Alberta Electric System Operator | |
System Co-ordination Plan | |
2023-02-23 to 2023-03-03 | |
Approved Outages |
Previous Version | |
Download CSV |
From | To | Owner | Type | Element | Scheduled Activity | Date/Time Comments | Interconnection |
---|---|---|---|---|---|---|---|
05-Oct-18 08:00 | 31-Dec-23 16:00 | EPCOR | IO | C2 (Rossdale) | forced outage | Continuous |
1,913.38 Days
|
24-Oct-18 01:13 | 31-Dec-23 16:00 | EPCOR | IO | C1 (Rossdale) | forced outage | 1,894.66 Days
Continuous |
|
05-Jan-21 08:00 | 01-Jun-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29PT-69
|
877.38 Days
Continuous |
|
01-Jan-22 08:00 | 06-Mar-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 30EDD-200 | 429.42 Days
Daily |
|
01-Jan-22 08:00 | 07-Mar-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 30EDD-200 | 430.42 Days
Daily |
|
14-Mar-22 14:00 | 02-Jun-23 18:00 | ATCO | TE | 813s SVC (813s Little Smoky) | emergency real time failed relay | 445.17 Days
Continuous |
|
18-Apr-22 08:00 | 29-May-23 17:00 | ATCO | TE | 813s Little Smoky 144kV Bus 1, 813s Little Smoky 144kV Bus 2, 813s Little Smoky 240kV Bus 1, 813s Little Smoky 240kV Bus 2 | 813S Little Smoky rebuild: cutover wiring to the new relays as their corresponding apparatus are out of service | 406.38 Days
Continuous |
|
18-Apr-22 08:00 | 29-May-23 17:00 | ATCO | TE | 813s Little Smoky | 813S Little Smoky rebuild: cutover wiring to the new relays as their corresponding apparatus are out of service | 406.38 Days
Continuous |
|
19-Apr-22 08:00 | 29-May-23 17:00 | ATCO | TE | 813s Little Smoky | protection relay work | 405.38 Days
Continuous |
|
15-May-22 15:10 | 28-Feb-23 17:00 | SUNCOR, ACCIONA | Outage | 139s C1 (139s Hillridge), 139s 52-C (139s Hillridge) | repairs on the charging motor operating mechanism | 289.12 Days
Continuous |
|
04-Sep-22 16:50 | 01-Mar-23 18:00 | ATCO | Outage | 848s 401R (848s Ruth Lake) | forced outage | 178.09 Days
Continuous |
|
12-Dec-22 03:10 | 05-May-23 18:00 | ALTALINK | Outage | 421s C1 (421s Hays) | forced outage due to breaker 421s 30 failure | 144.58 Days
Continuous |
|
21-Dec-22 07:00 | 01-Mar-23 16:00 | EPCOR | TE | 987s GDS1 (987s Cloverbar) | customer request | 70.38 Days
Continuous |
|
03-Jan-23 07:00 | 31-Mar-23 17:00 | EPCOR | TE | 330p Genesee, 330p RTU/SCADA (330p Genesee) | relay maintenance and updates | 87.38 Days
Continuous |
|
03-Jan-23 07:00 | 31-Mar-23 17:00 | EPCOR | TE | 814s Bellamy | relay maintenance and updates | 87.38 Days
Continuous |
|
03-Jan-23 12:00 | 19-May-23 16:00 | ENMAX | Outage | 14.2C (SS-14) | forced outage | 136.13 Days
Continuous |
|
09-Jan-23 07:00 | 07-Apr-23 17:00 | EPCOR | TE | Woodcroft | P&C- 72 kV protection relay maintenance | 88.38 Days
Continuous |
|
09-Jan-23 07:00 | 07-Apr-23 17:00 | EPCOR | TE | Namao | P&C- 72 kV protection relay maintenance | 88.38 Days
Continuous |
|
09-Jan-23 07:00 | 07-Apr-23 17:00 | EPCOR | TE | 987s Clover Bar | P&C- 72 kV protection relay maintenance | 88.38 Days
Continuous |
|
12-Jan-23 08:00 | 06-Mar-23 08:30 | ATCO | IO | 730S SVS | SVS isolation from 730s. COG for construction | 53.02 Days
Continuous |
|
23-Jan-23 07:00 | 27-Feb-23 17:00 | ATCO | RB | 9L66 (847s Muskeg River - 849s Joslyn Creek) | bay swap to free up the existing 9L66 bay and connect to free bay at Muskeg River sub for the new line builds for CNRL Horizon | 35.42 Days
Daily |
|
23-Jan-23 08:00 | 31-Mar-23 18:00 | CNRL, ATCO | TE | 847s Muskeg River, ATCO TPR Outage | transferring teleprotection circuits from 9L66 relay to open bay PLT-260 relays | 67.38 Days
Continuous |
|
24-Jan-23 08:00 | 24-Feb-23 17:00 | ATCO | Outage | 740s 701 (740s H.R. Milner) | perform work on 701B | 31.38 Days
Continuous |
|
27-Jan-23 08:00 | 24-Feb-23 18:00 | ATCO | RB | 9LJH1 (919s Hartley - 920s Jackpine), 9LJH2 (919s Hartley - 920s Jackpine) | line work on new 9L66 - close poximity | 28.42 Days
Continuous |
|
27-Jan-23 15:20 | 03-Mar-23 16:00 | BCH, ALTALINK | RB | 5L94 (BCH Cranbrook - 102s Langdon), 1201L (520s Bennett - BCH Cranbrook) | emergency - BCH disabling recloser | 35.03 Days
