The table below contains the significant transmission outages submitted as tentative to the AESO. These Outages have not yet necessarily been approved, but are listed for awareness and coordination purposes. An Outage has been considered significant for this table if it meets any one (1) or more of the following criteria: |
|
|
|
Note: Where a transmission outage requires generation curtailments, the adjustments to generation will typically happen in the hours before the scheduled transmission outage and in the hour after the element is returned to service. | |
Previous Version | |
Download CSV | |
Owner | From | To | Duration | Element | Scheduled Activity | Affected Intertie |
---|---|---|---|---|---|---|
ENMAX, ALTALINK | 29-Sep-22 17:00 | 11-Oct-22 17:00 | Continuous |
12 Days
37.82L (74s Janet - SS-37), 74s 37.82W (74s Janet), 74s 45 (74s Janet) | replacing breaker 74s37.82 | |
EPCOR | 03-Oct-22 07:00 | 08-Oct-22 17:00 | 5.42 Days
Continuous |
330p 1207 (330p Genesee), 330p 1208 (330p Genesee) | Genesee 1207 bay CVT doble, TX arrestor doble, 1207B/1208A/12GT3D maintenance | |
BCH | 07-Oct-22 18:00 | 20-Oct-22 17:00 | 12.96 Days
Continuous |
1L275 (799s Coleman - BCH Natal) | replace 1-1, 1-2, 1-3, 4-4 and 4-5 with taller structures to resolve clearance violations for FAC-008 | AB-BC |
ENMAX, ALTALINK | 08-Oct-22 08:00 | 08-Oct-22 13:00 | 5 Hours
Continuous |
21MD138-21.4TR (SS-21), 21MD138-21.1TR (SS-21), 21.80L (42s Sarcee - SS-21). 20.82L (SS-20 - SS-21). 60S100. 21.1TR (SS-21). 21.4TR (SS-21), 21.80L (42s Sarcee - SS-21), 21B138-20.82 (SS-21), 20.82L (SS-20 - SS-21), 21.1TR (SS-21), 21.4TR (SS-21) | Fall Substation Washing. Check Reversing Switch 21.1. Altalink required to remove 60S100 sec. fuses | |
Syncrude | 09-Oct-22 08:00 | 19-Oct-22 20:00 | 10.5 Days
Continuous |
Non-Significant Outage: T5 isolatin in Plant 31 to perform maintenance and repairs. The following breakers will be operated: 5235 @ Plant 31 Substation 535 @ Plant 31 Substation The following disconnect switches will be operated: 534 @ Plant 31 Substation, 5235 (Syncrude Mildred Lake), 534 (Syncrude Mildred Lake), 535 (Syncrude Mildred Lake), Mildred T5 (Syncrude Mildred Lake) | Non-Significant Outage: T5 isolatin in Plant 31 to perform maintenance and repairs.
The following breakers will be operated: 5235 @ Plant 31 Substation 535 @ Plant 31 Substation The following disconnect switches will be operated: 534 @ Plant 31 Substation The following transformers will be isolated: T5 @ Plant 31 Substation |
|
Saskpower | 10-Oct-22 08:00 | 14-Oct-22 19:00 | 4.46 Days
Continuous |
SASK POWER P2C | maintenance | AB-SK |
SUNCOR | 10-Oct-22 08:00 | 16-Oct-22 18:00 | 6.42 Days
Continuous |
29EDD-2 29PT-3 (29EDD-2 Tar Island), 29PT-3 / 29PL6-22, 29PL6-22 (29EDD-1 Millennium - 29EDD-2 Tar Island) | 29PT-3 HV Bushing Testing / Replacement at 29EDD-2
29PZ-1 ATS Repair or Replace at 29EDD-2 29PL6-22 protection relays- L90 and SEL 411L @ 29 EDD-1 (A and B protection relays one at a time) |
|
ATCO | 10-Oct-22 08:00 | 17-Oct-22 17:00 | 7.38 Days
Continuous |
7L80 (733s Simonette - 857s Kakwa Ridge) | Line mitigation, Cross arm replacement | |
ATCO | 10-Oct-22 11:30 | 13-Oct-22 14:30 | 3.13 Days
Continuous |
7L224, 7L224 (650s Hansman Lake - 774s Monitor) | GOI Required to continue cross arm replacement project on 7L224. | |
ALTALINK | 11-Oct-22 07:00 | 12-Oct-22 18:00 | 1.46 Days
Daily |
922L (310p-17s) - GOI, 922L (17s Benalto - 310p Sundance) | Line strain insulator replacement @ 310P. Repair 310p20B. | |
ATCO | 11-Oct-22 07:00 | 14-Oct-22 17:00 | 3.42 Days
Continuous |
7L224, 774S 701, 7L224 (650s Hansman Lake - 774s Monitor) | RAS modifications for the Pattern Lanfine WAGF project (P1898) | |
ALTALINK | 11-Oct-22 08:00 | 12-Oct-22 16:30 | 1.35 Days
Continuous |
649s Portion of 138kV Bus (658L) - GOI, 658L (562s Cypress - 649s Chappice Lake) | Disconnecting 472s & MR1 from 649s 138kV Bus | |
ALTALINK | 11-Oct-22 08:00 | 12-Oct-22 18:00 | 1.42 Days
Continuous |
12s T1-C Tx18823 – GOI, 12s T1 (12s Heartland) | Repair major oil leaks on the transformer. | |
BCH | 11-Oct-22 09:00 | 27-Oct-22 17:00 | 16.33 Days
Continuous |
2L293 (BCH Nelway - BCH Selkirk) | replace structures and timbers and PT replacement BC maintenance does not affect the Alberta ATC | AB-BC |
ALTALINK | 11-Oct-22 12:00 | 13-Oct-22 18:00 | 2.25 Days
Continuous |
310p T36 - GOI, 310p T36 (310p Sundance) | 310P T36 bushing replacement | |
ALTALINK | 12-Oct-22 07:30 | 12-Oct-22 12:30 | 5 Hours
Daily |
698s452 - GOI, 698s 452 (698s Jackfish) | Investigate trip coil 1 fail | |
ALTALINK, Lethbridge | 12-Oct-22 07:30 | 12-Oct-22 17:30 | 10 Hours
Continuous |
725L (15s-240s-L674s) - GOI, 725L (15s Fort MacLeod - 725BL tap), 725L (674s Bowron - 725BL tap), 725BL (240s McBride Lake - 725L tap), 674s 725W (674s Bowron) | 725L fire mitigation on str 725L229. | |
ALTALINK, Lethbridge | 12-Oct-22 07:30 | 13-Oct-22 16:00 | 1.35 Days
Continuous |
725L (15s Fort MacLeod - 725BL tap), 725L (674s Bowron - 725BL tap), 725LW (674s) | 725LW Maintenace | |
Lethbridge, ALTALINK | 12-Oct-22 07:30 | 13-Oct-22 16:00 | 1.35 Days
Continuous |
725LE (674s-111s-618s), 725L (674s Bowron - 725AL tap), 725L (111s Coalbanks - 725AL tap), 725AL (618s Riverbend - 725L tap) | 725LE Maintenace | |
CNRL | 12-Oct-22 07:30 | 20-Oct-22 18:00 | 8.44 Days
Continuous |
75-PLH-904 (838s Horizon Mining - 842s Horizon Upgrading) | 260 kV 311L Relay Upgrade | |
ATCO, ALBIAN | 12-Oct-22 08:00 | 12-Oct-22 18:00 | 10 Hours
Continuous |
920s 901 (920s Jackpine), 920s 901T (920s Jackpine) | 2022 Fall shutdown | |
