82W (74s Janet) Summer Substation Washing  
ALTALINK, BHE Canada 02-Oct-23 06:00 07-Oct-23 19:00 5.54 Days
Continuous
120s 27 (120s Picture Butte) maintanence, Top up 1052 breaker pole 1 – low gas (leak source found), PS1 OLTC maintenance, battery maintenance  
ALTALINK 02-Oct-23 07:00 02-Oct-23 17:00 10 Hours
Continuous
180AL (604s Granum - 180L tap), 180L (15s Fort Macleod - 180AL tap), 180L (928s East Stavely - 180AL tap) customer work  
BHE Canada 02-Oct-23 08:00 07-Oct-23 18:00 5.42 Days
Continuous
MATL (120s Picture Butte - Montana) align with 1201L outage AB-MATL
ALTALINK 02-Oct-23 09:00 07-Oct-23 16:00 5.29 Days
Continuous
520s T1 (520s Bennett), 1114L (102s Langdon - 520s Bennett) T1 Bushing monitor replacement on all 3 phases + spare and DGA monitor (replacing PD monitor on T1-2 phase only). 520s1352 breaker maintenance, 102s2689 maintenance, 520s1201 maintenance AB-BC
ALTALINK 02-Oct-23 09:00 07-Oct-23 18:00 5.38 Days
Continuous
1201L (520s Bennett - BCH Cranbrook) maintenance tasks str range 31-485 (Oct 2 - 7) AB-BC
ATCO 02-Oct-23 09:30 05-Oct-23 16:00 3.27 Days
Continuous
969S 301, 969S 701T, 969S 501, 969s 701T (969s Lindbergh) 701T Maintenance, and leak repairs
301 Close latch repairs
 
ALTALINK 02-Oct-23 13:30 05-Oct-23 17:30 3.17 Days
Continuous
19s 49 (19s Wabamun), 19s T10 (19s Wabamun) 1st trip & PRC5 maintenance & major overhaul maintenance  
ALTALINK 02-Oct-23 14:30 05-Oct-23 17:30 3.13 Days
Continuous
648s T3 (648s Metiskow) T3: change out 240kV, 138kV bushings, change out HOXO, major tap changer maintenance, PRC5 doble, replace PRD  
BCH 03-Oct-23 09:00 06-Oct-23 16:00 3.29 Days
Continuous
5L94 (BCH Cranbrook - 102s Langdon) 5D45 interrupter replacement
AB-BC
ALTALINK 03-Oct-23 09:30 04-Oct-23 17:30 1.33 Days
Continuous
83s 172W (83s Taber), 172L (83s Taber - 172EL tap) 1st trip & PRC5 maintenance  
ALTALINK 04-Oct-23 07:00 11-Oct-23 18:00 7.46 Days
Continuous
953L (574s Nilrem - 755s Cordel) Replace dampers on 953L structures 284-347  
ATCO, ALTALINK 08-Oct-23 10:00 19-Oct-23 18:00 11.33 Days
Continuous
1035L (244s Bowmanton - 2075s Newell) Comp. replacement (Str. 100 - 242)  
ATCO 08-Oct-23 10:00 25-Oct-23 18:00 17.33 Days
Continuous
9L1035 (244s Bowmanton - 2075s Newell) Isolation for AltaLink work - Condition Guarantee  
EPCOR, ALTALINK 10-Oct-23 07:00 14-Oct-23 17:00 4.42 Days
Continuous
1059L @ Lambton and East Industrial E52S and East Edmonton 38S, 1059L (38s East Edmonton - 1059AL tap), EP 803s L2401 (EP 803s Lambton), EP 803s L2404 (EP 803s Lambton) Lambton: 1059L CVT LCR  
EPCOR 10-Oct-23 07:00 21-Oct-23 17:00 11.42 Days
Continuous
240CV5 @ Castledowns E557S and Victoria E511S, CV5 (EP 511s Victoria - 557s Castle Downs) CV5: UGT CV5 Annual Manhole Inspections  
ATCO 10-Oct-23 08:00 14-Oct-23 17:00 4.38 Days
Continuous
972s 901 (972s Tinchebray) Replace vandalized cables and verify functionality.  
ALTALINK 10-Oct-23 08:00 19-Oct-23 17:00 9.38 Days
Continuous
765L (151s Strathmore - 419s Chestermere) Perform maintenance work on structures 56, 62, 63, 64, 65, 79-89, 136, 143, 151, 153, 157, 160-162, 173, 174, 183, 195-197, 202, 205, 213, 220, 222-226, 230, 237, 238, 255-265, 289-301, 304 & 305.  
BCH 10-Oct-23 09:00 11-Oct-23 16:00 31 Hours
Continuous
5L51 (BPA Custer - BCH Ingledow) ING 5CT23 INSP AB-BC
BCH 10-Oct-23 09:00 13-Oct-23 16:00 3.29 Days
Continuous
5L96 (BCH Selkirk - BCH Vaseux Lake) replace end of life insulators AB-BC
ALTALINK 10-Oct-23 11:00 13-Oct-23 18:00 3.29 Days
Continuous
89s T2 (89s Ellerslie) Bushing monitor replacement on all 3 phases and replace DGA monitor. Replacing PD monitor on T2-2 phase only.  
ATCO 10-Oct-23 12:00 13-Oct-23 16:00 3.17 Days
Continuous
876S 9L15 Protection Relay, 9L15, 876S 906, 876S 904, 876S 240kV Breaker Relays, 9L15 (834s Wesley Creek - 876s Brintnell), 876s 904 (876s Brintnell), 876s 906 (876s Brintnell) 21B/ 9L15 RTXP Test Switch Replacement, PRC-005 Relay Testing 21A&B / 9L15 an 50BF/ Bkr 904&906, PRC-005 Trip Coil Testing Breaker 904 & 906  
ALTALINK 11-Oct-23 07:00 11-Oct-23 18:00 11 Hours
Daily
880L (321s Al Rothbauer - 523s Bullshead), 321s 880 (321s Al Rothbauer), 523s 880 (523s Bullshead) install and commission new circuits and protections pertaining to the Dunmore Project  
BCH 11-Oct-23 09:30 11-Oct-23 16:30 7 Hours
Continuous
5L51 (BPA Custer - BCH Ingledow) maintenance at CUSTER (BPA): complete services on MOD's 4273 & 4275 AB-BC
ALTALINK 11-Oct-23 10:00 11-Oct-23 14:00 4 Hours
Daily
250p 11 (250p Bighorn Plant) maintenance  
ALTALINK 12-Oct-23 03:00 12-Oct-23 07:00 4 Hours
Daily
62s 12 (62s Brazeau Plant) maintenance  
BCH 12-Oct-23 09:00 13-Oct-23 16:00 31 Hours
Daily
5L52 (BPA Custer - BCH Ingledow) maintenance AB-BC
ALTALINK 12-Oct-23 10:00 12-Oct-23 14:00 4 Hours
Daily
250p 22 (250p Bighorn Plant) maintenance  
ATCO 12-Oct-23 10:00 13-Oct-23 16:00 30 Hours
Continuous
794S 704, 7L54, 7L54 (794s Valleyview - 813s Little Smoky) breaker maintenance  
ATCO 13-Oct-23 08:00 23-Oct-23 17:00 10.38 Days
Continuous
7L101 (790s Poplar Hill - 944s Lowe Lake) customer maintenance  
ATCO, SUNCOR 15-Oct-23 09:30 17-Nov-23 16:00 33.31 Days
Continuous
848s 901 (848s Ruth Lake), 29PL9-2 (29EDD-1 Millennium - 848s Ruth Lake), 848s 902 (848s Ruth Lake) Suncor Capacity Increase project.
Suncor is reconductoring 29PL9-2, ATCO is completing a line protection upgrade in coordination with the outage
 