Continuous |
|
02-Feb-23 06:28 | 24-Feb-23 18:00 | ATCO | Outage | 959s SVC (959s Lanfine), 959s 921 (959s Lanfine) | forced outage | 22.48 Days
Continuous |
|
06-Feb-23 10:00 | 06-Mar-23 10:00 | ATCO | Outage | 813s 713 (813s Little Smoky), 813s 717 (813s Little Smoky), 813s 714C (813s Little Smoky), 813s 715C (813s Little Smoky), 813s 716C (813s Little Smoky) | wiring panels and relay programming | 28 Days
Continuous |
|
06-Feb-23 11:00 | 03-Mar-23 16:00 | ATCO | TE | 848s Ruth Lake | relay testing 46 Relays, 86 Aux relays PRC005 | 25.21 Days
Continuous |
|
07-Feb-23 13:00 | 07-Mar-23 09:13 | ATCO | TE | 813s Little Smoky | 901T - block 87TB/901T relay for 701CT injection | 27.84 Days
Continuous |
|
09-Feb-23 07:00 | 24-Feb-23 17:00 | EPCOR | Outage | T2 (Strathcona), S723 (Strathcona), SAB2 (Strathcona), S722 (Strathcona) | protection upgrade cutovers | 15.42 Days
Continuous |
|
09-Feb-23 12:01 | 06-Mar-23 07:59 | ATCO | Outage | 7L121 (2043s Freer - 7LA121 tap) | jumper 2 open until 7L121D3 is installed | 24.83 Days
Continuous |
|
11-Feb-23 07:00 | 10-Mar-23 18:00 | ALTALINK | TE | 895s RTU/SCADA (895s Suffield) | supervisory visibility outages required to download new configurations | 27.46 Days
Daily |
|
12-Feb-23 13:00 | 28-Feb-23 13:00 | ENMAX | IO | 1080L (SS-25 - SS-65) | AltaLink expansion of GOI zone for urgent work to replace 1080L cables into C25s for scaffolding for cable terminations | 16 Days
Continuous |
|
12-Feb-23 13:00 | 02-Mar-23 13:00 | ALTALINK, ENMAX | Outage | 1080L (SS-25 - SS-65), 240kV West Bus (SS-25), 25B240-D139 (SS-25), 25B240-D142 (SS-25), 25B240-D133 (SS-25), 25B240-D136 (SS-25), 25B240-D138 (SS-25), 25MD240-1080 (SS-25) | expansion of GOI zone for urgent work to replace 1080L cables into C25s for scaffolding for cable terminations | 18 Days
Continuous |
|
13-Feb-23 07:00 | 31-Mar-23 17:00 | EPCOR | Outage | T2 (Garneau), G725 (Garneau), G726 (Garneau), GAB2 (Garneau), GT2-O (GARNEAU) | transformer replacement | 46.38 Days
Continuous |
|
13-Feb-23 08:00 | 24-Feb-23 15:00 | ALTALINK | TE | 1325L (510s Sunnybrook - AML 511s Crossings) | fiber repair @ 1325L structures 519, 752 | 11.29 Days
Daily |
|
13-Feb-23 08:00 | 24-Feb-23 15:00 | ALTALINK | RB | 1325L (510s Sunnybrook - AML 511s Crossings) | fiber repair @ 1325L structures 519, 752 | 11.29 Days
Daily |
|
13-Feb-23 09:30 | 24-Feb-23 17:25 | ATCO | TE | 865s RTU/SCADA (865s Saddlehills) | battery program updates - add new breakers with aux contacts to DC system | 11.33 Days
Continuous |
|
13-Feb-23 10:00 | 23-Feb-23 10:00 | ATCO | Outage | 7L80 (733s Simonette - 857s Kakwa Ridge), 7L80 (740s H.R. Milner - 857s Kakwa Ridge) | line mitigation, cross arm replacement | 10 Days
Continuous |
|
13-Feb-23 13:00 | 24-Feb-23 13:20 | ATCO | TE | 813s 902T (813s Little Smoky) | test GOOSE messages from new protection 50BF/713 relay | 11.01 Days
Continuous |
|
13-Feb-23 13:00 | 07-Mar-23 09:13 | ATCO | TE | 813s 901T (813s Little Smoky) | block 87TB/901T relay for 701CT injection | 21.84 Days
Continuous |
|
14-Feb-23 09:30 | 31-Mar-23 17:30 | ATCO | TE | 772s RTU/SCADA (772s Youngstown) | RTU updates | 45.29 Days
Continuous |
|
14-Feb-23 10:00 | 24-Feb-23 16:00 | ATCO | TE | 780s Lubicon | 707C protection relay circuit work and testing | 10.25 Days
Continuous |
|
14-Feb-23 11:00 | 24-Feb-23 16:00 | ATCO | Outage | 780s 707C (780s Lubicon) | PRC-005 - trip coil testing- breaker 707 | 10.21 Days
Continuous |
|
20-Feb-23 07:00 | 24-Feb-23 17:00 | ALTALINK | TE | 662s RTU/SCADA (662s Hilda) | RTU configuration updates | 4.42 Days
Daily |
|
20-Feb-23 07:00 | 24-Feb-23 17:00 | ALTALINK | TE | 562s RTU/SCADA (562s Cypress) | RTU configuration updates | 4.42 Days
Daily |
|
20-Feb-23 07:00 | 24-Feb-23 18:00 | ALTALINK | TE | 674L (244s Bowmanton - 649s Chappice Lake) | relay setting changes | 4.46 Days
Daily |
|
20-Feb-23 07:00 | 24-Feb-23 17:00 | ALTALINK | TE | 562s Cypress | 138 kV bus 2 - troubleshoot remote access issue and possible setting change to rectify issue | 4.42 Days
Daily |
|