ALTALINK, STROBE | 12-Oct-22 09:30 | 12-Oct-22 17:00 | 7.5 Hours
Daily |
240s (725BL54) TAU - Advice, 725BL (240s McBride Lake - 725L tap), 300L (240s McBride Lake - 725BL tap) | maintenance | |
ALTALINK | 12-Oct-22 11:00 | 12-Oct-22 15:00 | 4 Hours
Daily |
250p 11 (250p Bighorn Plant) | maintenance | |
ALTALINK | 12-Oct-22 12:30 | 12-Oct-22 17:30 | 5 Hours
Daily |
698s552 - GOI, 698s 552 (698s Jackfish) | Investigate breaker trouble/fail alarm | |
SUNCOR | 13-Oct-22 06:00 | 20-Oct-22 18:00 | 7.5 Days
Continuous |
29PL9-4 (29EDD-1 Millennium - 29EDD-3), 29EDD-1 29EDD1s352 (29EDD-1 Millennium), 29EDD-1 29EDD1s252 (29EDD-1 Millennium), 29EDD-1 29EDD1SPL9-4 (29EDD-1 Millennium) | Transformer Line protection upgrade
29PT-5 Replace PRD in GTG-5 Outage (CBR parallel ASCR scope) |
|
EPCOR, ALTALINK | 13-Oct-22 07:00 | 18-Oct-22 17:00 | 5.42 Days
Continuous |
D2403 and 909LW @ Dome E665S and Sundance310P, 909L (310p Sundance - 665s Dome), 665s D2403 (665s Dome) | Dome D2403 Bay Doble and Breaker Maintenance, 909LW CT/Arrestor Doble | |
ALTALINK | 13-Oct-22 07:15 | 14-Oct-22 17:45 | 1.44 Days
Continuous |
610L (83s - 336s) GOI, 610L (83s Taber - 336s Fincastle) | Outage to disconnect and remove smart wires power flow controller at 336s (AESO Smart Wire Project) | |
ATCO | 13-Oct-22 08:00 | 17-Oct-22 16:00 | 4.33 Days
Continuous |
7L44 (749s Flyingshot Lake - 845s Big Mountain) | Pole Changes | |
ALTALINK | 13-Oct-22 09:00 | 13-Oct-22 13:00 | 4 Hours
Daily |
250p 22 (250p Bighorn Plant) | maintenance | |
ALTALINK | 14-Oct-22 07:00 | 14-Oct-22 18:00 | 11 Hours
Daily |
63s 138kV South Bus GOI, 63s 138kV South Bus (63s Red Deer), 63s T2 (63s Red Deer) | Complete salvage and demo work to remove 63s22, 63s80x, and 63s16. Removing / Disconnecting 63s22 creates open point releasing 63s80x and 63s16 for salvage. | |
ALTALINK | 14-Oct-22 07:00 | 17-Oct-22 18:00 | 3.46 Days
Continuous |
820L (254s - I-315s - 67s) - GOI, 820L (254s Coaldale - 820AL tap), 820L (67s Stirling - 820AL tap), 820AL (315s Chin Chute - 820L tap) | Installing inline switches and T-tap structures for completion of newly built 820BL (Structures #451 & 452) | |
ALTALINK | 17-Oct-22 06:15 | 22-Oct-22 17:45 | 5.48 Days
Continuous |
607L (135s - 607L108) GOI, 607L (135s Conrad - 607AL tap), 135s T1 (135s Conrad), 135s T2 (135s Conrad) | Transmission Line Maintenance (Str 182 ~ 223) | |
ALTALINK, ENMAX | 17-Oct-22 07:00 | 18-Oct-22 17:00 | 1.42 Days
Continuous |
74s23.80 (138kV South Bus, 23.80L, 24.83, 74s 138kV South Bus (74s Janet), 24.83L (74s Janet - SS-24), 23.80L (74s Janet - SS-23) | Replacing Breaker 74s23.80 | |
ALTALINK | 17-Oct-22 07:30 | 21-Oct-22 16:30 | 4.38 Days
Continuous |
511s SVC Plus GOI, AML 511s SVC Plus (AML 511s Crossings) | SVC Plus VCS maintenance, fence repair on Reactors and IGBT Inspection.. | |
ENMAX, ALTALINK | 17-Oct-22 08:00 | 19-Oct-22 18:00 | 2.42 Days
Continuous |
771L (SS-47 - SS-162). 162sub 138KV Bus. SS-47, 771L (SS-47 - SS-162), 162B138-RB81 (SS-162), 162B138-RB82 (SS-162), 162MD138-771L (SS-162) | 162 Sub 138kV DFR Installation | |
ALTALINK | 17-Oct-22 09:00 | 27-Oct-22 18:00 | 10.38 Days
Continuous |
1034L (244s - 324s) - GOI, 1034L (244s Bowmanton - 324s Cassils) | Damper replacement between Structures #32-243 & 368-389 | |
ALTALINK | 17-Oct-22 10:30 | 20-Oct-22 17:30 | 3.29 Days
Continuous |
74s T1(TX18570) GOI, 74s T1 (74s Janet), 74s 16 (74s Janet) | Transformer maintenance, doble, leak repairs | |
ATCO, ALTALINK | 17-Oct-22 11:00 | 21-Oct-22 15:00 | 4.17 Days
Continuous |
7L77, 7L77 (395s North Holden - 709s Vegreville) | GOI required on 7L77 for cross arm and insulator replacement. | |
ALTALINK | 18-Oct-22 06:30 | 20-Oct-22 18:00 | 2.48 Days
Continuous |
72s T1 Tx18404 GOI, 72s T1 (72s Leismer) | 25kV bushing replacement, 72sT1 doble, 72sT1 maint, 72sT1 SFRA&LR and 72sT1 manhole leak | |
ALTALINK | 18-Oct-22 08:00 | 18-Oct-22 16:30 | 8.5 Hours
Daily |
324s1152 GOI, 324s 1152 (324s Cassils) | Gas gauge reading incorrectly and needs repair | |
ATCO | 18-Oct-22 08:00 | 19-Oct-22 17:00 | 1.38 Days
Daily |
7L32, 7L32 (811s Clairmont Lake - 862s South Bezanson) | 862S S. Bezanson Substation Rebuild Project, Disconnect and remove 7L32PT3, tap up mobile 902s | |
ALTALINK, ENMAX | 18-Oct-22 17:00 | 27-Oct-22 17:00 | 9 Days
Continuous |
74s23.80 (23.80L) - GOI, 23.80L (74s Janet - SS-23) | Replacing Breaker 74s23.80 | |
ALTALINK | 19-Oct-22 08:00 | 19-Oct-22 16:30 | 8.5 Hours
Daily |
349s10 GOI, 349s 10 (349s Stavely) | Install single phase PT with wildlife cover up, add a new junction box and PT distribution module. Install new line protection relay | |
ALTALINK | 19-Oct-22 08:00 | 19-Oct-22 17:00 | 9 Hours
Daily |
786L (799s-NTL) OOS, 786L (799s Coleman - BCH Natal) | Open 786L breakers for testing of RAS equipment at 799s-103s. Work is coordinated with BC Hydro 786/1L275 outage. | AB-BC |
ATCO | 19-Oct-22 08:00 | 22-Oct-22 17:00 | 3.38 Days
Continuous |
939S 900BS2, 939S 900BS3, 9L10, 939S 903T, 9L10 (876s Brintnell - 939s Livock), 939s 903T (939s Livock), 939s 240kV Bus 900BS2 (939s Livock), 939s 240kV Bus 900BS3 (939s Livock) | Livock Pile Heaving Project -
Connect bypass to 900BS3 and 900BS2 Create open jumper J1 between 900BS3 and 900D1 Update relay settings too |
|
ALTALINK | 19-Oct-22 10:00 | 19-Oct-22 16:00 | 6 Hours
Daily |
65s753E GOI, 753L (65s High River - 253s Blackie) | Install, wire and commission a maintenance switch for breaker 852 | |
ALTALINK, ATCO | 20-Oct-22 06:15 | 20-Oct-22 17:45 | 11.5 Hours
Daily |
923L (356s - 2075s) GOI, 923L (356s Milo - 2075s Newell) | Emergency Repair; repair the Interphase spacer between structure 99-100 | |