ATCO 16-Oct-23 08:00 20-Oct-23 17:00 4.38 Days
Continuous
972s Protection & Control (972s Tinchebray), 972s 903 (972s Tinchebray), 972s 240kV Bus 900BS2 (972s Tinchebray) Replace cables damaged during vandalism which will require rewiring to Breaker 903, 903CT, 903A, and 9L16, 9L93, 50BF/903 protection relays.
Breaker 903 and 903A will need to be operated.
Protection relays will be blocked one at a time to rewire and verify new wiring: status and CT inputs.
 
ATCO, ALTALINK 16-Oct-23 09:00 19-Oct-23 16:30 3.31 Days
Continuous
7L50 (526s Buffalo Creek - 491L tap), 7L50 (757s Battle River - 491L tap) 7L50 Pole and arm replacement  
BCH 16-Oct-23 09:00 27-Oct-23 16:00 11.29 Days
Continuous
2L112 (BPA Boundary - BCH Nelway) T2 Inspection, doble and Tap chancer inspection AB-BC
ATCO 16-Oct-23 10:00 23-Oct-23 17:00 7.29 Days
Continuous
9L16, 9L16 (755s Cordel - 972s Tinchebray) Upgrade 21A/B-9L16 protection relay wiring/programming and commission LTO/DTT  
ALTALINK 16-Oct-23 11:00 19-Oct-23 18:00 3.29 Days
Continuous
89s T1 (89s Ellerslie) Bushing monitor replacement on all 3 phases and replace DGA monitor. Replacing PD monitor on T1-2 phase only.  
ATCO 16-Oct-23 12:00 19-Oct-23 16:00 3.17 Days
Continuous
876S 9L56 Protection Relay, 9L56, 876S 904, 876S 902, 876S 240kV Breaker Relays, 9L56 (720s Wabasca - 876s Brintnell), 876s 902 (876s Brintnell), 876s 904 (876s Brintnell) 21A&B/ 9L56, 50BF/902 RTXP Test Switch Replacement, PRC-005 Relay Testing 21A&B / 9L56 an 50BF/ Bkr 902, PRC-005 Trip Coil Testing Breaker 902  
ALTALINK 16-Oct-23 13:00 17-Oct-23 16:00 27 Hours
Daily
368s 612 (368s Burdett) demo A87/138B trip to 368s612. B87/138B to remain intact to maintain protections  
ALTALINK 17-Oct-23 07:00 27-Oct-23 18:00 10.46 Days
Continuous
820L (254s Coaldale - 820AL tap), 820AL (315s Chin Chute - 820L tap), 820L (820AL tap - 820BL tap), 820BL (967s Redcoat - 820L tap), 820L (67s Stirling - 820BL tap) LCM between Structures #108 - 227  
ALTALINK 17-Oct-23 08:00 17-Oct-23 11:00 3 Hours
Daily
368s T1 (368s Burdett) demo A87/138B trip to 368sT1 (Tx18739). B87/138B to remain intact to maintain protections  
ALTALINK 18-Oct-23 07:00 25-Oct-23 18:00 7.46 Days
Continuous
1047L (574s Nilrem - 650s Hansman Lake) replace dampers on 1047L structures 1-64  
ALTALINK 19-Oct-23 08:00 19-Oct-23 12:00 4 Hours
Daily
368s T2 (368s Burdett) demo A87/138B trip to 368sT2 (Tx18500). B87/138B to remain intact to maintain protections  
ATCO 19-Oct-23 08:00 22-Oct-23 08:00 3 Days
Continuous
7L65 (709s Vegreville - 7LA65 tap) Stringing 7L65 OPGW, salvage 7L65 OHSW Str 137 to Str 131B
Proceed to permit 2-75368. Expand 7L65 GOI to entire line length
 