20-Feb-23 07:00 | 24-Feb-23 18:00 | ALTALINK | TE | 658L (562s Cypress - 658AL tap), 658L (649s Chappice Lake - 658AL tap), 658AL (662s Hilda - 658AL tap) | relay setting change | 4.46 Days
Daily |
|
20-Feb-23 07:00 | 24-Feb-23 17:00 | ALTALINK | TE | 244s Bowmanton | 138 kV bus 2, 3 and 4 - troubleshoot remote access issue and possible setting change | 4.42 Days
Daily |
|
20-Feb-23 08:00 | 24-Feb-23 16:00 | ALTALINK | Outage | 648L (63s Red Deer - 580s Sylvan Lake), 63s 648 (63s Red Deer), 580s 648 (580s Sylvan Lake) | re-locate and resplice understrung OPGW between 648L96 and 648L97 to top of structures, and salvage old 80L crossing above | 4.33 Days
Continuous |
|
21-Feb-23 07:15 | 23-Feb-23 17:45 | ALTALINK | Outage | 752L (64s East Crossfield - 752AL tap), 752L (653s Summit - 752AL tap), 752AL (316s West Crossfield - 752L tap) | FRM component replacement (str 11-12) | 2.44 Days
Continuous |
|
21-Feb-23 07:15 | 24-Feb-23 17:45 | ALTALINK | Outage | 50L (44s Bearspaw Plant - SS-21) | insulator and structure repair | 3.44 Days
Continuous |
|
21-Feb-23 07:15 | 24-Feb-23 17:00 | ENMAX | IO | 50L(44s- C21s) | Altalink 50L FRM (STR 115-125) - insulator and structure repair | 3.41 Days
Continuous |
|
21-Feb-23 08:00 | 24-Feb-23 17:00 | ALTALINK | RB | 860L (44s Bearspaw Plant - 291s Cochrane) | proximity to 50L FRM (str 115-125) work | 3.38 Days
Daily |
|
21-Feb-23 08:00 | 24-Feb-23 16:00 | ENMAX | Outage | 24.2TR (SS-24) | relay, protection testing 24RLY138-24.2TR A GE, SEL-351S, 24BB25-24.2TR | 3.33 Days
Continuous |
|
21-Feb-23 09:30 | 24-Feb-23 17:30 | ATCO | TE | 2029s RTU/SCADA (2029s Heathfield), ATCO PMU | 2029s PMU channel calibration and test new computer and archive storage device that will be replaced for interfacing with the PMU and running open PDC program | 3.33 Days
Continuous |
|
21-Feb-23 10:00 | 31-Mar-23 17:00 | ATCO, CNRL | TE | 847s RTU/SCADA (847s Muskeg River) | download RTU program changes for 9L66 line relocation in 847S Muskeg Rive | 38.25 Days
Continuous |
|
21-Feb-23 10:00 | 28-Feb-23 17:00 | CNRL, ATCO | TE | 847s Muskeg River, 849s Joslyn Creek, ATCO TPR Outage | transferring teleprotection circuits from 9L66 relay to open bay PLT-260 relays
|
7.29 Days
Continuous |
|
21-Feb-23 11:00 | 24-Feb-23 16:00 | ATCO | TE | 930s RTU/SCADA (930s Arcenciel) | RTU alarm configuration updates | 3.21 Days
Continuous |
|
21-Feb-23 12:00 | 16-Mar-23 18:00 | ALTALINK | Outage | 174L (197s Bardo - 395s North Holden), 395s 174W (395s North Holden) | rebuild 174L from existing structure 174L692 to 174L742 | 23.21 Days
Continuous |
|
22-Feb-23 08:00 | 01-Mar-23 17:30 | ATCO | TE | 730s RTU/SCADA (730s Rycroft) | update a few alarm descriptions | 7.4 Days
Continuous |
|
22-Feb-23 08:00 | 23-Feb-23 12:00 | ALTALINK | TE | 447s RTU/SCADA (447s Enchant) | to ensure the new 3.3 EMS connects to sites in the field | 28 Hours
Daily |
|
22-Feb-23 08:00 | 25-Feb-23 16:00 | ENMAX | TE | SS-25 | 240 kV bus differential zone 45 A and B - relay, lockout testing. 25-Z45A-86, 25-Z45B-86
|
3.33 Days
Daily |
|
22-Feb-23 08:30 | 23-Feb-23 16:30 | ALTALINK | Outage | 100L (498s Tilley - 895s Suffield), 895s 100 (895s Suffield), 498s 100X (498s Tilley) | migrate and commission at 895s Suffield | 1.33 Days
Continuous |
|
22-Feb-23 09:30 | 24-Feb-23 17:30 | ATCO | TE | 2075s Newell | PRC-005 - aux trip relay testing | 2.33 Days
Continuous |
|
22-Feb-23 10:00 | 27-Feb-23 12:00 | ATCO | Outage | 7L12 (834s Wesley Creek - 7LA12 tap) | changing arms and pole repairs | 5.08 Days
Continuous |
|
22-Feb-23 15:00 | 24-Feb-23 18:00 | ATCO | Outage | 7L50 (757s Battle River - 491L tap), 757s 709 (757s Battle River) | emergency real time outage to repair shield wire broken on several structures | 2.13 Days
Continuous |
|
22-Feb-23 23:00 | 23-Feb-23 03:00 | ALTALINK | Outage | 62s 12 (62s Brazeau Plant) | maintenance | 4 Hours
Daily |
|
23-Feb-23 03:00 | 23-Feb-23 07:00 | ALTALINK | Outage | 62s 11 (62s Brazeau Plant) | maintenance | 4 Hours
Daily |
|