ALTALINK, Lethbridge | 20-Oct-22 08:00 | 20-Oct-22 10:00 | 2 Hours
Daily |
370s175 (172L) GOI, 172L (181s Chinook - 370s North Lethbridge) | Trip test 552 breaker from new C60 module. Move trips from 552 C60 to new breaker | |
ALTALINK, Lethbridge | 20-Oct-22 10:00 | 20-Oct-22 12:00 | 2 Hours
Daily |
370s207X (207L) GOI, 207L (111s Coalbanks - 370s North Lethbridge) | Trip test 652 breaker from new C60 module. Move trips from 652 C60 to new breaker | |
ALTALINK | 20-Oct-22 12:00 | 20-Oct-22 14:00 | 2 Hours
Daily |
370s2152 GOI, 370s 2152 (370s North Lethbridge), 370s T3 (370s North Lethbridge) | Trip test 2152 breaker from new C60 module. Move trips from 2152 C60 to new breaker | |
ALTALINK | 21-Oct-22 06:15 | 21-Oct-22 17:45 | 11.5 Hours
Daily |
765L (151s - 419s) GOI, 765L (151s Strathmore - 419s Chestermere) | Emergency repair; repair for conductor on the top right phase at structure 296 | |
ALTALINK | 22-Oct-22 07:00 | 22-Oct-22 19:00 | 12 Hours
Continuous |
38s T1, 138kV Bus 1, & 736L (293s) - GOI, 38s T1 (38s East Edmonton), 736L (38s East Edmonton - 293s Bernese), 38s 138kV Bus 1 (38s East Edmonton) | Replace insulators on 138kV Bus 1, replace switches 38s93 & 38s94, replace CTs @ 38s736E. | |
ALTALINK | 23-Oct-22 06:15 | 23-Oct-22 17:45 | 11.5 Hours
Daily |
607L (336s - 134s - 135s) GOI, 607AL (134s Taber Wind Farm - 607L tap), 607L (135s Conrad - 607AL tap), 607L (336s Fincastle - 607AL tap) | Transmission Line Maintenance (Str 99) | |
EPCOR | 24-Oct-22 07:00 | 29-Oct-22 17:00 | 5.42 Days
Continuous |
1058L @ Lambton E803S and Summerside E657S, 1058L (657s Summerside - EP 803s Lambton) | Aerial: 1058L Steel Structure Refurbishment | |
ENMAX, ALTALINK | 24-Oct-22 08:00 | 25-Oct-22 16:00 | 1.33 Days
Continuous |
832L. 12.1TR, 832L (SS-10 - SS-12) | Install repaired radiator on 12.1TR | |
ATCO | 24-Oct-22 08:00 | 31-Oct-22 17:00 | 7.38 Days
Continuous |
7L80 (733s Simonette - 857s Kakwa Ridge) | Line mitigation, Cross arm replacement | |
ALTALINK | 24-Oct-22 08:00 | 04-Nov-22 13:00 | 11.21 Days
Continuous |
63s652 GOI, 63s 652 (63s Red Deer) | 652 GOI Request for the 652 Breaker Failure and Control P&C Upgrade. | |
ALTALINK | 24-Oct-22 09:00 | 27-Oct-22 18:00 | 3.38 Days
Continuous |
44s 138kV Bus (T1, T2 & 860L), 44s T1 (44s Bearspaw Plant), 44s T2 (44s Bearspaw Plant), 44s 860W (44s Bearspaw Plant), 860L (44s Bearspaw Plant - 291s Cochrane), 291s 860 (291s Cochrane) | 44s34 switch replace, 860L strain insulator replacement, 860L VSR salvage, 44s35 adjust, 44s860w current sensing fail | |
ATCO | 24-Oct-22 10:30 | 27-Oct-22 17:00 | 3.27 Days
Continuous |
856S 902T, 856s 902T (856s Kinosis) | 902T Maintenance | |
ATCO | 24-Oct-22 12:00 | 20-Dec-22 17:00 | 57.25 Days
Continuous |
720s 901T (720s Wabasca), 720s 502R (720s Wabasca), 720s 504R (720s Wabasca), 720S 720-501 | 720S Wabasca 901T Replacement, Load transferred to 902T | |
ATCO | 24-Oct-22 16:00 | 19-Dec-22 17:00 | 56.08 Days
Continuous |
939s 901T (939s Livock), 939S 900BS1, 939S 700BS1, 939s 240kV Bus 900BS1 (939s Livock), 939s 144kV Bus 700BS1 (939s Livock), 7L125 (939s Livock - 950s Germain) | Livock Pile Heaving Project - Outage on 901T, 900BS1, and 700BS1 | |
ALTALINK | 25-Oct-22 08:30 | 25-Oct-22 16:30 | 8 Hours
Daily |
310p1652 GOI, 310p 1652 (310p Sundance) | 1st trip PRC 5 maintenance. | |
ALTALINK | 25-Oct-22 08:30 | 25-Oct-22 17:30 | 9 Hours
Daily |
320P2152 – GOI, 320p 2152 (320p Keephills) | Fix SF6 gas leak | |
BCH | 25-Oct-22 09:00 | 10-Nov-22 17:00 | 16.38 Days
Continuous |
1L274 (48s Pocaterra - 978s BCH Britt Creek) | replace end of life structures and set poles BC maintenance does not affect the Alberta ATC | AB-BC |
EPCOR | 26-Oct-22 07:00 | 26-Oct-22 17:00 | 10 Hours
Continuous |
CD2401 @ Castledowns E557S, 557s CD2401 (557s Castle Downs) | CD2401: NAIT Tour Switching Demonstration | |
ALTALINK | 26-Oct-22 07:00 | 27-Oct-22 17:00 | 1.42 Days
Continuous |
275s T2(Tx18458)& 240kV BUS 2 GOI, 275s T2 (275s Jenner), 275s 240kV Bus 2 (275s Jenner) | Close Open Point "C", Install 949L slack span from transmission structure to A-frame, install wire bus drops to switch. This will energize the new Joss 240kV Bay. 2nd scope: repair hot switch 275s45 | |
ALTALINK | 26-Oct-22 08:30 | 26-Oct-22 16:30 | 8 Hours
Daily |
310p2352 GOI, 310p 2352 (310p Sundance) | 1st trip PRC 5 maintenance. | |
ALTALINK | 27-Oct-22 08:00 | 28-Oct-22 17:30 | 1.4 Days
Continuous |
1135L NEW (39s-Open Point 'H') - GOI | Complete functional testing for new 1135L protections, | |
ALTALINK | 27-Oct-22 10:00 | 27-Oct-22 15:00 | 5 Hours
Continuous |
180L(255s - 928s) GOI, 180L (255s Vulcan - 928s East Stavely) | PRC 1st trip and maintenance if required. 2nd Scope: Hardware tighten structure 180L161. | |
ALTALINK | 28-Oct-22 07:00 | 30-Oct-22 18:30 | 2.48 Days
Continuous |
658L (562s - I_662s - 649s) - GOI, 658L (562s Cypress - 649s Chappice Lake) | RAS207 and RAS208 implementation and testing from 562s to 662s | |
ALTALINK | 28-Oct-22 14:45 | 30-Oct-22 17:45 | 2.13 Days
Continuous |
349s Station & 197L(928s-349s) GOI, 197L (349s Stavely - 928s East Stavely), 349s T1 (349s Stavely) | 1.two single phase CVT to be installed with existing CVT2 to provide voltage input for undervoltage protection. 2.Add a junction box and connect to a new CVT distribution module. 3.Implement undervoltage protection A&B | |
ALTALINK | 28-Oct-22 14:45 | 30-Oct-22 17:45 | 2.13 Days
Continuous |
180L(180L296A-928s-255s) GOI, 180L (255s Vulcan - 928s East Stavely), 197L (349s Stavely - 928s East Stavely) | Rebuild of autorestoration equipment at 928s 2nd Scope: Hardware tighten at 180L161 & repair structures 180L24 & 25 | |