ALTALINK 19-Oct-23 13:00 19-Oct-23 16:00 3 Hours
Daily
368s 879 (368s Burdett) demo A87/138B trip to 368s879. B87/138B to remain intact to maintain protections  
EPCOR 20-Oct-23 07:00 17-Nov-23 17:00 28.46 Days
Continuous
Cloverbar S/S 240 kV ring open from CDS31 to CDS39, 987s CDS34 (987s Cloverbar) Continued re-configuration of 240 kV ring for new 1191L bay construction will leave the ring open from newly energized CDS41 and CDS44 disconnects.  
ALTALINK 20-Oct-23 07:30 20-Oct-23 12:30 5 Hours
Daily
244s 152 (244s Bowmanton) Install and commission new circuits and protections pertaining to the Dunmore Project  
ALTALINK 21-Oct-23 07:00 30-Oct-23 18:00 9.46 Days
Continuous
964L (244s Bowmanton - 964L tap), 964L (251s Whitla - 964L tap), 244s 252 (244s Bowmanton), 244s 352 (244s Bowmanton), 251s 252 (251s Whitla), 251s 352 (251s Whitla), 964AL (1024s Granlea - 964L tap) tying in the new 326s Murray Lake Substation  
ATCO, ALTALINK 21-Oct-23 10:00 25-Oct-23 18:00 4.33 Days
Continuous
1035L (244s Bowmanton - 2075s Newell) Comp. replacement (Str. 100 - 242)  
ATCO 22-Oct-23 08:01 22-Oct-23 17:00 8.98 Hours
Continuous
7L65 (709s Vegreville - 7LA65 tap), 7L65 (710s Vermilion - 7LA65 tap) Stringing 7L65 OPGW, salvage 7L65 OHSW Str 137 to Str 131B  
ENMAX 23-Oct-23 08:00 23-Oct-23 18:00 10 Hours
Continuous
162.1TR (SS-162) Re-establish tapchanger oil head space  
ATCO, ALTALINK 23-Oct-23 08:00 06-Nov-23 13:00 14.25 Days
Continuous
9L55 (AML 852s Round Hill - 885s McMillan), 885s 902T (885s McMillan), 885s 260kV Bus 900BS2 (885s McMillan) 885S McMillan sub Protection Upgrade  
ATCO 23-Oct-23 09:00 26-Oct-23 16:00 3.29 Days
Continuous
7L03 (749s Flyingshot Lake - 7L09 tap) Changing Rotten Poles  
ATCO, ALTALINK 23-Oct-23 09:00 27-Oct-23 16:30 4.31 Days
Continuous
7L50 (526s Buffalo Creek - 491L tap) 7L50 Pole and arm replacement  
ALTALINK, ENMAX 23-Oct-23 09:15 26-Oct-23 16:45 3.31 Days
Continuous
937L (5s - 102s) Advice, 937L (5s East Calgary - 102s Langdon) SCADA Upgrade  
ALTALINK 23-Oct-23 12:00 23-Oct-23 17:00 5 Hours
Daily
244s 452 (244s Bowmanton) Install and commission new circuits and protections pertaining to the Dunmore Project  
ATCO 23-Oct-23 12:00 26-Oct-23 16:00 3.17 Days
Continuous
876S 240kV Breaker Relays, 876S 9L10 Protection Relay, 9L10, 876S 901, 876S 903, 9L10 (876s Brintnell - 939s Livock), 876s 901 (876s Brintnell), 876s 903 (876s Brintnell) 21A&B/ 9L10, 50BF/901&903 RTXP Test Switch Replacement, PRC-005 Relay Testing 21A&B / 9L10 an 50BF/ Bkr 901&903, PRC-005 Trip Coil Testing Breaker 901 & 903  
ALTALINK 23-Oct-23 12:00 26-Oct-23 18:00 3.25 Days
Continuous
320p T1 (320p Keephills) Transformer maintenance. fix leaks, fan, & burned wires. Test transformer. 767L to be switched in to facilitate this outage.  
ALTALINK 23-Oct-23 13:00 08-Nov-23 16:00 16.17 Days
Continuous
722L (107s Westfield - 368s Burdett), 107s Westfield, 368s 722X (368s Burdett) Protection and CT work on 368s722X  
ENMAX 24-Oct-23 08:00 24-Oct-23 18:00 10 Hours
Continuous
162.2TR (SS-162) Re-establish tapchanger oil head space  
ALTALINK 24-Oct-23 12:30 24-Oct-23 17:30 5 Hours
Daily
244s 352 (244s Bowmanton) install and commission new circuits and protections pertaining to the Dunmore Project  
Lethbridge 25-Oct-23 07:00 25-Oct-23 17:00 10 Hours
Continuous
593s 824L (593s Lakeview) 593s824l Open end outage to test trip 593sT2 protections  
ALTALINK 25-Oct-23 07:30 25-Oct-23 12:30 5 Hours
Daily
244s 652 (244s Bowmanton) install and commission new circuits and protections pertaining to the Dunmore Project  
ATCO 25-Oct-23 08:00 27-Oct-23 17:00 2.38 Days
Continuous
9L59 (972s Tinchebray - 9LA59 tap), 972s 901 (972s Tinchebray) Replace cables damaged during vandalism BKR 901, and 9L93, 9L59, 50BF/901 protection relays rewired.
Protection relays will be blocked one at a time to rewire and verify new wiring: status and CT inputs.
 