23-Feb-23 07:00 | 27-Feb-23 17:00 | CNRL | IO | 847s 9L66D2 (847s Muskeg River) | transfer load back to existing 9L66 bay from PTL-260 Bay @ 847s | 4.42 Days
Continuous |
|
23-Feb-23 07:00 | 24-Feb-23 17:00 | EPCOR | TE | 816s Petrolia | T2 - B protection blocking for protection upgrade cut over | 1.42 Days
Continuous |
|
23-Feb-23 08:00 | 23-Feb-23 17:00 | ALTALINK | TE | 63s Red Deer | perform relay maintenance on 901L B21/L2 & 901L A21/L2 | 9 Hours
Daily |
|
23-Feb-23 08:00 | 23-Feb-23 17:00 | ALTALINK | TE | 64s East Crossfield | perform relay maintenance on 901L A21/L1 & 901L B21/L1 | 9 Hours
Daily |
|
23-Feb-23 08:00 | 23-Feb-23 17:00 | ALTALINK | TE | 422s Westwood | relay setting change on T1 B87/50/51/51NN/T1 | 9 Hours
Daily |
|
23-Feb-23 08:00 | 23-Feb-23 17:00 | ALTALINK | TE | 223s Strome | PRC maintenance, 701LX B21/L1 LFZP111, 701LN B21/L2 LFZP111 | 9 Hours
Daily |
|
23-Feb-23 08:00 | 23-Feb-23 17:00 | ALTALINK | TE | 310p RTU/SCADA (310p Sundance) | RTU configuration changes | 9 Hours
Daily |
|
23-Feb-23 08:00 | 24-Feb-23 17:00 | ALTALINK | TE | 618s Riverbend | perform relay maintenance | 1.38 Days
Daily |
|
23-Feb-23 08:00 | 23-Feb-23 17:00 | ALTALINK | TE | AltaLink Radio Tower, AltaLink TPR Outage, AltaLink RTU/SCADA (AltaLink) | 9071R - software upgrade | 9 Hours
Daily |
|
23-Feb-23 08:00 | 24-Feb-23 16:00 | ENMAX | TE | RTU/SCADA (SS-54) | RTU maintenance, alarm test - RTU-54 ANN, peripheral board testing and wiring | 1.33 Days
Daily |
|
23-Feb-23 08:00 | 23-Feb-23 17:00 | ALTALINK | TE | 388s RTU/SCADA (388s Riverside) | card replacement | 9 Hours
Daily |
|
23-Feb-23 08:00 | 23-Feb-23 17:00 | ALTALINK | Outage | 234L (310p Sundance - 505L tap), 234L (133L tap - 505L tap), 505L (234L tap - 505L tap), 310P 234N (310p Sundance) | urgent repair 310p234N DC ground | 9 Hours
Daily |
|
23-Feb-23 08:00 | 24-Feb-23 20:00 | Syncrude | Outage | 14 (Aurora) | replace CT 14 | 1.5 Days
Continuous |
|
23-Feb-23 08:30 | 23-Feb-23 17:00 | ATCO | TE | 820s RTU/SCADA (820s Hangingstone), 2014s RTU/SCADA (2014s Halfway), 820s Hangingstone | migrate half of protection channels along with SCADA channels | 8.5 Hours
Continuous |
|
23-Feb-23 10:00 | 24-Feb-23 10:00 | ATCO, ALTALINK | Outage | 1241L (510s Sunnybrook - 939s Livock) | urgent change out a lightning arrestor that has a 100 degree hotspot | 24 Hours
Continuous |
|
24-Feb-23 08:00 | 24-Feb-23 17:00 | SUNCOR | TE | 29EDD-71 | updates to D20MX at the 29EDD-71 point description and inverted status update | 9 Hours
Continuous |
|
24-Feb-23 08:00 | 01-Mar-23 13:00 | ATCO | RB | 7L65 (709s Vegreville - 710s Vermilion) | stringing OPGW for new phase 2 build of 7L65, setting rider poles between structures 35 and 34 | 5.21 Days
Daily |
|
25-Feb-23 09:00 | 25-Feb-23 11:00 | ATCO | Outage | 7L94 (827s Cranberry Lake - 878s Kidney Lake) | insulator replacement on several poles | 2 Hours
Continuous |
|
25-Feb-23 09:00 | 25-Feb-23 15:00 | ATCO | RB | 7L20 (810s Dome Cutbank - 7L228 tap), 7L228 (845s Big Mountain - 7L20 tap) | high load move | 6 Hours
Continuous |
|
25-Feb-23 11:00 | 25-Feb-23 12:00 | ALTALINK | IO | 887L/1L274(1D2L274-EFT 1D22)BCH Outage | BC Hydro Work | 60 Mins
Daily |
|
25-Feb-23 11:00 | 25-Feb-23 12:00 | BCH | Outage | 1L274 (BCH Elkford tap - BCH Line Creek tap) | de-energize and re-energize EFD substation remotely, does not affect the Alberta ATC | 60 Mins
Continuous |
AB-BC |
25-Feb-23 13:00 | 25-Feb-23 16:00 | ATCO | RB | 7L60 (780s Lubicon - 827s Cranberry Lake), 7L94 (827s Cranberry Lake - 878s Kidney Lake) | pole change | 3 Hours
Continuous |
|
26-Feb-23 08:00 | 26-Feb-23 11:00 | ENMAX | Outage | 21.1TR (SS-21) | LV breaker maintenance | 3 Hours
Continuous |
|
26-Feb-23 10:00 | 27-Feb-23 16:00 | ATCO | RB | 7L60 (780s Lubicon - 827s Cranberry Lake), 7L94 (827s Cranberry Lake - 878s Kidney Lake) | pole change | 30 Hours
Daily |
|
27-Feb-23 07:00 | 17-Mar-23 17:00 | EPCOR | Outage | T3 (Strathcona), S723 (Strathcona), SAB3 (Strathcona) | Strathcona: protection upgrade cut overs | 18.38 Days
Continuous |
|