ALTALINK | 28-Oct-22 17:30 | 15-Nov-22 15:00 | 17.94 Days
Continuous |
1135L NEW (39s-Open Point 'H') - GOI | Complete 1135L construction | |
ALTALINK | 29-Oct-22 08:00 | 30-Oct-22 17:30 | 1.4 Days
Continuous |
1084L NEW (39s-Open Point 'O') - GOI | Complete functional testing for new 1084L protections | |
ALTALINK | 29-Oct-22 08:15 | 30-Oct-22 16:00 | 31.75 Hours
Continuous |
180L(15s-180L297) GOI, 180L (15s Fort Macleod - 180AL tap), 15s 180N (15s Fort Macleod) | Line outage required for installation of screw piles underneath 180L | |
ALTALINK | 30-Oct-22 17:30 | 15-Nov-22 15:00 | 15.94 Days
Daily |
1084L NEW (39s-Open Point 'O') - GOI | Complete 1084L construction | |
Lethbridge, ALTALINK | 31-Oct-22 08:00 | 31-Oct-22 12:00 | 4 Hours
Continuous |
667L and 813L ( 146s), 667L (146s MacDonald - 370s North Lethbridge), 813L (146s MacDonald - 241s Uplands) | OPEN END OUTAGE TO ENERGIZE 146S T1 NEW TRANSFORMER | |
ALTALINK, ENMAX | 31-Oct-22 09:00 | 04-Nov-22 18:00 | 4.38 Days
Continuous |
44s 138kV Bus (50L & 36.81L) - GOI, 50L (44s Bearspaw Plant - SS-21), 36.81L (44s Bearspaw Plant - SS-36), 44s 50X (44s Bearspaw Plant), 44s 36.81E (44s Bearspaw Plant) | 44s38 switch replace, 36.18L PT addition, 36.18L strain insulator replace, 36.18L VSR salvage | |
ALTALINK | 31-Oct-22 09:00 | 09-Nov-22 18:00 | 9.42 Days
Continuous |
1034L (244s - 324s) - GOI, 1034L (244s Bowmanton - 324s Cassils) | Damper replacement between Structures #32-243 & 368-389 | |
ALTALINK, EPCOR | 31-Oct-22 11:00 | 04-Nov-22 17:00 | 4.25 Days
Continuous |
1045L (310p-320p-E805s) - GOI, 1045AL (320p Keephills - 1045L tap), 1045L (310p Sundance - 1045AL tap), 1045L (EP 805s Jasper - 1045AL tap) | Customer line injection testing to verify grounding | |
ALTALINK | 31-Oct-22 11:30 | 03-Nov-22 17:30 | 3.25 Days
Continuous |
89s652 - GOI, 89s 652 (89s Ellerslie) | 1st trip & PRC5 maintenance & change leaking capacitors | |
ALTALINK | 01-Nov-22 08:00 | 01-Nov-22 13:00 | 5 Hours
Daily |
63s552 GOI, 63s 552 (63s Red Deer) | 552 GOI Request for the 652 Breaker Failure and Control P&C Upgrade. | |
ALTALINK | 01-Nov-22 08:00 | 02-Nov-22 17:30 | 1.4 Days
Continuous |
1168L NEW (39s-Open Point 'F') - GOI | Complete functional testing for new 1168L protections. | |
SUNCOR | 01-Nov-22 08:00 | 02-Nov-22 20:00 | 1.5 Days
Continuous |
635-952-635PT-1000, 635EDD-1000 PT-1000 (635EDD-1000) | Replace the leadking opening dashpot on the 260kV breaker | |
ATCO | 01-Nov-22 08:00 | 08-Nov-22 17:00 | 7.42 Days
Continuous |
7L01 (813s Little Smoky - 881s Sturgeon 2) | 813S Little Smoky Rebuild
Complete 7L01 wiring panel 7P3, 711, 712 CT/PT/P&C wiring. Demo existing wiring/cabling, remove old panel 8G Relay programming and functionality Commission control, alarms and status |
|
ALTALINK | 01-Nov-22 09:00 | 01-Nov-22 16:00 | 7 Hours
Daily |
887L (48s) OOS, 887L (48s Pocaterra - 978s BCH Britt Creek) | Open 887L at 48s for 9074R to 9273R Radio repair - This outage is coordinated with BC Hydro 887L outage. | |
ATCO | 01-Nov-22 10:00 | 01-Nov-22 11:00 | 60 Mins
Continuous |
7L22 (790s Poplar Hill - 7L88 tap), 790s 702 (790s Poplar Hill) | 731S Elmworth Project
Protection upgrades |
|
ATCO | 01-Nov-22 13:00 | 01-Nov-22 14:00 | 60 Mins
Continuous |
7L07 (790s Poplar Hill - 815s Goodfare), 790s 703 (790s Poplar Hill) | 731S Elmworth Project
Protection upgrades |
|
ALTALINK | 02-Nov-22 07:00 | 03-Nov-22 18:00 | 1.46 Days
Continuous |
836L (61s-283s) - GOI, 836L (61s Lodgepole - 283s Violet Grove) | Install Bird Diverters on Crossarms at Structures 836L144, 145, 146, 147, 148, 149 & 150. | |
ALTALINK | 02-Nov-22 07:15 | 22-Nov-22 17:45 | 20.48 Days
Continuous |
924L (102s - 356s) GOI, 924L (102s Langdon - 356s Milo) | Phase 3 of 924L project between Structures 13A-299, (work include M-tower bracket change outs, replacing insulation, replacing cold end hardware, replacing OHSW assemblies, and replacing spacer assemblies) | |
ALTALINK | 02-Nov-22 07:30 | 02-Nov-22 17:00 | 9.5 Hours
Daily |
63s 240kV South BUS GOI, 63s T2 (63s Red Deer), 63s 240kV South Bus (63s Red Deer) | 63s 240BN GOI request for the 652 Breaker Failure and Control P&C upgrade. | |
ENMAX | 02-Nov-22 08:00 | 03-Nov-22 16:00 | 1.33 Days
Continuous |
65.1TR (SS-65) | 65.1TR MT PRD Junction Box Investigate & Repair, Calisto cylinder exchange | |
ALTALINK | 02-Nov-22 17:30 | 15-Nov-22 15:00 | 12.94 Days
Continuous |
1168L NEW (39s-Open Point 'F') - GOI | Complete 1084L construction | |
ENMAX | 03-Nov-22 08:00 | 04-Nov-22 18:00 | 1.42 Days
Continuous |
162.81L (391s Balzac - SS-162). 162sub 138KV Bus, 162.81L (391s Balzac - SS-162), 162B138-RB80 (SS-162), 162B138-RB81 (SS-162), 162MD138-162.81 (SS-162) | 162 Sub 138kV DFR Installation | |
ALTALINK | 07-Nov-22 07:00 | 10-Nov-22 13:00 | 3.25 Days
Continuous |
74s T1 (Tx 18570) - GOI, 74s T1 (74s Janet) | Replace T1 ‘A’ and ‘B’ protections | |
ATCO | 07-Nov-22 08:00 | 13-Nov-22 17:00 | 6.38 Days
Continuous |
7L80 (733s Simonette - 857s Kakwa Ridge) | Line mitigation, Cross arm replacement | |
ATCO | 07-Nov-22 10:00 | 07-Nov-22 14:00 | 4 Hours
Continuous |
7L32 (813s Little Smoky - 862s South Bezanson) | 862S S. Bezanson Substation Rebuild Project,
Reconnect Jumper J3 |
|
ATCO | 07-Nov-22 10:00 | 10-Nov-22 16:00 | 3.25 Days
Continuous |
7L224, 774S 701, 7L224 (650s Hansman Lake - 774s Monitor) | Install 2 relays for line protections RAS A&B | |
ATCO | 07-Nov-22 12:00 | 13-Nov-22 16:00 | 6.17 Days
Continuous |
7L93 (828s Sulphur Point - 930s Arcenciel) | Line Mitigation | |
ALTALINK | 08-Nov-22 07:30 | 09-Nov-22 18:00 | 1.44 Days