ATCO, ALTALINK 30-Oct-23 09:00 02-Nov-23 16:30 3.31 Days
Continuous
7L50 (526s Buffalo Creek - 491L tap), 7L50 (757s Battle River - 491L tap) 7L50 Pole and arm replacement  
ALTALINK 30-Oct-23 09:30 02-Nov-23 16:45 3.3 Days
Continuous
916L (5s - 42s) Advice, 916L (5s East Calgary - 42s Sarcee) SCADA Upgrade  
ATCO 30-Oct-23 11:00 11-Dec-23 14:00 42.17 Days
Continuous
863S 902T, 863S 500MT1, 863S 500PT3, 863S 505, 863S 506, 863s 902T (863s Paintearth) 863S Paintearth Protection Upgrade
Demo wiring from 505, 506 breakers, and 500PT3, run new wiring, terminate to 505, 506, and 500PT3, demo old 5L470 & 5L469 line protection panel, install new 5L470 & 5L469 line protection panel, wire and commission breakers, 500PT3, and line protection.
Demo old wiring, and old Transformer protection panel, install and terminate new wiring, and new Transformer protection panel. Commission new wiring/Transformer protection, and new Transformer protection panel.

Once GOI is released 902TD will need to be commissioned.
 
ALTALINK 31-Oct-23 07:00 31-Oct-23 18:00 11 Hours
Daily
244s T1 (244s Bowmanton) install and commission new circuits and protections pertaining to the Dunmore Project  
ALTALINK 31-Oct-23 10:00 04-Nov-23 18:00 4.33 Days
Continuous
1034L (244s Bowmanton - 324s Cassils) Comp. replacement (Str. 186-380)  
ALTALINK 01-Nov-23 07:00 01-Nov-23 18:00 11 Hours
Daily
244s T2 (244s Bowmanton) install and commission new circuits and protections pertaining to the Dunmore Project  
ATCO 01-Nov-23 09:00 08-Nov-23 17:00 7.38 Days
Continuous
7L129 (710s Vermilion - 7LA129 tap) 7L65 Phase 2 Rebuild. Cutover 7L129 to new DC Structures. Install new Str 618, 621, 622, salvage existing structures
Take with 7L65 HOP 2-75374
 