27-Feb-23 07:00 | 17-Mar-23 17:00 | EPCOR | Outage | 72LS24 (EP 803s Lambton - Strathcona), 72LH8 (EP 803s Lambton - EP Hardisty), S724 (Strathcona), EP 803s L721 (EP 803s Lambton), SDS10 (Strathcona), EP 803s LDS14 (EP 803s Lambton) | Strathcona/Lambton: Strathcona protection upgrade cut overs | 18.38 Days
Continuous |
|
27-Feb-23 07:00 | 28-Feb-23 17:30 | ALTALINK | RB | 700L (422s Westwood - 746L tap), 700L (746s Sherwood Park - 746L tap), 746L (700L tap - 746AL tap) | complete portion of 700L line relocation between structures 23 and 40 - live line work | 1.44 Days
Daily |
|
27-Feb-23 07:15 | 02-Mar-23 17:00 | ENMAX | IO | 50L(44s- C21s) | Altalink outage - 50L FRM str 115-125) - insulator and structure repair | 3.41 Days
Continuous |
|
27-Feb-23 07:15 | 03-Mar-23 17:45 | ALTALINK | Outage | 50L (44s Bearspaw Plant - SS-21) | insulator and structure repair - (str 115-125) | 4.44 Days
Continuous |
|
27-Feb-23 08:00 | 03-Mar-23 16:00 | BCH | Outage | 5CB21 (BCH Cranbrook) | BC protection work | 4.33 Days
Daily |
AB-BC |
27-Feb-23 08:00 | 03-Mar-23 16:00 | BCH | RB | 5L94 (BCH Cranbrook - 102s Langdon) | BC protection work | 4.33 Days
Continuous |
|
27-Feb-23 08:00 | 09-Mar-23 17:00 | ALTALINK | IO | 511s Info Only | configuration changes to equipment | 10.38 Days
Continuous |
|
27-Feb-23 08:00 | 28-Feb-23 16:00 | ALTALINK | Outage | 763AL (447s Enchant - 763L tap), 447s 763A (447s Enchant) | install structure 98 and T-tap for future new 763CL | 1.33 Days
Continuous |
|
27-Feb-23 08:00 | 03-Mar-23 17:00 | ALTALINK | TE | 275s RTU/SCADA (275s Jenner) | to add and test new alarm points for DC splitting/battery bank expansion project | 4.38 Days
Continuous |
|
27-Feb-23 08:00 | 28-Feb-23 16:00 | ENMAX | TE | 162.2TR (SS-162) | relay, protection testing - 162RLY240-162.2TR A GE | 1.33 Days
Continuous |
|
27-Feb-23 08:00 | 01-Mar-23 17:00 | ALTALINK | TE | 410s Josephburg | PRC relay maintenance | 2.38 Days
Daily |
|
27-Feb-23 08:00 | 03-Mar-23 17:00 | ALTALINK | RB | 150L (20s Ghost - 150AL tap), 150L (42s Sarcee - 150AL tap), 150AL (271s Shell Jumping Pound - 150A1L tap), 150A1L (180s Cope Creek - 150AL tap) | 150AL line clearance (STR 10-19) - live line work | 4.38 Days
Daily |
|
27-Feb-23 08:00 | 28-Feb-23 18:00 | ENMAX | Outage | 54.81L (SS-54 - SS-65), SW91 (SS-65), 65B138-D83 (SS-65), 65B138-D84 (SS-65), 54B138-54.81 (SS-54), 65MD138-54.81 (SS-65) | switch maintenence. | 1.42 Days
Continuous |
|
27-Feb-23 08:00 | 28-Feb-23 16:00 | ENMAX | TE | SS-47 | 138 kV bus differential protection Z31 - relay, protection testing, GE UR | replace battery on 47RLY138-Z31 | 1.33 Days
Continuous |
|
27-Feb-23 08:00 | 03-Mar-23 16:00 | ALTALINK | IO | 5L94/1201L protection BCH - Info | BCH work. CBK 5L94 / 1201L PYPN PN/TC, and reclosing OOS. 1201L primary and secondary protection will be out of service one at a time | 4.33 Days
Daily |
|
27-Feb-23 08:00 | 03-Mar-23 17:00 | ATCO | TE | 780s RTU/SCADA (780s Lubicon) | RTU configuration update with additions for BMS alarming | 4.38 Days
Continuous |
|
27-Feb-23 08:00 | 03-Mar-23 17:00 | ALTALINK | RB | 860L (44s Bearspaw Plant - 291s Cochrane) | required for 50L (str 115 -125) work | 4.38 Days
Continuous |
|
27-Feb-23 09:00 | 27-Feb-23 15:00 | ATCO | RB | 7L20 (810s Dome Cutbank - 7L228 tap), 7L228 (845s Big Mountain - 7L20 tap) | high load move | 6 Hours
Continuous |
|
27-Feb-23 09:00 | 01-Mar-23 17:00 | BCH | Outage | 5L91 (BCH Ashton Creek - BCH Selkirk) | Need to inspect three DS's within this zone | 2.33 Days
Continuous |
AB-BC |
27-Feb-23 09:00 | 01-Mar-23 17:00 | ALTALINK | IO | 5L91 (SEL - ACK) BCH - Info | Need to inspect three DS's within this zone. | 2.33 Days
Continuous |
|
27-Feb-23 09:00 | 31-Mar-23 17:00 | ATCO | RB | 9L23 (848s Ruth Lake - 977s Salt Creek), 7L71 (848s Ruth Lake - 2082s Dog Rib), 7L71 (718s Parsons Creek - 2082s Dog Rib), 7L47 (718s Parsons Creek - 848s Ruth Lake) | stringing new 9L193/9L162 over top of existing lines 7L71, 7L47, 9L23 | 32.29 Days
Continuous |
|
27-Feb-23 09:30 | 01-Mar-23 12:00 | ATCO | Outage | 2075s 900SST1 (2075s Newell), 2075s 920 (2075s Newell), 2075s 921 (2075s Newell), 2075s 900SST1D1 (2075s Newell), 2075s 920B (2075s Newell), 2075s 921A (2075s Newell) | 900SST1 PRD trip removal. | 2.1 Days