Continuous |
1065L (74s - 102s) - GOI, 1065L (74s Janet - 102s Langdon) | Repairing 74s122 | |
ALTALINK | 08-Nov-22 08:00 | 08-Nov-22 16:30 | 8.5 Hours
Daily |
338s552 GOI, 338s 552 (338s Cherhill) | doble 3 CT's and take oil samples on 338s552 CT's (CT5). | |
ATCO | 08-Nov-22 11:00 | 08-Nov-22 17:00 | 6 Hours
Continuous |
7L32, 7L32 (811s Clairmont Lake - 862s South Bezanson) | 862S S. Bezanson Substation Rebuild Project, Tap down mobile 902s from 7L32 | |
ALTALINK | 09-Nov-22 06:00 | 09-Nov-22 18:00 | 12 Hours
Daily |
39s 240kV B2 & T2 - GOI, 39s T2 (39s Bickerdike), 39s 240kV Bus 2 (39s Bickerdike), 39s 1152 (39s Bickerdike), 39s 29 (39s Bickerdike), 39s 1752 (39s Bickerdike) | Fix corona issue found on 240B2 and DC ground fault found on 1152 breaker | |
ALTALINK | 09-Nov-22 13:00 | 10-Nov-22 16:00 | 27 Hours
Continuous |
701L (223s - 7L701D1) - GOI, 701L (223s Strome - 7LA701 tap) | Change arms and insulation on structures 421 and 424 | |
ALTALINK | 10-Nov-22 13:00 | 10-Nov-22 18:00 | 5 Hours
Daily |
74s T1 & 240kV Bus B1 (1065L) - GOI, 74s T1 (74s Janet), 74s 240kV Bus 1 (74s Janet), 1065L (74s Janet - 102s Langdon) | Test tripping of T1 high and low side breakers for new ‘A’ and ‘B’ protections | |
EPCOR | 14-Nov-22 07:00 | 25-Nov-22 17:00 | 11.42 Days
Continuous |
TX2 Zone @ Bellamy E814S, 814s T2 (814s Bellamy), 814s B2402 (814s Bellamy), 814s B2406 (814s Bellamy) | Bellamy 240kV SF6 Maintenance | |
ALTALINK, ATCO | 14-Nov-22 07:00 | 25-Nov-22 18:00 | 11.46 Days
Continuous |
1035L (244s - A2075s) - GOI, 1035L (244s Bowmanton - 2075s Newell) | Damper replacement between Structures #32-243 & 368-389 | |
ATCO | 14-Nov-22 08:00 | 16-Nov-22 17:00 | 2.38 Days
Continuous |
9L46 (932s Pemukan - 959s Lanfine) | Sharp Hills Wind Farm Project
Outage for structure foundations work directly under 9L46 |
|
ALTALINK | 14-Nov-22 09:00 | 15-Nov-22 18:00 | 1.38 Days
Continuous |
122s Tx18554 (T3) – GOI, 122s T3 (122s Alberta Newsprint) | Fix leaks, maintain & test T3. Replace cracked CT on 13.8kV bus. | |
ATCO | 14-Nov-22 09:00 | 25-Nov-22 17:30 | 11.35 Days
Continuous |
13L50 (DC LINK), 13L50 (2029s Heathfield - 2075s Newell) | EATL OUTAGE
- Valve Hall Inspections - PRC-005 Testing - Fire System Tests - Repair Ground Switches |
|
ATCO | 14-Nov-22 10:00 | 21-Nov-22 17:30 | 7.31 Days
Continuous |
9L59 (801s Anderson - 972s Tinchebray) | Energize 1045s Garden Plain Substation.
Update settings at 801s and 972s on 9L59 relays to 3 terminal line differential. |
|
ALTALINK | 14-Nov-22 10:30 | 17-Nov-22 16:00 | 3.23 Days
Continuous |
39s26 - GOI, 39s 26 (39s Bickerdike) | Replacement of 39s26 CTs | |
ALTALINK | 15-Nov-22 08:00 | 16-Nov-22 18:00 | 1.42 Days
Daily |
887L (48s) OOS, 887L (48s Pocaterra - 978s BCH Britt Creek) | Open 887L at 48s for MPLS upgrades. | |
EPCOR | 21-Nov-22 07:00 | 24-Nov-22 17:00 | 3.42 Days
Continuous |
TX1 @ Castledowns E557S, 557s T1 (557s Castle Downs) | Castledowns: Meter Upgrade P&C Cut-Overs | |
EPCOR, ALTALINK | 21-Nov-22 07:00 | 02-Dec-22 17:00 | 11.42 Days
Continuous |
PDS4, PDS5, PDS11, (1055L) @ Petrolia E816S and Argyll Transfer Station E629S, 1055L (629s Argyll Transfer Station - 816s Petrolia), 816s P2402 (816s Petrolia), 816s P2403 (816s Petrolia), 816s PDS4 (816s Petrolia), 816s PDS5 (816s Petrolia), 816s PDS11 (816s Petrolia), 240BA3 (629s Argyll Transfer Station - 814s Bellamy) | Petrolia PDS4, PDS5, PDS11 LCR | |
ALTALINK | 21-Nov-22 07:30 | 24-Nov-22 16:30 | 3.38 Days
Continuous |
74s2052 - GOI, 74s 2052 (74s Janet) | Replace 74s2052 breaker protection module | |
ATCO | 21-Nov-22 08:00 | 28-Nov-22 17:00 | 7.38 Days
Continuous |
7L80 (733s Simonette - 857s Kakwa Ridge) | Line mitigation, Cross arm replacement | |
ATCO | 21-Nov-22 10:00 | 23-Nov-22 17:30 | 2.31 Days
Continuous |
848s 902T (848s Ruth Lake), 848s 602TD (848s Ruth Lake) | 72KV Rigid bus repair work. | |
ATCO | 21-Nov-22 12:00 | 28-Nov-22 16:00 | 7.17 Days
Continuous |
7L93, 7L93 (828s Sulphur Point - 930s Arcenciel) | Line Mitigation | |
EPCOR | 22-Nov-22 07:00 | 22-Nov-22 17:00 | 10 Hours
Continuous |
TX1 @ Summerside E657S, 657s T1 (657s Summerside) | Summerside TX1 Tap Changer Maintenance | |
ALTALINK | 22-Nov-22 07:30 | 22-Nov-22 18:30 | 11 Hours
Daily |
86s 240kV Bus & T1 - GOI, 914L (86s Bigstone - 87s Gaetz), 914L (86s Bigstone - 289s Saunders Lake), 86s 240kV Bus (86s Bigstone), 86s T1 (86s Bigstone) | Replace risers on 86s1752 & 86s1252. Replace 240kV JB DC1. | |
EPCOR | 23-Nov-22 07:00 | 23-Nov-22 17:00 | 10 Hours
Continuous |
1098L Jasper Zone @ Jasper Terminal E805S and Poundmaker, 1098L (EP 805s Jasper - Poundmaker), EP 805s J2401 (EP 805s Jasper), EP 805s J2407 (EP 805s Jasper) | Jasper: JDS1 Disconnect Maintenance | |
ALTALINK | 23-Nov-22 12:00 | 23-Nov-22 16:00 | 4 Hours
Daily |
275s2 GOI, 275s 2 (275s Jenner) | Outage on breaker 275s2 (1452) for circuit cutovers to new L5 ‘B’ protection | |
ALTALINK | 23-Nov-22 23:00 | 24-Nov-22 03:00 | 4 Hours
Continuous |
62s 11 (62s Brazeau Plant Plant) | maintenance | |
ALTALINK | 24-Nov-22 03:00 | 24-Nov-22 07:00 | 4 Hours
Daily |
62s 12 (62s Brazeau Plant Plant) | maintenance | |
EPCOR | 28-Nov-22 07:00 | 09-Dec-22 17:00 | 11.42 Days
Continuous |
240BA3 Zone @ Bellamy E814S and Argyll Transfer Station E629S, 240BA3 (629s Argyll Transfer Station - 814s Bellamy) | Bellamy 240kV SF6 Maintenance | |
ALTALINK | 28-Nov-22 07:30 | 01-Dec-22 16:30 | 3.38 Days
Continuous |
74s2152 - GOI, 74s 2152 (74s Janet) | Replace 74s2152 breaker protection module | |
ALTALINK | 28-Nov-22 08:00 | 01-Dec-22 17:30 | 3.4 Days
Continuous |
370s 240kV Bus 1 (370s North Lethbridge), 370s T3 (370s North Lethbridge), 370s 240kV BUS 1 & T3(Tx 18307) GOI | Replacement of the 370s25 post insulators adjustment of switch | |
ATCO | 28-Nov-22 08:00 | 05-Dec-22 17:00 | 7.38 Days
Continuous |
7L46, 7L46 (813s Little Smoky - 845s Big Mountain) | 813S Little Smoky Rebuild
Complete 7L46 wiring panel 7P2, 705, 706 CT/PT/P&C wiring. Demo existing wiring/cabling, remove old panel 7G, replace 705CT and 706CT junction boxes. Relay programming and functionality Commission control, alarms and status |
|
ATCO | 28-Nov-22 08:00 | 13-Dec-22 17:00 | 15.38 Days
Continuous |
9L46 (932s Pemukan - 959s Lanfine) | Sharp Hills Wind Farm Project
Outage for Line termination to 363S Sedalia on 9L46 |
|
BCH | 28-Nov-22 09:00 | 02-Dec-22 17:00 | 4.33 Days
Continuous |
T2 (BCH Natal) | transformer inspection/ doble and non-electrical testing BC maintenance does not affect the Alberta ATC | AB-BC |
ALTALINK, ATCO | 28-Nov-22 09:00 | 05-Dec-22 18:00 | 7.38 Days
Continuous |
1035L (244s - A2075s) - GOI, 1035L (244s Bowmanton - 2075s Newell) | Damper replacement between Structures #32-243 & 368-389 | |
ALTALINK | 28-Nov-22 12:00 | 02-Dec-22 18:00 | 4.25 Days
Continuous |
997L (430s-71s) - GOI, 997L (71s Lamoureux - 430s Ursus) | Component Replacements on 997L ( Str's Range 9-22) | |
ALTALINK | 30-Nov-22 06:15 | 30-Nov-22 18:45 | 12.5 Hours
Daily |
924L (102s - 356s) GOI, 924L (102s Langdon - 356s Milo) | Phase 3 of 924L project between Structures 90, 92, (work include changing out dead-end insulators on structures) | |
ALTALINK | 30-Nov-22 11:00 | 30-Nov-22 15:00 | 4 Hours
Daily |
250p 11 (250p Bighorn Plant) | maintenance | |
ALTALINK | 30-Nov-22 12:00 | 30-Nov-22 16:00 | 4 Hours
Continuous |
275s8 GOI, 275s 8 (275s Jenner) | Outage on breaker 275s8 (1652) for circuit cutovers to new L4 ‘A’ protection | |
ALTALINK | 01-Dec-22 07:15 | 15-Dec-22 17:45 | 14.44 Days
Continuous |
927L (102s - 356s) GOI, 927L (102s Langdon - 356s Milo) | Phase 3 of 927L project between Structures 33-301, (work include replacing insulation, replacing cold end hardware, replacing OHSW assemblies, replacing spacer assemblies, find, fix and splice the wire core between 33-44) | |
ALTALINK | 01-Dec-22 09:00 | 01-Dec-22 13:00 | 4 Hours
Daily |
250p 22 (250p Bighorn Plant) | maintenance | |
ALTALINK | 05-Dec-22 09:30 | 05-Dec-22 12:30 | 3 Hours
Daily |
74s16 (T1) - Advice, 74s T1 (74s Janet) | Trip test 74s16 from new 2052 breaker fail relay | |
ATCO | 05-Dec-22 12:00 | 12-Dec-22 16:00 | 7.17 Days
Continuous |
7L93, 7L93 (828s Sulphur Point - 930s Arcenciel) | Line Mitigation | |
ALTALINK | 05-Dec-22 12:30 | 05-Dec-22 15:30 | 3 Hours
Daily |
74s2152 - Advice, 74s 2152 (74s Janet) | Trip test 74s2152 from new 2052 breaker fail relay | |
ALTALINK | 05-Dec-22 15:30 | 05-Dec-22 18:30 | 3 Hours
Daily |
74s2552 - Advice, 74s 2552 (74s Janet) | Trip test 74s2552 from new 2052 breaker fail relay | |
ALTALINK | 06-Dec-22 09:30 | 06-Dec-22 12:30 | 3 Hours
Daily |
74s2752 - Advice, 74s 2752 (74s Janet) | Trip test 74s2752 from new 2052 breaker fail relay | |
ALTALINK | 06-Dec-22 12:30 | 06-Dec-22 15:30 | 3 Hours
Daily |
74s3752 - Advice, 74s 3752 (74s Janet) | Trip test 74s3752 from new 2052 breaker fail relay | |
ALTALINK | 06-Dec-22 15:30 | 06-Dec-22 18:30 | 3 Hours
Daily |
74s552 - Advice, 74s 552 (74s Janet) | Trip test 74s552 from new 2052 breaker fail relay | |
ALTALINK | 07-Dec-22 09:30 | 07-Dec-22 12:30 | 3 Hours
Daily |
74s2052 - Advice, 74s 2052 (74s Janet) | Trip test 74s2052 from new 2152 breaker fail relay | |
ALTALINK | 07-Dec-22 12:00 | 07-Dec-22 16:00 | 4 Hours
Continuous |
275s8 GOI, 275s 8 (275s Jenner) | Outage on breaker 275s8 (1652) for circuit cutovers to new L4 ‘A’ protection | |
ALTALINK | 07-Dec-22 12:30 | 07-Dec-22 15:30 | 3 Hours
Daily |
74s2252 - Advice, 74s 2252 (74s Janet) | Trip test 74s2252 from new 2152 breaker fail relay | |
ENMAX, ALTALINK | 10-Dec-22 08:00 | 11-Dec-22 16:00 | 1.33 Days
Continuous |
936L, 936L (5s East Calgary - 102s Langdon) | Line Clearance Mitigation | |
ENMAX, ALTALINK | 10-Dec-22 08:00 | 11-Dec-22 16:00 | 1.33 Days
Continuous |
937L, 937L (5s East Calgary - 102s Langdon) | Line Clearance Mitigation | |
ATCO | 12-Dec-22 08:00 | 15-Dec-22 17:00 | 3.38 Days
Continuous |
7L80, 7L80 (733s Simonette - 857s Kakwa Ridge) | Line mitigation, Cross arm replacement | |
EPCOR | 12-Dec-22 09:30 | 22-Dec-22 17:00 | 10.31 Days
Continuous |
240BA2 Zone @ Bellamy E814S and Argyll Transfer Station E629S, 240BA2 (629s Argyll Transfer Station - 814s Bellamy), 814s B2401 (814s Bellamy), 814s B2402 (814s Bellamy) | Bellamy 240kV SF6 Maintenance | |
ENMAX, ALTALINK | 16-Dec-22 08:00 | 18-Dec-22 16:00 | 2.33 Days
Continuous |
936L, 936L (5s East Calgary - 102s Langdon) | Line Clearance Mitigation | |
ENMAX, ALTALINK | 16-Dec-22 08:00 | 18-Dec-22 16:00 | 2.33 Days
Continuous |
937L, 937L (5s East Calgary - 102s Langdon) | Line Clearance Mitigation | |
ATCO | 20-Dec-22 08:00 | 20-Dec-22 17:00 | 9 Hours
Continuous |
939S 900BS2, 939S 900BS3, 9L10 (876s Brintnell - 939s Livock), 939s 903T (939s Livock), 939s 240kV Bus 900BS2 (939s Livock), 939s 240kV Bus 900BS3 (939s Livock) | Livock Pile Heaving Project
Close jumper and Disconnect Bypass |
|
ATCO | 03-Jan-23 08:00 | 09-Jan-23 17:00 | 6.38 Days
Continuous |
7L80, 7L80 (733s Simonette - 857s Kakwa Ridge) | Line mitigation, Cross arm replacement | |
ALTALINK | 04-Jan-23 08:30 | 05-Jan-23 16:30 | 1.33 Days
Continuous |
895s100 (100L) - Advice, 100L (498s Tilley - 895s Suffield) | Migrate and commission all 895s100 (752) & L2-100L at 895s Suffield associated line protections, recloser, synch check, breakers, breaker fail alarms, status, controls, metering and remote access to new RTU and LAN. Implement fault reporting on 100L. | |
ATCO | 09-Jan-23 11:00 | 23-Jan-23 10:00 | 13.96 Days
Continuous |
7L32, 7L32 (813s Little Smoky - 862s South Bezanson) | 813S Little Smoky Rebuild
BKR 701 and 702 P&C wiring in panel 7P1, prep work Demo panel 1G Relay programming and functionality Commission control, alarms and status |
|
ALTALINK | 10-Jan-23 08:30 | 11-Jan-23 17:30 | 1.38 Days
Continuous |
895s892 (892L) - Advice, 892L (244s Bowmanton - 895s Suffield) | Migrate and commission all 895s892 (652) & L1-892L at 895s Suffield associated line protections, Overload RAS, recloser, synch check, breakers, breaker fail alarms, status, controls, metering and remote access to new RTU and LAN. Implement fault reporting on 892L. | |
ALTALINK | 12-Jan-23 09:00 | 19-Jan-23 17:00 | 7.33 Days
Continuous |
763AL (763AL1 - 447s) - GOI, 763AL (447s Enchant - 763L tap) | Outage needed to build line tap structure and connect new 763CL | |
ATCO | 16-Jan-23 08:00 | 23-Jan-23 17:00 | 7.38 Days
Continuous |
7L80, 7L80 (733s Simonette - 857s Kakwa Ridge) | Line mitigation, Cross arm replacement | |
ATCO | 17-Jan-23 09:30 | 17-Jan-23 17:00 | 7.5 Hours
Continuous |
730S 700 BUS 1, 730s 144kV Bus 1 (730s Rycroft), 7L73 (730s Rycroft - 829s Boucher Creek), 730s 701T (730s Rycroft) | SVC addition and 144 kV bus upgrade. 700BS1 will be OOS to create open jumper J2. | |
ATCO | 18-Jan-23 07:00 | 29-Jan-23 17:00 | 11.42 Days
Continuous |
730S 700 BUS 1, 7L68 (730s Rycroft - 811s Clairmont Lake), 7L73 (730s Rycroft - 829s Boucher Creek), 730s 144kV Bus 1 (730s Rycroft) | SVC addition and 144 kv bus rebuild. | |
ATCO | 30-Jan-23 08:00 | 06-Feb-23 17:00 | 7.38 Days
Continuous |
7L80, 7L80 (733s Simonette - 857s Kakwa Ridge) | Line mitigation, Cross arm replacement | |
ATCO | 30-Jan-23 08:00 | 08-Feb-23 17:00 | 9.38 Days
Continuous |
75-PLH-901 (838s Horizon Mining - 849s Joslyn Creek) | disconnect existing 75-PLH-901 from Horizon substation 75 and connect new bus Horizon substation 75 (former 75-PLH-901 bay) to new 838S-900BS2 ATCO 9L32-9L66 CNRL- Horizon Project | |
ATCO | 30-Jan-23 09:30 | 30-Jan-23 17:00 | 7.5 Hours
Continuous |
730S 700 BUS 1, 7L73 (730s Rycroft - 829s Boucher Creek), 730s 144kV Bus 1 (730s Rycroft), 730s 701T (730s Rycroft) | SVC addition and 144 kV bus upgrade | |
ATCO | 13-Feb-23 08:00 | 20-Feb-23 17:00 | 7.38 Days
Continuous |
7L80, 7L80 (733s Simonette - 857s Kakwa Ridge) | Line mitigation, Cross arm replacement | |
CNRL | 13-Feb-23 08:00 | 22-Feb-23 17:00 | 9.38 Days
Continuous |
75-PLH-902 (838s Horizon Mining - 849s Joslyn) | ATCO 9L32-9L66 CNRL- Horizon Project
Disconnect existing 75-PLH-902 from Horizon substation 75 Connect new bus Horizon substation 75 (former 75-PLH-902 bay)to new 838S-900BS1 Reroute and connect 9L137 (former 75-PLH-902) to new 838S and energize Commission 87L/900BS1 protection, end-to-end testing Upgrade 21B/9L137 line protection @ 849S Joslyn Commission line protection, SCADA and end-to-end testing, BF/DTT to 838S |
|
ATCO | 21-Feb-23 10:00 | 28-Feb-23 17:00 | 7.29 Days
Continuous |
7L45, 7L45 (798s Bridge Creek - 813s Little Smoky) | 813S Little Smoky Rebuild813S Little Smoky Rebuild
BKR 703 and 704 P&C wiring, remove old panel 7G, set up new panel 7P4, prep work Relay programming and functionality Commission control, alarms and status |
|
ATCO | 27-Feb-23 08:00 | 03-Mar-23 17:00 | 4.38 Days
Continuous |
9L32 (849s Joslyn Creek - 2005s Secord) | ATCO 9L32-9L66 CNRL- Horizon Project
Disconnect existing line 9L32 at tap point and connect new line segment to 838S Horizon Expansion Disconnect existing 9L32 from Joslyn 849S Commissioning upgrade - relay settings @ 2005S |
|
ATCO | 06-Mar-23 08:00 | 06-Mar-23 17:00 | 9 Hours
Continuous |
7L80 (733s Simonette - 740s H.R. Milner) | Remove Temp jumpers to Isolate North/South portions of the line | |
CNRL | 17-Mar-23 08:00 | 22-Mar-23 17:00 | 5.38 Days
Continuous |
75-PLH-902 (838s Horizon Mining - 849s Joslyn) | ATCO 9L32-9L66 CNRL- Horizon Project
Protection Work |
|
ATCO | 20-Mar-23 09:00 | 31-Mar-23 17:30 | 11.35 Days
Continuous |
13L50 (DC LINK), 13L50 (2029s Heathfield - 2075s Newell) | HMI IT Upgrades AT 2075s & 2029s | |
ATCO | 20-Mar-23 10:00 | 03-Apr-23 17:00 | 14.29 Days
Continuous |
7L54, 7L54 (794s Valleyview - 813s Little Smoky) | 813S Little Smoky Rebuild813S Little Smoky Rebuild
BKR 703 and 704 P&C wiring, remove old panel 7G, set up new panel 7P4, prep work Relay programming and functionality Commission control, alarms and status |
|
ATCO | 23-Mar-23 08:00 | 28-Mar-23 17:00 | 5.38 Days
Continuous |
75-PLH-901 (838s Horizon Mining - 849s Joslyn Creek) | ATCO 9L32-9L66 CNRL- Horizon Project
Protection Work |
|
ATCO | 27-Mar-23 08:00 | 30-Mar-23 17:00 | 3.38 Days
Continuous |
7L91, 7L91 (715s Leming Lake - 826s Marguerite Lake) | Cold Lake Area Energy Centre Project
Cutover CT/PT/P&C ccts for new Thermal RAS relays Complete commissioning 49A/49B/7L91 relays End-to-end testing to 1064S |
|
ATCO | 24-Apr-23 11:00 | 08-May-23 17:00 | 14.25 Days
Continuous |
7L40, 7L40 (733s Simonette - 813s Little Smoky) | 813S Little Smoky Rebuild
Complete 7L40 wiring panel 7P5, 709, 710 CT/PT/P&C wiring. Demo existing wiring/cabling, remove old panel 4G Relay programming and functionality Commission control, alarms and status |
|
SUNCOR | 01-May-23 08:00 | 14-May-23 18:00 | 13.42 Days
Continuous |
29EDD-1, 29EDD-1 Millennium, 29EDD-1 260kV North Bus 2 (29EDD-1 Millennium) | N260B1 + Relays, 29CVT-11, 29PS-72/76.
29EDD-1S1/1S7/1S13/1S452/1S152 + Relays, 952-101/104 + Controller + Relays |
|
SUNCOR | 01-May-23 08:00 | 30-May-23 18:00 | 29.42 Days
Continuous |
29EDD-94, 29EDD-94 Voyageur | 29EDD94; breaker maintenance & test | |
ATCO | 22-May-23 08:00 | 29-May-23 17:00 | 7.38 Days
Continuous |
9L16, 9L16 (755s Cordel - 972s Tinchebray) | Upgrade 21A/B-9L16 protection relay wiring/programming and commission LTO/DTT | |
ATCO | 19-Jun-23 08:00 | 10-Jul-23 17:00 | 21.38 Days
Continuous |
7L587, 7L587 (822s Wolf Lake - 826s Marguerite Lake) | 822S Wolf lake P&C and SCADA Upgrade
Work on Breaker 822S 701 Cut over cabling and protection to new panel Commission new protection including teleprotection DTT to 826S |
|
ATCO | 26-Jun-23 08:00 | 01-Jul-23 17:00 | 5.38 Days
Continuous |
9L93, 9L93 (615s Halkirk - 972s Tinchebray) | Connect new 9LA93 T-tap. Cut in, reroute, restring, and splice OPGW from Str#60 to 615S Halkirk. Complete cutover and commission Protection/SCADA/Telecom at new 973S Lanes Lake, 972S, 615S Halkirk | |
ATCO | 26-Jun-23 13:00 | 03-Jul-23 17:00 | 7.17 Days
Continuous |
766S 144KV Bus, 766S 240KV Bus | 766S Nevis Rebuild Project - Upgrade bus to bundled 477, connect new 704A, P&C wiring and commissioning, | |
ATCO | 17-Jul-23 08:00 | 07-Aug-23 17:00 | 21.38 Days
Continuous |
7L574, 7L574 (822s Wolf Lake - 7L574 tap) | 822S Wolf lake P&C and SCADA Upgrade
Work on Breaker 822S 702 Cut over cabling and protection to new panel Line crew prep 7L86/7L574 bypass and connect to 7L574 Commission new protection including teleprotection DTT from 970S Bourque to 822S, install temp relay settings for 7L574/7L86 bypass |
|
ATCO | 07-Aug-23 13:00 | 07-Aug-23 17:00 | 4 Hours
Continuous |
7L86 (822s Wolf Lake - 1200s Foster Creek), 7L86 | 822S Wolf lake P&C and SCADA Upgrade
Line crew connect bypass to 7L86 1200S Foster Creek Sub OOS |
|
ATCO | 14-Aug-23 08:00 | 04-Sep-23 17:00 | 21.38 Days
Continuous |
822s 703 (822s Wolf Lake), 7L86 (822s Wolf Lake - 1200s Foster Creek) | 822S Wolf lake P&C and SCADA Upgrade
Work on Breaker 822S 703 Cut over cabling and protection to new panel. Commission new protection including teleprotection DTT. 7L86/7L574 bypass will be in service |
|
ATCO | 21-Aug-23 10:00 | 21-Aug-23 17:00 | 7 Hours
Continuous |
9L20 (755s Cordel - 766s Nevis), 9L912 (63s Red Deer - 766s Nevis), 766s 901T (766s Nevis) | 766S Nevis Rebuild Project - Hot Line crew connect 9L20/9L912 bypass, cut in open Jumper J1 and J2 | |
ATCO | 21-Aug-23 10:00 | 06-Nov-23 17:00 | 77.33 Days
Continuous |
766S 144KV Bus, 766S 240KV Bus | 766S Nevis Rebuild Project - Replace and commission 9L912D1, 9L20D2, 901, 902, 901CT, 902CT, 901A, 902A, 900PT1, connect new bus section | |
ATCO, IMPERIALOIL | 23-Aug-23 08:00 | 30-Sep-23 18:00 | 38.42 Days
Continuous |
7L105 (837s Mahihkan - 909s Mahno), 7L161 (909s Mahno - 942s Nabiye), 909s 52A3 (909s MAHNO), 909s TNS-A1 (909s Mahno), 909s TNS-A2 (909s Mahno) | maintenance | |
ATCO | 04-Sep-23 13:00 | 04-Sep-23 17:00 | 4 Hours
Continuous |
7L86, 7L574, 7L574 (822s Wolf Lake - 7L574 tap) | 822S Wolf lake P&C and SCADA Upgrade
Line crew to disconnect 7L574/7L86 bypass 1200S Foster Creek Sub OOS |
|
ATCO | 07-Nov-23 10:00 | 07-Nov-23 17:00 | 7 Hours
Continuous |
9L20 (755s Cordel - 766s Nevis), 9L912 (63s Red Deer - 766s Nevis), 766s 901T (766s Nevis) | 766S Nevis Rebuild Project - Hot Line crew disconnect 9L20/9L912 bypass, close open Jumper J1 and J2, Energize 240kV bus including new 903T and to 144kV bus | |
ENMAXEC | 15-Jul-24 08:00 | 19-Jul-24 18:00 | 4.42 Days
Continuous |
383s T1 (383s Kettles Hill Windfarm), 383s T2 (383s Kettles Hill Windfarm) | substation maintenance |
AB-BC, AB-SK & AB-MATL: refer to AESO web posting: | http://itc.aeso.ca/itc/public/atc |
Also, | |
AB-BC, AB-SK & AB-MATL: refer to ISO Rule 203.6: | http://www.aeso.ca/rulesprocedures/18592.html |
Prepared On: | 2022-09-28 15:01:55 |
This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein. © 2009 Alberta Electric System Operator. All rights reserved |