ALTALINK, Lethbridge 05-Nov-23 13:00 08-Nov-23 17:00 3.17 Days
Continuous
618s 824 (618s Riverbend), 824L (593s Lakeview - 618s Riverbend) change out CTs on 618s824 and 1st trip.  
ATCO, ALTALINK 06-Nov-23 09:00 09-Nov-23 16:30 3.31 Days
Continuous
7L50 (526s Buffalo Creek - 491L tap), 7L50 (757s Battle River - 491L tap) 7L50 Pole and arm replacement  
ALTALINK, ENMAX 06-Nov-23 09:15 08-Nov-23 16:45 2.31 Days
Continuous
936L (5s - 102s) Advice, 936L (5s East Calgary - 102s Langdon) SCADA Upgrade  
ATCO 06-Nov-23 15:00 20-Nov-23 13:00 13.92 Days
Continuous
9L89, 885S 900 BUS 1, 885S 900PT1, 885S 900PT3, 885S 901, 885S 902, 9L89 (885s McMillan - 2011s Dawes), 885s 260kV Bus 900BS1 (885s McMillan) 885S McMillan sub Protection Upgrade: Complete protection cut over and Commissioning of new protection on 901,902,900PT1,9L89PT,9L89 Line Protection,900PT3.  
EPCOR 13-Nov-23 07:00 24-Nov-23 17:00 11.42 Days
Continuous
Cloverbar S/S Tx4 bay and 1191L bay, 987s CDS35 (987s Cloverbar) Continued re-configuration 240 kV ring for new 1191L bay  
ALTALINK 13-Nov-23 09:30 17-Nov-23 12:30 4.13 Days
Continuous
5s T1(TX18903) Advice, 5s T1 (5s East Calgary) SCADA Upgrade  
ALTALINK 13-Nov-23 13:00 29-Nov-23 13:00 16 Days
Continuous
612L (336s Fincastle - 368s Burdett) SOW is to upgrade 368s612L A line protection, 368s612L B line protection and 368s612 breaker fail protection. A GOI is required to demo and recon the CT circuits / trips to breaker 368s612 and to perform functionals on the new protection& Integrate the  
ALTALINK 20-Nov-23 09:30 24-Nov-23 12:30 4.13 Days
Continuous
5s T2(TX18835) Advice, 5s T2 (5s East Calgary) SCADA Upgrade  
ALTALINK 20-Nov-23 13:00 20-Nov-23 16:00 3 Hours
Daily
368s T1 (368s Burdett) integrate A87/138B trip & 368s612/368s722X CT contributions to 368sT1 (Tx18739). B87/138B to remain intact to maintain protections  
ALTALINK 21-Nov-23 08:00 26-Nov-23 17:00 5.38 Days
Continuous
356s 240kV Bus1 (356s Milo) T Line install over Bus 1 to new dead end bridge. Complete V drops to close in Construction Isolation point to new 240kV bay.  
ALTALINK 22-Nov-23 10:00 22-Nov-23 14:00 4 Hours
Daily
250p 11 (250p Bighorn Plant) maintenance  
ALTALINK 23-Nov-23 08:00 23-Nov-23 12:00 4 Hours
Daily
368s T2 (368s Burdett) iIntegrate A87/138B trip & 368s612/368s722X CT contributions to 368sT2 (Tx18500). B87/138B to remain intact to maintain protections  
ALTALINK 23-Nov-23 10:00 23-Nov-23 14:00 4 Hours
Daily
250p 22 (250p Bighorn Plant) maintenance  
ALTALINK 23-Nov-23 12:30 23-Nov-23 16:00 3.5 Hours
Daily
368s 879 (368s Burdett), 879L (368s Burdett - 879L tap) integrate the A87/138B CT contribution. B87/138B to remain intact to maintain protections  
ALTALINK 24-Nov-23 08:00 24-Nov-23 10:00 2 Hours
Daily
368s 722X (368s Burdett), 722L (107s Westfield - 368s Burdett) SOW is to integrate the new 368s612 breaker fail trip into 368s722X.  
EPCOR 27-Nov-23 07:00 08-Dec-23 17:00 11.42 Days
Continuous
Cloverbar S/S Tx2 bay and 1191L bay, 987s CDS32 (987s Cloverbar) Continued re-configuration 240 kV ring for new 1191L bay. 1191L to be energize post outage with new isolation point of CDS45 to remain until 1191L is ready to energize.  
Lethbridge, ALTALINK 27-Nov-23 08:00 08-Dec-23 17:00 11.38 Days
Continuous
593s 824L (593s Lakeview), 824L (593s Lakeview - 618s Riverbend) Replacing 593s824L HV BReaker  
ATCO 27-Nov-23 09:00 04-Dec-23 16:00 7.29 Days
Continuous
7L228 (845s Big Mountain - 2091S), 7L228 (845s Big Mountain - 7L20 tap) Pole Repairs from Test & Treat  
ALTALINK 28-Nov-23 08:00 30-Nov-23 16:30 2.35 Days
Continuous
275s T2 (275s Jenner) replace (2) 1ohm NGR’s with 3ohm NGR’s  
ALTALINK 28-Nov-23 08:30 28-Nov-23 13:00 4.5 Hours
Continuous
658L (562s Cypress - 658AL tap), 658L (649s Chappice Lake - 658AL tap), 658AL (662s Hilda - 658AL tap) Open North jumpers at structure 286A.  
ALTALINK 28-Nov-23 13:00 08-Dec-23 09:00 9.83 Days
Continuous
658L (562s Cypress - 658AL tap) 658L comp replacement (298-331)  
ALTALINK 29-Nov-23 23:00 30-Nov-23 03:00 4 Hours
Daily
62s 11 (62s Brazeau Plant) maintenance  
ALTALINK 30-Nov-23 03:00 30-Nov-23 07:00 4 Hours
Daily
62s 12 (62s Brazeau Plant) maintenance  
ALTALINK 02-Dec-23 07:00 19-Dec-23 17:00 17.42 Days
Continuous
929L (74S Janet - 287s Hazelwood) Component replacements between Structures #929L72 - 929L404  
ATCO 04-Dec-23 10:00 04-Dec-23 17:00 7 Hours
Continuous
9L20 (755s Cordel - 766s Nevis), 9L912 (63s Red Deer - 766s Nevis), 766s 901T (766s Nevis) 766S Nevis Rebuild Project - Hot Line crew disconnect 9L20/9L912 bypass, close open Jumper J1 and J2, Energize 240kV bus including new 903T and 144kV bus  
ALTALINK 08-Dec-23 09:00 08-Dec-23 13:00 4 Hours
Daily
658L (562s Cypress - 658AL tap), 658L (649s Chappice Lake - 658AL tap) Close North jumpers at structure 286A.  
ALTALINK 11-Dec-23 11:00 11-Dec-23 15:00 4 Hours
Daily
658L (562s Cypress - 658AL tap), 658L (649s Chappice Lake - 658AL tap) open South jumpers at structure 286A.  
ALTALINK 11-Dec-23 12:00 14-Dec-23 17:00 3.21 Days
Continuous
901AL (64s East Crossfield - 901L tap), 901L (63s Red Deer - 901AL tap), 901L (74s Janet - 901AL tap) FRM Str 3-370  
ALTALINK 11-Dec-23 15:00 15-Dec-23 09:00 3.75 Days
Continuous
658L (649s Chappice Lake - 658AL tap) 658L comp replacement (103-284)  
ALTALINK 15-Dec-23 09:00 15-Dec-23 13:00 4 Hours
Daily
658AL (662s Hilda - 658AL tap), 658L (562s Cypress - 658AL tap), 658L (649s Chappice Lake - 658AL tap) Close South jumpers at structure 286A.  
ATCO 15-Jan-24 14:30 26-Feb-24 14:00 41.98 Days
Continuous
863S 504, 863S 901T, 863S Station Service, 863S 500PT2X, 863S 500PT2Y, 863s 901T (863s Paintearth) 863S Paintearth Protection Upgrade  
ATCO 12-Feb-24 11:00 20-May-24 14:00 98.08 Days
Continuous
813S 901, 813s 901 (813s Little Smoky) Take 901 OOS to open bus up and add a new 902PT, and 902 breaker bay for the new 9L201 line to MPC Gas. (February 12, 2024 - May 6, 2024)
Will need to extend 901 GOI to take 903PT, 904, and 9L05 OOS to cut over 904 trips to new protection. (May 6, 2024 - May 20, 2024)
 
ATCO 26-Feb-24 14:30 11-Mar-24 14:00 13.94 Days
Continuous
863S 902, 9L948, 9L948 (650s Hansman Lake - 863s Paintearth) 863S Paintearth Protection Upgrade
Demo old wiring, and old Line protection panel, install and terminate new wiring, and new Line protection panel. Commission new wiring/Line protection, and new Line protection panel.

Once GOI is released 902A will need to be commissioned.
 
ATCO 04-Mar-24 09:00 15-Mar-24 17:00 11.29 Days
Continuous
7L760 (767s Oyen - 7LA760 tap) Install foundations and new switches 7L760D4 and 7L760D5. Install tap 7LC760
to 1004S Bullseye.
 
ATCO 11-Mar-24 14:30 25-Mar-24 14:00 13.98 Days
Continuous
863S 901, 9L27, 9L27 (755s Cordel - 863s Paintearth) 863S Paintearth Protection Upgrade
Demo old wiring, and old Line protection panel, install and terminate new wiring, and new Line protection panel. Commission new wiring/Line protection, and new Line protection panel.