Continuous |
|
27-Feb-23 10:00 | 08-Mar-23 15:00 | ATCO | Outage | 7L80 (733s Simonette - 857s Kakwa Ridge), 7L80 (740s H.R. Milner - 857s Kakwa Ridge) | line mitigation, cross arm replacement | 9.21 Days
Continuous |
|
27-Feb-23 10:00 | 12-Mar-23 12:00 | ATCO | Outage | 7L30 (732s Mitsue - 844s AEC Mill), 732s 704 (732s Mitsue), 732s 707 (732s Mitsue), 844s 703 (844s AEC Mill), 732s 7L30D1 (732s Mitsue) | 7L30 protection upgrade | 13.04 Days
Continuous |
|
27-Feb-23 10:00 | 01-Mar-23 17:00 | ALTALINK | TE | 65s RTU/SCADA (65s High River) | update RTU for fault reporting | 2.29 Days
Continuous |
|
27-Feb-23 10:00 | 27-Feb-23 17:00 | ALTALINK | TE | 65s High River | 434L - DNP setting changes and testing for implementation of fault reporting to SCADA | 7 Hours
Daily |
|
27-Feb-23 10:00 | 02-Mar-23 16:00 | ATCO | TE | 730s Rycroft | PRC-005 microprocessor relay testing - 7L10, 7L68, 7L73, 144 kV breakers | 3.25 Days
Continuous |
|
27-Feb-23 11:00 | 27-Feb-23 17:00 | ALTALINK | TE | 83s Taber | standard relay maintenance | 6 Hours
Daily |
|
27-Feb-23 11:00 | 27-Feb-23 17:00 | ALTALINK | TE | 254s Coaldale | standard relay maintenance | 6 Hours
Daily |
|
27-Feb-23 11:00 | 27-Feb-23 17:00 | ALTALINK, DOW | TE | 166s Dow Chemical Fort Saskatchewan | PRC relay maintenance | 6 Hours
Daily |
|
27-Feb-23 11:00 | 27-Mar-23 10:00 | ATCO | TE | 732s RTU/SCADA (732s Mitsue) | 7L30, 7L31 protection upgrade, RTU upgrade - 7L23, 7L49, 7L162, 144 kV bus and breakers | 27.92 Days
Continuous |
|
27-Feb-23 11:00 | 27-Mar-23 10:00 | ATCO | TE | 844s RTU/SCADA (844s AEC Mill) | 7L30, 7L31 protection upgrade, RTU upgrade - 144 kV bus
|
27.92 Days
Continuous |
|
27-Feb-23 11:00 | 27-Feb-23 17:00 | ALTALINK | TE | 595s Spruce Grove | relay maintenance | 6 Hours
Daily |
|
27-Feb-23 11:00 | 28-Feb-23 17:00 | ALTALINK | TE | 520s RTU/SCADA (520s Bennett) | T1-2 monitor installation | 30 Hours
Daily |
|
27-Feb-23 12:00 | 01-Mar-23 16:00 | ATCO | TE | 969s Lindbergh | 701T - relay testing | 2.17 Days
Continuous |
|
27-Feb-23 12:30 | 27-Feb-23 17:00 | ALTALINK | TE | 258s Dow Hydrocarbons | relay maintenance | 4.5 Hours
Daily |
|
28-Feb-23 08:00 | 28-Feb-23 17:00 | ALTALINK | TE | 254s Coaldale | standard relay maintenance | 9 Hours
Daily |
|
28-Feb-23 08:00 | 28-Feb-23 17:00 | ALTALINK | TE | 14s Devon | PRC maintenance | 9 Hours
Daily |
|
28-Feb-23 08:00 | 01-Mar-23 17:00 | ALTALINK | TE | 370s North Lethbridge | standard relay maintenance | 1.38 Days
Daily |
|
28-Feb-23 08:00 | 28-Feb-23 17:00 | ALTALINK | TE | 14s RTU/SCADA (14s Devon) | trouble shooting DC system | 9 Hours
Daily |
|
28-Feb-23 08:00 | 28-Feb-23 17:00 | ALTALINK | TE | 233s Beamer | relay maintenance | 9 Hours
Daily |
|
28-Feb-23 08:00 | 28-Feb-23 17:00 | ALTALINK | TE | 899s Edgerton | PRC relay maintenance and settings change | 9 Hours
Daily |
|
28-Feb-23 08:00 | 01-Mar-23 17:00 | ALTALINK | TE | 409s Shell Scotford | relay maintenance | 1.38 Days
Daily |
|
28-Feb-23 08:00 | 28-Feb-23 17:00 | SUNCOR | TE | SUNCOR ICCP Outage | updates to D20MX at the 29EDD-71, point description and inverted status update | 9 Hours
Continuous |
|
28-Feb-23 08:00 | 28-Feb-23 18:00 | ALTALINK | TE | 421s RTU/SCADA (421s Hays), 421s Hays | MPLS upgrade at 421s Hays and RTU outage at 421s | 10 Hours
Daily |
|
28-Feb-23 08:00 | 28-Feb-23 12:00 | ALTALINK | TE | 140s RTU/SCADA (140s Thompson) | confirm the new 3.3 EMS connects to sites in the field | 4 Hours
Daily |
|
28-Feb-23 08:00 | 02-Mar-23 17:00 | ALTALINK | TE | 308s RTU/SCADA (308s Albchem Beaverhill Creek) | reconfigure alarms | 2.38 Days
Daily |
|
28-Feb-23 08:00 | 02-Mar-23 17:00 | ALTALINK | TE | 410s RTU/SCADA (410s Josephburg) | reconfigure alarms | 2.38 Days
Daily |
|
28-Feb-23 08:00 | 02-Mar-23 17:00 | ALTALINK | TE | 308s Albchem Beaverhill Creek, 410s 1 (410s Josephburg) | configuration changes - 776L at both 308s and 410s | 2.38 Days
Daily |
|