Once GOI is released 901A will need to be commissioned.
 
EPCOR 15-Apr-24 07:00 22-Apr-24 07:00 7 Days
Continuous
816s P2402 (816s Petrolia), 816s P2401 (816s Petrolia), 816s T1 (816s Petrolia) Petrolia: P2401 Breaker LCR  
ENMAX, ALTALINK 18-Apr-24 08:00 18-Apr-24 13:00 5 Hours
Continuous
985L (74s Janet - SS-25) Summer Substation Washing. D133, D132, MD-985  
ENMAX, ALTALINK 18-Apr-24 13:00 18-Apr-24 18:00 5 Hours
Continuous
1003L (74s Janet - SS-25) Summer Substation Washing. D136, D135, MD-1003  
ENMAX, ALTALINK 18-Apr-24 13:00 18-Apr-24 18:00 5 Hours
Daily
1003L (74s Janet - SS-25) Summer Substation Washing. D136, D135, MD-1003.  
EPCOR 22-Apr-24 07:00 10-May-24 17:00 18.42 Days
Continuous
816s P2401 (816s Petrolia) Petrolia: P2402 Breaker LCR  
ATCO 26-Apr-24 10:00 29-Apr-24 17:00 3.29 Days
Continuous
9L80, 9L80 (755s Cordel - 757s Battle River) Complete termination and commissioning of 9L80 LTO and 912T TO - A/B send to 755S Cordel  
ATCO 06-May-24 09:00 31-May-24 17:30 25.35 Days
Continuous
2029S BUILDING VALVE HALL, 2029s 1205 (2029s Heathfield), 2029s 1206 (2029s Heathfield) Annual EATL outage at 2075s & 2029s.

2029s & 2075s AC & DC O&M.

USE 2-70212 FOR 13L50 GOI
USE 2-70213 FOR 2029s GOI
USE 2-70214 FOR 2075s GOI
 
ATCO 06-May-24 09:00 31-May-24 17:30 25.35 Days
Continuous
2075S BUILDING VALVE HALL, 2075s 916 (2075s Newell), 2075s 917 (2075s Newell) Annual EATL outage at 2075s & 2029s.

2029s & 2075s AC & DC O&M.

USE 2-70212 FOR 13L50 GOI
USE 2-70213 FOR 2029s GOI
USE 2-70214 FOR 2075s GOI
 
ATCO 06-May-24 09:00 31-May-24 17:30 25.35 Days
Continuous
13L50 (DC LINK), 13L50 (2029s Heathfield - 2075s Newell) Annual EATL outage at 2075s & 2029s.

2029s & 2075s AC & DC O&M.

USE 2-70212 FOR 13L50 GOI
USE 2-70213 FOR 2029s GOI
USE 2-70214 FOR 2075s GOI
 
EPCOR 21-May-24 07:00 14-Jun-24 17:00 24.42 Days
Continuous
816s P2402 (816s Petrolia) Petrolia: P2402 Breaker LCR  
SUNCOR 29-May-24 08:00 14-Jun-24 18:00 16.42 Days
Continuous
29PT-232 29PT-240, 29EDD-71 29PT-232 (29EDD-71), 29PL7-4 (29EDD-65 - 29EDD-71), 29EDD-71 29PS-243 (29EDD-71 Edd71Sub), 29EDD-71 29PS-242 (29EDD-71 Edd71Sub), 29EDD-71 752-4623 (29EDD-71) FB - 29EDD-71,29PS-0242 REPLACE / REPAIR, 29PL7-4 ;29PS-243 REPLACE SWITCH, 29EDD71;29PT-232 SYSTEM;PM 5Y (46756865)
29EDD-71;144KV NODE,29PT-240 (46699353), 29EDD71;29-752-4623 MAINT & TEST;PM 10y

 
ATCO 03-Jun-24 08:00 14-Jun-24 17:30 11.4 Days
Continuous
12L41 (510s Sunnybrook - 939s Livock), 12L44 (939s Livock - 951s Thickwood Hills) APL O&M outage

Use 2-70262 for 12L44 GOI
Use 2-70263 for 939s-APL GOI
Use 2-70264 for 951s-APL GOI
APL O&M outage

Use 2-70262 for 12L44 GOI
Use 2-70263 for 939s-APL GOI
Use 2-70264 for 951s-APL GOI
 
ATCO 03-Jun-24 10:00 28-Jun-24 10:00 25 Days
Continuous
9L16, 9L16 (755s Cordel - 972s Tinchebray) Upgrade 9L16 21A and 21B relays at both 755S Cordel and 972S Tinchebray.
Connect new 9LA16 to new 620S Goldeye substation
 
ATCO 04-Jun-24 08:00 05-Jul-24 17:00 31.38 Days
Continuous
788S 701T, 788s 701T (788s Hotchkiss) Remove 701TCS, add NEW 707 breaker and switch 707A. Add NEW 701T  
ALTALINK, BHE 10-Jun-24 08:00 11-Jun-24 17:00 1.38 Days
Continuous
879L (244s Bowmanton - 879AL tap), 879AL (719s Rattlesnake Ridge - 879L tap), 879L (368s Burdett - 879L tap) OPGW will be cut and spliced into to bring the fiber down for the new 1011s Dunmore Substation  
ALTALINK 10-Jun-24 08:00 11-Jun-24 17:00 1.38 Days
Continuous
676L (244s Bowmanton - 523s Bullshead) OPGW will be cut and spliced into to bring the fiber down for the new 1011s Dunmore Substation  
EPCOR 24-Jun-24 07:00 19-Jul-24 17:00 25.42 Days
Continuous
816s P2403 (816s Petrolia) Petrolia: P2403 Breaker LCR  
ATCO 03-Jul-24 09:00 08-Sep-24 11:00 67.08 Days
Continuous
848S 601, 848S 602, 848S 607, 848S 608, 848S 900BS1, 848S 901T, 848s 240kV Bus 900BS1 (848s Ruth Lake), 848s 901T (848s Ruth Lake) 848S Ruth Lake Substation Rebuild: Upgrading protection to IEC 61850, Demo 601PT,601B,601,601A,6L14D1,608A,608,608B,6LML1D1,600PT1, Replace breaker 401. Cut over to new protection: 602,607,607PT,601TD,901T,400PT1,400D1,901TD,903A,908A,913A. Install oil containment for 901T. Pull all new outdoor cable, modify cable tray, install new cable tray.  
ATCO 08-Jul-24 08:00 21-Jul-24 17:00 13.38 Days
Continuous
788S 703, 788s 703 (788s Hotchkiss) 703 breaker replacement  
ENMAXEC 15-Jul-24 08:00 19-Jul-24 18:00 4.42 Days
Continuous
383s T1 (383s Kettles Hill Windfarm), 383s T2 (383s Kettles Hill Windfarm) substation maintenance  
EPCOR 29-Jul-24 07:00 23-Aug-24 17:00 25.42 Days
Continuous
816s P2404 (816s Petrolia) Petrolia: P2404 Breaker LCR  
ATCO 16-Aug-24 10:00 16-Aug-24 17:00 7 Hours
Continuous
801S 902, 801s 902 (801s Anderson) Final connection of Bkr 902/52a single pole status inputs to DFR, Commission  
ATCO 17-Aug-24 10:00 17-Aug-24 17:00 7 Hours
Continuous
801S 903, 801s 903 (801s Anderson) Final connection of Bkr 903 52a single pole status inputs to DFR, Commission  
ATCO 18-Aug-24 10:00 18-Aug-24 17:00 7 Hours
Continuous
801S 904, 801s 904 (801s Anderson) Final connection of Bkr 904 52a single pole status inputs to DFR, Commission  
ATCO 27-Aug-24 10:00 27-Aug-24 17:00 7 Hours
Continuous
801S 905, 801s 905 (801s Anderson) Final connection of Bkr 905 52a single pole status inputs to DFR, Commission  
ATCO 28-Aug-24 10:00 28-Aug-24 17:00 7 Hours
Continuous
801S 906, 801s 906 (801s Anderson) Final connection of Bkr 906 52a single pole status inputs to DFR, Commission  
ATCO 29-Aug-24 10:00 29-Aug-24 17:00 7 Hours
Continuous
801S 907, 801s 907 (801s Anderson) Final connection of Bkr 907 52a single pole status inputs to DFR, Commission  
ATCO 30-Aug-24 10:00 30-Aug-24 17:00 7 Hours
Continuous
801S 908, 801s 908 (801s Anderson) Final connection of Bkr 908 52a single pole status inputs to DFR, Commission  
ATCO 31-Aug-24 10:00 31-Aug-24 17:00 7 Hours
Continuous
801S 909, 801s 909 (801s Anderson) Final connection of Bkr 909 52a single pole status inputs to DFR, Commission  
ATCO 01-Sep-24 10:00 01-Sep-24 17:00 7 Hours
Continuous
801S 910, 801s 910 (801s Anderson) Final connection of Bkr 910 52a single pole status inputs to DFR, Commission  
EPCOR 03-Sep-24 07:00 10-Sep-24 07:00 7 Days
Continuous
816s T1 (816s Petrolia), 816s P2404 (816s Petrolia), 816s P2405 (816s Petrolia) Petrolia: P2405 Breaker LCR  
EPCOR 10-Sep-24 07:00 27-Sep-24 17:00 17.42 Days
Continuous
816s P2405 (816s Petrolia) Petrolia: P2405 Breaker LCR  
ATCO 10-Sep-24 09:00 02-Dec-24 11:00 83.13 Days
Continuous
848S 603, 848S 604, 848S 605T, 848S 606, 848S 848-501, 848S 848-504, 848S 848S 500BS2 25kv Protection System, 848S 900BS2, 848S 902T, 848s 240kV Bus 900BS2 (848s Ruth Lake), 848s 902T (848s Ruth Lake) 848S Ruth Lake Substation Rebuild: Upgrading protection to IEC 61850, Replace breakers 603 & 604. Cut over to new protection: 500D4,501,500D15,504,500PT2,500D10,504VR,605T,605TD,603PT,603,603CT,604,604CT,606,606CT,600PT2,605TD,902T,400PT2,402,902TD,900PT2. Install oil containment for 902T. Pull all new outdoor cable, modify cable tray, install new cable tray.  
ATCO 10-Sep-24 10:00 10-Sep-24 17:00 7 Hours
Continuous
801S 911, 801s 911 (801s Anderson) Final connection of Bkr 911 52a single pole status inputs to DFR, Commission  
ATCO 11-Sep-24 10:00 11-Sep-24 17:00 7 Hours
Continuous
801S 912, 801s 912 (801s Anderson) Final connection of Bkr 912 52a single pole status inputs to DFR, Commission  
ALTALINK, EPCOR 07-Oct-24 09:30 18-Oct-24 17:00 11.31 Days
Continuous
1044L (EP 805s Jasper - 816s Petrolia), 908L (89s Ellerslie - 816s Petrolia), 816s P2401 (816s Petrolia), 816s P2405 (816s Petrolia), 816s P2406 (816s Petrolia) Petrolia: P2406 Breaker LCR  
ATCO 07-Oct-24 10:00 21-Oct-24 17:00 14.29 Days
Continuous
9L99, 9L99 (801s Anderson - 807s Sheerness) Replace Breaker 901 @ 807S Sheerness, complete line 21A, 21B/9L99 protection upgrade and Commissioning  
EPCOR 18-Oct-24 17:00 01-Nov-24 17:00 14 Days
Continuous
816s P2406 (816s Petrolia) Petrolia: P2406 Breaker LCR  
ATCO 11-Nov-24 10:00 25-Nov-24 17:00 14.29 Days
Continuous
9L100, 9L100 (801s Anderson - 807s Sheerness) Replace Breaker 902 @ 807S Sheerness, complete line 21A, 21B/9L100 protection upgrade and Commissioning  
ATCO 05-May-25 09:00 30-May-25 17:30 25.35 Days
Continuous
2029S BUILDING VALVE HALL, 2029s 1205 (2029s Heathfield), 2029s 1206 (2029s Heathfield) Annual EATL outage at 2075s & 2029s.