28-Feb-23 09:00 | 28-Feb-23 18:00 | ATCO | TE | 780s RTU/SCADA (780s Lubicon), 869s RTU/SCADA (869s Seal Lake) | Telecom tower work | 9 Hours
Continuous |
|
28-Feb-23 09:00 | 28-Feb-23 14:00 | CMH | TE | MHS-2 RTU/SCADA (MHS-2 North Industrial) | reconfiguration of Communications equipment | 5 Hours
Continuous |
|
28-Feb-23 11:00 | 01-Mar-23 14:00 | ATCO | TE | 740s RTU/SCADA (740s H.R.Milner), 857s RTU/SCADA (857s Kakwa Ridge) | aprisa firmware upgrade and radio maintenance | 27 Hours
Continuous |
|
28-Feb-23 13:00 | 28-Feb-23 17:00 | MEGEC | TE | 762s RTU/SCADA (762s Conklin) | card replacement on MPLS node | 4 Hours
Daily |
|
01-Mar-23 06:00 | 04-Mar-23 18:00 | ALTALINK | Outage | 700L (422s Westwood - 746L tap), 700L (746s Sherwood Park - 746L tap), 746L (700L tap - 746AL tap) | 700L line relocation between structures 23 and 41 | 3.5 Days
Continuous |
|
01-Mar-23 07:30 | 13-Mar-23 18:00 | CNRL | IO | 75-PLH-901 (838s Horizon Mining - 849s Joslyn Creek) | ATCO 838S substation expansion tie-in work and protective relay upgrades | 12.4 Days
Continuous |
|
01-Mar-23 07:30 | 13-Mar-23 18:00 | CNRL, ATCO | Outage | 75-PLH-901 (838s Horizon Mining - 849s Joslyn Creek), 849s 907 (849s Joslyn Creek) | Horizon Project - disconnect existing 75-PLH-901 from former 75-PLH-901 bay to new 838S-900BS2 | 12.4 Days
Continuous |
|
01-Mar-23 08:00 | 01-Mar-23 18:00 | Syncrude | TE | ICCP Server Outage | SCADA - Server Update | 10 Hours
Daily |
|
01-Mar-23 08:00 | 01-Mar-23 17:00 | ALTALINK | TE | 138s Windy Flats | standard relay maintenance | 9 Hours
Daily |
|
01-Mar-23 08:00 | 07-Mar-23 18:00 | SUNCOR | Outage | 29EDD-71 29PT-336 (29EDD-71), 29EDD-71 752-4651 (29EDD-71), 29EDD-71 752-4652 (29EDD-71), 29EDD-71 752-4654 (29EDD-71), 29EDD-71 29PS-434 (29EDD-71 Edd71Sub), 29EDD-71 29PS-430 (29EDD-71 Edd71Sub), 29EDD-71 30-252-12501 (29EDD-71) | maintenance and testing | 6.42 Days
Continuous |
|
01-Mar-23 08:00 | 01-Mar-23 17:00 | ALTALINK | TE | 377s RTU/SCADA (377s AML Hardisty) | troubleshoot 703L relay communication issue | 9 Hours
Daily |
|
01-Mar-23 08:00 | 01-Mar-23 17:00 | ALTALINK | TE | 377s AML Hardisty | maintenance on 702L 25/L1 and 769L B21/L6 relays | 9 Hours
Daily |
|
01-Mar-23 08:00 | 01-Mar-23 17:00 | ALTALINK | TE | 377s AML Hardisty | troubleshoot 703L B21 relay communication fail | 9 Hours
Daily |
|
01-Mar-23 08:00 | 01-Mar-23 17:00 | ALTALINK | TE | 37s North Calder | PRC relay maintenance -726L | 9 Hours
Daily |
|
01-Mar-23 08:00 | 02-Mar-23 17:00 | ALTALINK | TE | 71s Lamoureux | PRC relay maintenance - 726L, 997L | 1.38 Days
Daily |
|
01-Mar-23 08:00 | 02-Mar-23 17:00 | ALTALINK | TE | 102s Langdon | standard relay maintenance | 1.38 Days
Daily |
|
01-Mar-23 08:00 | 01-Mar-23 16:00 | ENMAX | Outage | 38.83L (SS-38 - SS-39), 38B138-38.83 (SS-38), 39B138-38.83 (SS-39) | 138-38.83-3 repair/replace insulator - contact with kite | 8 Hours
Continuous |
|
01-Mar-23 08:00 | 01-Mar-23 18:00 | ALTALINK | TE | 415s RTU/SCADA (415s Drywood), 379s RTU/SCADA (379s Shell Canada Waterton) | MPLS upgrade | 10 Hours
Daily |
|
01-Mar-23 08:00 | 01-Mar-23 18:00 | ENMAX | TE | SS-3 | 138 kV bus differential relay and 86 lockout Z31 outage, relay, lockout testing 86, 3RLY138-3.Z31 | 10 Hours
Continuous |
|
01-Mar-23 08:00 | 01-Mar-23 16:00 | ENMAX | Outage | 31.3TR (SS-31) | auxiliary relay missing mounting base in 31.3TR relay panel | 8 Hours
Continuous |
|
01-Mar-23 08:00 | 01-Mar-23 17:00 | ALTALINK | TE | 171s RTU/SCADA (171s Redwater), 171s Redwater | replace flash card | 9 Hours
Daily |
|
01-Mar-23 08:00 | 01-Mar-23 16:00 | ALTALINK | IO | 38.83L (C38s-C39s) Enmax - Info | repair/replace insulator | 8 Hours
Daily |
|
01-Mar-23 08:00 | 01-Mar-23 12:00 | ALTALINK | TE | 447s RTU/SCADA (447s Enchant) | to ensure the new 3.3 EMS connects to sites in the field | 4 Hours
Daily |
|
01-Mar-23 09:00 | 01-Mar-23 17:00 | ATCO | TE | ATCO Radio Tower, 878s RTU/SCADA (878s Kidney Lake) | radio link cutover | 8 Hours
Continuous |
|
01-Mar-23 10:00 | 01-Mar-23 12:00 | ALTALINK | TE | AltaLink RTU/SCADA (AltaLink) | RigSat comm outage | 2 Hours
Daily |
|
01-Mar-23 10:00 | 31-Mar-23 17:00 | ATCO | TE | 849s RTU/SCADA (849s Joslyn Creek) | download changes to RTU and HMI | 30.25 Days
Continuous |
|
01-Mar-23 10:00 | 01-Mar-23 16:00 | ATCO | TE | 794s 702T (794s Valleyview) | 87/702T relay testing | 6 Hours
Continuous |
|
01-Mar-23 10:00 | 31-Mar-23 17:00 | ATCO | TE | 849s RTU/SCADA (849s Joslyn Creek) | download changes to 849S Joslyn RTU and HMI | 30.25 Days
Continuous |
|
01-Mar-23 10:00 | 01-Mar-23 12:00 | ALTALINK | TE | AltaLink Radio Tower | 9000R Radio - MDA has failed and needs to be replaced | 2 Hours
Daily |
|
01-Mar-23 10:30 | 01-Mar-23 12:30 | CMH | TE | Medicine Hat ICCP Outage | testing of a new configuration of the ICCP link to provide more predictable failover in event of comms loss to primary data center. | 2 Hours
Daily |
|
01-Mar-23 12:00 | 01-Mar-23 17:00 | ALTALINK | TE | 252s RTU/SCADA (252s Jarrow) | confirm the new 3.3 EMS connects to sites in the field | 5 Hours
Daily |
|
01-Mar-23 13:00 | 03-Mar-23 17:30 | ATCO | Outage | 2075s 900SST2 (2075s Newell) | 900SST2 PRD trip removal | 2.19 Days
Continuous |
|
02-Mar-23 07:00 | 02-Mar-23 17:00 | EPCOR | Outage | 557s CD2403 (557s Castle Downs) | emergency dashpot repair | 10 Hours
Continuous |
|
02-Mar-23 08:00 | 05-Mar-23 16:00 | ENMAX | TE | SS-25 | 240 kV bus differential zone 43 A and B - lockout testing, 25-Z43A-86, 25-Z43B-86. relay, protection testing 25RLY240-25.Z43 A, 25RLY240-25.Z43 B | 3.33 Days
Daily |
|
02-Mar-23 08:00 | 02-Mar-23 17:00 | ALTALINK | TE | 102s Langdon, 102s 240kV East Bus (102s Langdon) | relay maintenance | 9 Hours
Daily |
|
02-Mar-23 08:00 | 02-Mar-23 17:00 | ALTALINK | TE | 138s 240kV Bus 1 (138s Windy Flats), 138s 240kV Bus 2 (138s Windy Flats) | standard relay maintenance | 9 Hours
Continuous |
|
02-Mar-23 08:00 | 02-Mar-23 17:00 | ALTALINK | TE | 430s Ursus | maintenance on 997L A21/87/L1 and 997L B21/87/L1 protections | 9 Hours
Daily |
|
02-Mar-23 08:00 | 02-Mar-23 17:00 | ALTALINK | TE | 410s Josephburg | maintenance on 857L A87/L6 and 857L B87/L6 protections | 9 Hours
Daily |
|
02-Mar-23 08:00 | 02-Mar-23 17:00 | ALTALINK | TE | 409s Shell Scotford | maintenance on 857L A87/21/79/L3 and 857L B87/21/L3 protections | 9 Hours
Daily |
|
02-Mar-23 08:00 | 04-Mar-23 18:00 | ENMAX | Outage | 65.1TR (SS-65), 240kV South Bus (SS-65), 138kV South Bus (SS-65), 65B240-D130 (SS-65), 65B240-D133 (SS-65), 65MD240-65.1TR (SS-65), 65MD138-65.1TR (SS-65), 65B138-D81 (SS-65), 65B138-D83 (SS-65) | maintenance on SW130, SW136, SW88, SW80, SW81, SW83, MD138-65.1TR, MD240-65.1TR | 2.42 Days
Continuous |
|
02-Mar-23 08:00 | 02-Mar-23 17:00 | ALTALINK | TE | AltaLink Radio Tower, 127s RTU/SCADA (127s Bruderheim), 308s RTU/SCADA (308s Albchem Beaverhill Creek), 365s RTU/SCADA (365s Canadianoxy Astotin Creek) | replace flash card 9013R radio | 9 Hours
Daily |
|
02-Mar-23 08:00 | 04-Mar-23 18:00 | ALTALINK | IO | 65.1TR (C65s) Enmax - Info | ENMAX HV SW maintenance on SW130, SW136, SW88, SW80, SW81, SW83, MD138-65.1TR, MD240-65.1TR | 2.42 Days
Continuous |
|
02-Mar-23 09:30 | 02-Mar-23 12:30 | ALTALINK | Outage | 17s C1 (17s Benalto) | maintenance on PRC load readings and trip coil checks | 3 Hours
Daily |
|
02-Mar-23 10:00 | 02-Mar-23 16:00 | ATCO | TE | 722s Crystal Lake | 144 kV breakers - relay testing | 6 Hours
Continuous |
|
02-Mar-23 13:00 | 02-Mar-23 17:00 | ALTALINK | TE | 852s RTU/SCADA (852s Round Hill), AltaLink TPR Outage, AltaLink MPLS | card replacement | 4 Hours
Daily |
|
03-Mar-23 08:00 | 03-Mar-23 12:00 | ENMAX | Outage | 25B240-D140 (SS-25) | HV breaker SF6 gas sample | 4 Hours
Continuous |
|
03-Mar-23 08:00 | 03-Mar-23 16:00 | ALTALINK | TE | 54s RTU/SCADA (54s Fort Saskatchewan), AltaLink TPR Outage, AltaLink MPLS | upgrade MPLS nodes and card replacement | 8 Hours
Daily |
|
03-Mar-23 12:00 | 03-Mar-23 16:00 | ENMAX | Outage | 25B240-D141 (SS-25) | HV breaker SF6 gas sample | 4 Hours
Continuous |
This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein. © 2009 Alberta Electric System Operator. All rights reserved |