2029s & 2075s AC & DC O&M.

USE 2-70215 FOR 13L50 GOI
USE 2-70216 FOR 2029s GOI
USE 2-70217 FOR 2075s GOI
 
ATCO 05-May-25 09:00 30-May-25 17:30 25.35 Days
Continuous
2075S BUILDING VALVE HALL, 2075s 916 (2075s Newell), 2075s 917 (2075s Newell) Annual EATL outage at 2075s & 2029s.

2029s & 2075s AC & DC O&M.

USE 2-70215 FOR 13L50 GOI
USE 2-70216 FOR 2029s GOI
USE 2-70217 FOR 2075s GOI
 
ATCO 05-May-25 09:00 30-May-25 17:30 25.35 Days
Continuous
13L50 (DC LINK), 13L50 (2029s Heathfield - 2075s Newell) Annual EATL outage at 2075s & 2029s.

2029s & 2075s AC & DC O&M.

USE 2-70215 FOR 13L50 GOI
USE 2-70216 FOR 2029s GOI
USE 2-70217 FOR 2075s GOI
 
ATCO, Syncrude 20-May-25 09:00 12-Jun-25 10:00 23.04 Days
Continuous
848S 910, 848S 911, 848S RL1 SYNCRUDE ISLANDING RAS (IRAS), RL1 (848s Ruth Lake - D05) 848S Ruth Lake Sub rebuild/upgrade protection to IEC 61850 - Cut over to new protection: 910CT,910,910B,910PT,RL-1D1,911B,911,911CT.  
ATCO 12-Jun-25 11:00 04-Jul-25 09:00 21.92 Days
Continuous
848S 911, 848S 913, 9L01 (848s Ruth Lake - 951s Thickwood Hills), 848s 911 (848s Ruth Lake), 848s 913 (848s Ruth Lake) 848S Ruth Lake Sub rebuild/upgrade protection to IEC 61850 - Cut over to new protection: 911,911CT,912B,9L01D1,913PT,913B,913,913CT  
ATCO 04-Jul-25 11:00 24-Jul-25 09:00 19.92 Days
Continuous
848S 905, 848S 906, 9L23 (848s Ruth Lake - 977s Salt Creek), 848s 905 (848s Ruth Lake), 848s 906 (848s Ruth Lake) 848S Ruth Lake Sub rebuild/upgrade protection to IEC 61850 - Cut over to new protection: 905CT,905,905B,905PT,9L23D1,906B,906,906CT,906A.  
ATCO, SUNCOR 24-Jul-25 11:00 14-Aug-25 09:00 20.92 Days
Continuous
848S 906, 848S 903, 848S 29PL9-1 SUNCOR ISLANDING RAS (IRAS), 29PL9-1 (29EDD-1 Millennium - 848s Ruth Lake), 848s 903 (848s Ruth Lake), 848s 906 (848s Ruth Lake) 848S Ruth Lake Sub rebuild/upgrade protection to IEC 61850 - Cut over to new protection: 906,906CT,904B,29PL9-1D1,903PT,903B,903,903CT.  
ATCO, SUNCOR 14-Aug-25 11:00 04-Sep-25 09:00 20.92 Days
Continuous
848S 901, 848S 902, 848S 29PL9-2 SUNCOR ISLANDING RAS (IRAS), 29PL9-2 (29EDD-1 Millennium - 848s Ruth Lake), 848s 901 (848s Ruth Lake), 848s 902 (848s Ruth Lake) 848S Ruth Lake Sub rebuild/upgrade protection to IEC 61850 - Cut over to new protection: 901CT,901,901B,901PT,29PL9-2D1,902B,902,902CT.  
ATCO, Syncrude 04-Sep-25 11:00 25-Sep-25 09:00 20.92 Days
Continuous
848S 902, 848S 907, 848s 902 (848s Ruth Lake), 848s 907 (848s Ruth Lake), RL2 (848s Ruth Lake - D05) 848S Ruth Lake Sub rebuild/upgrade protection to IEC 61850 - Cut over to new protection: 902,902CT,902A,902PT,RL-2D1,907A,907CT,907.  
ATCO 25-Sep-25 11:00 17-Oct-25 14:00 22.13 Days
Continuous
848S 907, 848S 908, 9L58 (848s Ruth Lake - 888s Dover), 848s 907 (848s Ruth Lake), 848s 908 (848s Ruth Lake) 848S Ruth Lake Sub rebuild/upgrade protection to IEC 61850 - Cut over to new protection: 907CT,907,907B,9L58D2,908PT,908B,908,908CT.  

AB-BC, AB-SK & AB-MATL: refer to AESO web posting: http://itc.aeso.ca/itc/public/atc
Also,
AB-BC, AB-SK & AB-MATL: refer to ISO Rule 203.6: http://www.aeso.ca/rulesprocedures/18592.html

Prepared On: 2023-07-19   15:19:51


This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein.