Alberta Electric System Operator | |
System Co-ordination Plan | |
2022-07-07 to 2022-07-15 | |
Approved Outages |
Previous Version | |
Download CSV |
From | To | Owner | Type | Element | Scheduled Activity | Date/Time Comments | Interconnection |
---|---|---|---|---|---|---|---|
05-Oct-18 08:00 | 31-Dec-23 16:00 | EPCOR | IO | C2 (Rossdale) | forced outage | Continuous |
1,913.38 Days
|
24-Oct-18 01:13 | 31-Dec-23 16:00 | EPCOR | IO | C1 (Rossdale) | forced outage | 1,894.66 Days
Continuous |
|
01-Jan-21 08:00 | 04-Jan-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 30EDD-200 | 733.42 Days
Continuous |
|
02-Jan-21 08:00 | 05-Jan-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-181
|
733.42 Days
Continuous |
|
05-Jan-21 08:00 | 01-Jun-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29PT-69
|
877.38 Days
Continuous |
|
24-Jan-21 08:00 | 07-Jan-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-161
|
713.42 Days
Continuous |
|
02-Feb-21 08:00 | 10-Jan-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-221
|
707.42 Days
Continuous |
|
24-Feb-21 08:00 | 11-Jan-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-211; substation ground test; PM 5y - 34.5kV | 686.42 Days
Continuous |
|
01-Mar-21 08:00 | 03-Feb-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-221 ;29PT-605 system | 704.42 Days
Continuous |
|
01-Mar-21 08:00 | 04-Feb-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-161; 29PT-582 system | 705.42 Days
Daily |
|
01-Mar-21 08:00 | 05-Feb-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-171; 29PT-600 system | 706.42 Days
Daily |
|
09-Dec-21 13:00 | 31-Aug-22 17:00 | ATCO | Outage | 863s 902T (863s Paintearth), 863s 901TD (863s Paintearth) | forced outage and troubleshooting | 265.13 Days
Continuous |
|
01-Jan-22 08:00 | 06-Mar-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 30EDD-200 | 429.42 Days
Daily |
|
01-Jan-22 08:00 | 07-Mar-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 30EDD-200 | 430.42 Days
Daily |
|
01-Jan-22 08:00 | 19-Oct-22 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-9 | 291.38 Days
Daily |
|
01-Jan-22 08:00 | 09-Nov-22 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-8 | 312.42 Days
Daily |
|
18-Mar-22 16:30 | 08-Aug-22 23:59 | NWE, BHE Canada, BHE | Outage | Marias South Series Capacitor, North Series Capacitor (BHE Hay Lake) | repair series capacitor bypass breaker | 143.31 Days
Continuous |
AB-MATL |
10-Apr-22 08:00 | 29-Nov-22 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29PL-3 | 233.46 Days
Daily |
|
12-Apr-22 12:00 | 08-Aug-22 23:59 | NWE, BHE Canada | Outage | Marias South Series Capacitor | urgent- replace the Marias series capacitor bypass breaker 2385 Phase B | 118.5 Days
Continuous |
AB-MATL |
18-Apr-22 08:00 | 29-May-23 17:00 | ATCO | TE | 813s Little Smoky 144kV Bus 1, 813s Little Smoky 144kV Bus 2, 813s Little Smoky 240kV Bus 1, 813s Little Smoky 240kV Bus 2 | 813S Little Smoky rebuild: cutover wiring to the new relays as their corresponding apparatus are out of service | 406.38 Days
Continuous |
|
18-Apr-22 08:00 | 29-May-23 17:00 | ATCO | TE | 813s Little Smoky | 813S Little Smoky rebuild: cutover wiring to the new relays as their corresponding apparatus are out of service | 406.38 Days
Continuous |
|
19-Apr-22 08:00 | 29-May-23 17:00 | ATCO | TE | 813s Little Smoky | protection relay work | 405.38 Days
Continuous |
|
20-Apr-22 08:30 | 14-Aug-22 18:00 | ALTALINK | Outage | 38s C1 (38s East Edmonton), 38s 3052 (38s East Edmonton) | breaker maintenance and testing | 116.4 Days
Daily |
|
02-May-22 08:00 | 30-Sep-22 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29PP-901 | 151.42 Days
Daily |
|
12-May-22 18:00 | 30-Oct-22 12:00 | ALTALINK | IO | 1168L NEW (39s-Open Point 'F') - GOI | continued construction | 170.75 Days
Daily |
|
17-Jun-22 07:00 | 29-Jul-22 17:00 | ATCO | TE | ATCO PMU | 2075s: replace memory/storage card on PMU relay | 42.42 Days
Continuous |
|
19-Jun-22 08:00 | 15-Jul-22 20:00 | ATCO | TE | ATCO TPR Outage, ATCO Radio Tower | Virginia Hills & Swan Dive Telecom to cover carrier cutover from the constellation to radio,
cutover to new antenna |
26.5 Days
Continuous |
|
20-Jun-22 06:00 | 07-Jul-22 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 30PK-10 and 30PK-11 at 30EDD-2 | 17.5 Days
Continuous |
|
20-Jun-22 07:00 | 08-Jul-22 17:00 | EPCOR | Outage | T2 (Poundmaker), PM2401 (Poundmaker), PM2405 (Poundmaker) | doble, disconnect maintenance | 18.42 Days
Continuous |
|
20-Jun-22 08:00 | 14-Jul-22 16:00 | ENMAX | Outage | 24.2TR (SS-24) | transformer secondary cables are faulted (forced outage) | 24.33 Days
Continuous |
|
21-Jun-22 08:00 | 15-Jul-22 17:00 | ALTALINK | Outage | 276s T2 (276s Union Carbide Prentiss) | maintain & doble T2 | 24.38 Days
Continuous |
|
22-Jun-22 07:00 | 19-Dec-22 17:00 | ATCO | Outage | 730s 702 (730s Rycroft) | SVC addition and 144 kV bus rebuild, salvage 730s702 and 7L68D3 | 180.46 Days
Continuous |
|
22-Jun-22 08:00 | 28-Jul-22 16:00 | ENMAX | Outage | 14.3TR (SS-14) | faulty 25KV phase C cable between the 14.3TR transformer and switchgear | 36.33 Days
Continuous |
|
23-Jun-22 07:00 | 08-Jul-22 17:00 | EPCOR | IO | BUS 5 and TX3 (Initial Energization) @ Summerside E657S | summerside southeast expansion initial energization bus 5/tx3 and on-load checks | 15.42 Days
Continuous |
|
27-Jun-22 06:00 | 10-Jul-22 18:00 | SUNCOR | Outage | 29EDD-34 260kV Bus 29PP-24 (29EDD-34), 29PL7-1 (29EDD-34 - 29EDD-85), 29EDD-34 29PT-112 (29EDD-34) | 29PP-24 and 29PT-112 system PM 5y,10y and 29PS68 replace damaged contacts | 13.5 Days
Continuous |
|
27-Jun-22 08:00 | 15-Jul-22 16:00 | ALTALINK | IO | 310p Sundance | 310p access – crew on site for Cascade project | 18.33 Days
Daily |
|
27-Jun-22 08:00 | 08-Jul-22 16:00 | ENMAX | Outage | 33.2TR (SS-33) | maintenance and testing | 11.33 Days
Continuous |
|
29-Jun-22 07:00 | 12-Jul-22 18:00 | ALTALINK | RB | 973L (39s Bickerdike - 310p Sundance) | work in proximity to energized 973L for completion of 974L | 13.46 Days
Continuous |
|
29-Jun-22 07:00 | 12-Jul-22 18:00 | ALTALINK | Outage | 39s 240kV Bus 1 (39s Bickerdike), 39s 138kV Bus 1 (39s Bickerdike), 974L (39s Bickerdike - 310p Sundance), 39s T1 (39s Bickerdike) | complete relocation of 974L to new bay at 39s | 13.46 Days
Continuous |
|
29-Jun-22 07:00 | 12-Jul-22 17:30 | ALTALINK | TE | 39s RTU/SCADA (39s Bickerdike) | Cascade Project - update HMI, SLD, and RTU | 13.44 Days
Daily |
|
01-Jul-22 08:00 | 15-Jul-22 20:00 | Syncrude | Outage | ML2 (Syncrude Mildred Lake - UE-1 Syncrude Plant 30-2), 1015 (Syncrude Mildred Lake), UE-1 7201 (UE-1 Syncrude Plant 30-2) | line outage | 14.5 Days
Continuous |
|
04-Jul-22 08:00 | 17-Jul-22 16:00 | SUNCOR | Outage | 29EDD-1 29EDD1s1152 (29EDD-1 Millennium) | breaker replacement | 13.33 Days
Continuous |
|
04-Jul-22 08:30 | 08-Jul-22 17:30 | ALTALINK | Outage | 513s Lundbreck, 514L (513s Lundbreck - 514BL tap), 513s T1 (513s Lundbreck) | T1 doble & leak repairs; SFRA test; install mech for lock and tag | 4.38 Days
Continuous |
|
04-Jul-22 09:00 | 09-Jul-22 17:30 | ALTALINK | IO | 920L (37s-E557s) Epcor - Advice | aerial: steel structure refurbishment | 5.35 Days
Continuous |
|
04-Jul-22 09:00 | 08-Jul-22 16:00 | ATCO | Outage | 732s 902 (732s Mitsue) | breaker maintenance | 4.29 Days
Continuous |
|
04-Jul-22 09:00 | 08-Jul-22 17:00 | ATCO | TE | 948s RTU/SCADA (948s Heatburg) | RTU upgrade for new RAS relays | 4.33 Days
Continuous |
|
04-Jul-22 09:00 | 08-Jul-22 18:00 | ALTALINK | Outage | 514L (396s Pincher Creek - 514BL tap), 514BL (322s Cowley Ridge Windplant - 514L tap), 514L (513s Lundbreck - 514BL tap) | CRU and fire mitigation on structures #1 - 189 | 4.38 Days
Continuous |
|
04-Jul-22 09:00 | 08-Jul-22 17:00 | BCH | RB | 2L113 (BCH Cranbrook - BCH Natal) | 2L113 10-01 to 16-01 widening & hazard tree removals - live line work | 4.33 Days
Daily |
|
04-Jul-22 09:30 | 09-Jul-22 17:00 | ALTALINK, EPCOR | Outage | 920L (37s North Calder - 557s Castle Downs) | aerial: steel structure refurbishment | 5.31 Days
Continuous |
|
04-Jul-22 09:30 | 08-Jul-22 17:30 | ATCO | TE | 848s 901T (848s Ruth Lake) | CSP for 901T protection relays and primary injections | 4.33 Days
Continuous |
|
04-Jul-22 10:00 | 08-Jul-22 17:30 | ATCO | Outage | 948s 701T (948s Heatburg) | transformer class 2 major testing 701T @ 948S
|
4.31 Days
Continuous |
|
04-Jul-22 10:00 | 07-Jul-22 16:00 | ATCO | Outage | 734s 701T (734s Sturgeon) | transformer maintenance | 3.25 Days
Continuous |
|
04-Jul-22 10:00 | 07-Jul-22 19:00 | ALTALINK | Outage | 291s T1 (291s Cochrane) | transformer maintenance, doble, bird cover | 3.38 Days
Continuous |
|
04-Jul-22 10:30 | 08-Jul-22 17:00 | ATCO | TE | 880s 701T (880s Briker), 7L42 (716s Lloydminster - 751s Hill) | 880s: upgrade to station controller and new HMI | 4.27 Days
Continuous |
|
04-Jul-22 11:30 | 08-Jul-22 17:30 | ALTALINK | RB | 730L (197s Bardo - 732L tap), 730L (285s East Camrose - 732L tap), 732L (299s Kingman - 732AL tap), 732AL (301s Queensland - 732L tap) | temporary bypass and 730L switch replacements - hot line work | 4.25 Days
Daily |
|
04-Jul-22 12:00 | 07-Jul-22 18:00 | ALTALINK | Outage | 288s T1 (288s Wolf Creek) | PRC5 maintenance, doble, leaks | 3.25 Days
Continuous |
|
04-Jul-22 12:00 | 07-Jul-22 17:30 | ATCO | TE | 801s Anderson, 7L85 (801s Anderson - ATC 803s Bullpound), 801s RTU/SCADA (801s Anderson) | 801s: commissioning/updates/testing of new RAS#200 901T O/L | 3.23 Days
Continuous |
|
04-Jul-22 12:00 | 07-Jul-22 17:30 | ATCO | TE | 804s Wintering Hills, 7L85 (801s Anderson - ATC 803s Bullpound), 7L85 (803s ATC Bullpound - 804s Wintering Hills), 804s RTU/SCADA (804s Wintering Hills), 801s Anderson | test new POTT scheme between 801s, 804s & 981s on 7L85, RAS relay testing between 804s and 981s | 3.23 Days
Continuous |
|
04-Jul-22 16:00 | 07-Jul-22 17:30 | ALTALINK | Outage | 866s T1 (866s Sundance Make-Up) | re-gasket lid and fix oil leaks on 866sT1 | 3.06 Days
Continuous |
|
05-Jul-22 08:00 | 11-Jul-22 17:00 | ATCO | Outage | 7L80 (740s H.R. Milner - 857s Kakwa Ridge) | line mitigation, cross arm replacement | 6.38 Days
Continuous |
|
05-Jul-22 08:00 | 12-Jul-22 17:00 | ALTALINK | Outage | 180s Cope Creek, 180s T1 (180s Cope Creek), 180s T2 (180s Cope Creek) | install pile for new power PT, install station service cabling to disconnect, install new 138kV power PT to supply station service power | 7.38 Days
Continuous |
|
05-Jul-22 08:00 | 14-Jul-22 17:00 | ATCO | TE | ATC 803s Bullpound | alarm point and relay update | 9.38 Days
Continuous |
|
05-Jul-22 08:00 | 10-Jul-22 16:00 | ATCO | RB | 9L20 (755s Cordel - 766s Nevis) | changing all of the conductor spacers on 9L20, live line | 5.33 Days
Daily |
|
05-Jul-22 08:00 | 08-Jul-22 16:00 | ENMAX | Outage | 22.3TR (SS-22) | testing and maintenance | 3.33 Days
Continuous |
|
05-Jul-22 08:00 | 12-Jul-22 16:00 | ENMAX | Outage | 13.1TR (SS-13) | bushing replacement, testing and maintenance | 7.33 Days
Continuous |
|
05-Jul-22 08:00 | 08-Jul-22 17:00 | ALTALINK | TE | 602s RTU/SCADA (602s Cold Creek) | configuration update for time domain pilot project | 3.38 Days
Daily |
|
05-Jul-22 08:00 | 08-Jul-22 17:00 | ALTALINK | TE | 345s RTU/SCADA (345s Hornbeck) | configuration update for time domain pilot project | 3.38 Days
Daily |
|
05-Jul-22 08:00 | 09-Jul-22 18:00 | SUNCOR | Outage | 29PL7-1 (29EDD-34 - 29EDD-85), 29EDD-85 752-10020 (29EDD-85), 29EDD-85 752-10040 (29EDD-85) | 29PT-0426C oil top up | 4.42 Days
Continuous |
|
06-Jul-22 07:00 | 07-Jul-22 17:00 | SUNCOR | TE | 964AL (1024s Granlea - 964L tap) | relay testing | 1.42 Days
Daily |
|
06-Jul-22 07:00 | 09-Jul-22 17:00 | SUNCOR | TE | 1024s Granlea | change RAS relay settings and complete end-to-end testing | 3.42 Days
Daily |
|
06-Jul-22 07:00 | 07-Jul-22 17:00 | SUNCOR | TE | 1024s RTU/SCADA (1024s Granlea) | download new configuration | 1.42 Days
Daily |
|
06-Jul-22 09:00 | 08-Jul-22 17:30 | ATCO | Outage | 848s 913 (848s Ruth Lake) | breaker maintenance | 2.35 Days
Continuous |
|
06-Jul-22 09:00 | 07-Jul-22 16:00 | ATCO | TE | 743s RTU/SCADA (743s Sarah Lake) | upgrade RTU configuration | 31 Hours
Continuous |
|
07-Jul-22 07:00 | 07-Jul-22 17:30 | ALTALINK | TE | 602s Cold Creek | T1 - removing 'B' protection from service to remove the temp. U/V settings permanently | 10.5 Hours
Daily |
|
07-Jul-22 08:00 | 07-Jul-22 16:00 | ENMAX | Outage | 26.81L (SS-26 - SS-32) | HV breaker SF6 gas sample | 8 Hours
Continuous |
|
07-Jul-22 08:00 | 07-Jul-22 16:00 | ATCO | Outage | 6L57 (727s Kinuso - 735s Swan River) | high load move | 8 Hours
Continuous |
|
07-Jul-22 08:30 | 08-Jul-22 17:30 | ATCO | Outage | 769s 602 (769s Stettler), 6L44 (769s Stettler - 778s Big Valley) | breaker bulk oil KSO partial testing | 1.38 Days
Continuous |
|
07-Jul-22 08:30 | 07-Jul-22 13:30 | ALTALINK | TE | 58s RTU/SCADA (58s Edson) | replace failing switch | 5 Hours
Daily |
|
07-Jul-22 09:00 | 08-Jul-22 20:00 | ALTALINK | RB | 777L (48s Pocaterra - 245s Seebe) | set poles and pull stringing rope beside 777L | 1.46 Days
Daily |
|
07-Jul-22 10:00 | 07-Jul-22 16:00 | ATCO | IO | 733s Simonette | 733s 502 25 kV breaker maintenance | 6 Hours
Continuous |
|
08-Jul-22 07:00 | 08-Jul-22 19:00 | ALTALINK | TE | 602s Cold Creek | implement the new protection settings on 745L | 12 Hours
Daily |
|
09-Jul-22 08:00 | 09-Jul-22 18:00 | ENMAX | Outage | 162.4TR (SS-162), 162B138-RB94 (SS-162), 162B138-RB92 (SS-162) | summer substation washing, oil sampling, check reversing switch, fix 162MD138-162.4TR | 10 Hours
Continuous |
|
09-Jul-22 08:00 | 21-Jul-22 17:00 | ALTALINK | IO | APS# 181 610L Overload Mitigation Scheme, 135s Conrad | 135s20 & 135s4670 DER's will be blocking RAS 181 610L overload runback and trip signals | 12.38 Days
Continuous |
|
11-Jul-22 07:00 | 15-Jul-22 17:00 | EPCOR | Outage | 52s T2 (52s East Industrial) | zone op-checks, p&c maintenance | 4.42 Days
Continuous |
|
11-Jul-22 07:00 | 13-Jul-22 18:00 | ALTALINK | RB | 740L (39s Bickerdike - 58s Edson) | replace 1084L OHSW with OPGW over top of 740L. | 2.46 Days
Continuous |
|
11-Jul-22 07:00 | 21-Jul-22 17:00 | EPCOR | Outage | 987s T1 (987s Clover Bar), 987s C2401 (987s Clover Bar), 987s C2403 (987s Clover Bar), 987s CCP7213 (987s Clover Bar), 987s CCP7214 (987s Clover Bar) | zone doble and CDS19/CDS20/CDS24/CDS38 disconnect maintenance | 10.42 Days
Continuous |
|
11-Jul-22 07:00 | 14-Jul-22 17:00 | ALTALINK | TE | 244s Bowmanton | change RAS 164 relay settings and complete end-to-end testing | 3.42 Days
Daily |
|
11-Jul-22 07:00 | 14-Jul-22 17:00 | CapitalPower | TE | 1018s Shamrock | change RAS 164 relay settings and complete end-to-end testing | 3.42 Days
Daily |
|
11-Jul-22 07:30 | 15-Jul-22 17:30 | ALTALINK | RB | 185L (379s Shell Canada Waterton - 396s Pincher Creek) | installing anchors at structure #117 | 4.42 Days
Daily |
|
11-Jul-22 08:00 | 15-Jul-22 14:45 | ATCO | Outage | 2075s ACF22 (2075s Newell), 2075s ACF23 (2075s Newell), 2075s ACF24 (2075s Newell), 2075S 931 (2075s Newell), 2075S 932 (2075s Newell), 2075S 933 (2075s Newell) | yearly inspections of ACF 2 filter banks | 4.28 Days
Continuous |
|
11-Jul-22 08:00 | 11-Jul-22 15:00 | ATCO | RB | 9L20 (755s Cordel - 766s Nevis) | we will be changing all of the conductor spacers on 9L20, liveline | 7 Hours
Continuous |
|
11-Jul-22 08:00 | 15-Jul-22 18:00 | ENMAX | Outage | 39.2TR (SS-39) | ECI bushing / slip over CT replacement, check reversing switch, oil sampling MT, TC. LTC counter replacement | 4.42 Days
Continuous |
|
11-Jul-22 08:00 | 14-Jul-22 17:00 | CapitalPower | TE | 1018s RTU/SCADA (1018s Shamrock) | download new configuration for RAS 168 | 3.38 Days
Daily |
|
11-Jul-22 08:00 | 17-Jul-22 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 5y,10y maintenance on 29PT-334 at 29EDD94 | 6.42 Days
Continuous |
|
11-Jul-22 08:00 | 28-Jul-22 16:00 | ENMAX | Outage | 21.1C (SS-21) | HV breaker maintenance and substation weed spraying [Capacitor Bank]. 21 Sub fencing replacement | 17.33 Days
Continuous |
|
11-Jul-22 08:00 | 11-Jul-22 17:00 | ALTALINK | TE | 370s North Lethbridge | firmware upgrade to relay | 9 Hours
Continuous |
|
11-Jul-22 09:00 | 15-Jul-22 18:00 | ALTALINK | Outage | 514BL (322s Cowley Ridge Windplant - 514L tap), 514L (396s Pincher Creek - 514BL tap) | CRU and fire mitigation on structures #1 - 189 | 4.38 Days
Continuous |
|
11-Jul-22 09:00 | 14-Jul-22 17:30 | ATCO | Outage | 856s 901 (856s Kinosis) | breaker maintenance | 3.35 Days
Continuous |
|
11-Jul-22 09:00 | 15-Jul-22 16:00 | ATCO | Outage | 732s 904 (732s Mitsue) | breaker maintenance | 4.29 Days
Continuous |
|
11-Jul-22 09:00 | 12-Jul-22 17:00 | ALTALINK | TE | 198s RTU/SCADA (198s Blackfalds) | update RTU configuration | 1.33 Days
Continuous |
|
11-Jul-22 09:00 | 12-Jul-22 16:00 | ALTALINK | TE | 198s Blackfalds | 461L and 444L - implement DNP settings changes & testing for fault reporting to SCADA | 31 Hours
Continuous |
|
11-Jul-22 09:00 | 14-Jul-22 17:00 | ALTALINK | IO | APS# 164 1034L and 1035L Contingency Mitigation | installing telecommunication equipment for the B RAS TPR Circuit and finish commissioning of the B RAS Relay | 3.33 Days
Daily |
|
11-Jul-22 09:00 | 12-Jul-22 17:00 | BCH | RB | 1L274 (48s Pocaterra - 978s BCH Britt Creek) | tree removal at Elk Lake provincial park | 1.33 Days
Daily |
|
11-Jul-22 09:30 | 12-Jul-22 17:30 | ATCO | Outage | 7L159 (770s Three Hills - 7L159 tap), 770S 704, 7L159 | BREAKER SF6 LTB145D1/B COMPLETE TESTING 704 | 1.33 Days
Continuous |
|
11-Jul-22 09:30 | 14-Jul-22 16:30 | ALTALINK | IO | 7L224 (A774s-650s) Atco - Advice | 7L224 Cross arm and insulator replacement. | 3.29 Days
Continuous |
|
11-Jul-22 10:00 | 12-Jul-22 17:30 | ATCO | Outage | 775s 604 (775s Sullivan Lake), 775s 604C (775s Sullivan Lake) | SF6 HPL complete testing | 31.5 Hours
Continuous |
|
11-Jul-22 10:00 | 15-Jul-22 15:00 | ATCO | Outage | 706s 705 (706s Irish Creek), 706s 705C (706s Irish Creek) | relay testing, aux relay testing, trip coil testing | 4.21 Days
Daily |
|
11-Jul-22 10:00 | 14-Jul-22 16:00 | ATCO | Outage | 7L224 (650s Hansman Lake - 774s Monitor) | crossarm and insulator replacement project | 3.25 Days
Continuous |
|
11-Jul-22 10:00 | 15-Jul-22 15:00 | ATCO | TE | 706s Irish Creek | PRC005 testing | 4.21 Days
Daily |
|
11-Jul-22 10:00 | 11-Jul-22 16:00 | ATCO | Outage | 754S 754-502, 754S 502 | breaker HV tank heater repair | 6 Hours
Continuous |
|
11-Jul-22 10:00 | 11-Jul-22 16:00 | ATCO | RB | 754s 701T (754s Ksituan River), 7L68 (730s Rycroft - 811s Clairmont Lake), 7L10 (754s Ksituan River - 7LA10 tap), 7L10 (730s Rycroft - 7LA10 tap) | HOP to open J1, Hop on 7L68 as it is currently tied to 7L10 | 6 Hours
Continuous |
|
11-Jul-22 10:00 | 15-Jul-22 10:00 | ATCO | Outage | 754S 701TCS, 754S 701T, 754s 701T (754s Ksituan River) | 701TCS Maintenance, Hot line crew will cut in jumper J1 to work under HOP 2-65626, | 4 Days
Continuous |
|
11-Jul-22 10:00 | 28-Jul-22 16:00 | ENMAX | TE | SS-21 | 21PT138-Z31 PT outage, 21 sub fencing replacement. 21s DFR offline while PT is out of service | 17.25 Days
Continuous |
|
11-Jul-22 10:00 | 11-Jul-22 18:00 | ALTALINK | Outage | 837L (538s Buford - 964s Pigeon Lake) | *P5* urgent repair @ 837L152 & 182 | 8 Hours
Daily |
|
11-Jul-22 10:30 | 15-Jul-22 17:30 | ALTALINK | Outage | 608L (418s Ardenville - 608L Tap), 603L (138s Windy Flats - 243s Soderglen), 138s T2 (138s Windy Flats) | maintenance, doble, leak repair, bushing and monitor repair | 4.29 Days
Daily |
|
11-Jul-22 11:30 | 15-Jul-22 17:30 | ALTALINK | RB | 730L (197s Bardo - 732L tap), 730L (285s East Camrose - 732L tap), 732L (299s Kingman - 732AL tap), 732AL (301s Queensland - 732L tap), 732L (730L tap - 732AL tap) | required for temp bypass and 730L switch replacements - Hot Line Work | 4.25 Days
Daily |
|
11-Jul-22 12:00 | 28-Jul-22 18:00 | ALTALINK | Outage | 71s T1 (71s Lamoureux) | replace the 240kV and 138kV bushings on T1, maintenance work (leak repair, bird cleanup) | 17.25 Days
Continuous |
|
11-Jul-22 13:30 | 11-Jul-22 17:00 | ALTALINK | TE | 77s Sagitawah | 798L - gather relay data | 3.5 Hours
Daily |
|
12-Jul-22 07:30 | 12-Jul-22 09:30 | ALTALINK | Outage | 523s C1 (523s Bullshead), 523s 33 (523s Bullshead) | weed spraying | 2 Hours
Daily |
|
12-Jul-22 08:00 | 16-Jul-22 17:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 635PL6-1003 | 4.38 Days
Continuous |
|
12-Jul-22 08:00 | 12-Jul-22 16:00 | ALTALINK | TE | AltaLink Radio Tower | upgrade radio software | 8 Hours
Daily |
|
12-Jul-22 08:00 | 13-Jul-22 16:30 | ALTALINK | Outage | 167s T2 (167s Ipiatik Lake) | maintain, doble, fix fiber conduit | 1.35 Days
Continuous |
|
12-Jul-22 08:00 | 14-Jul-22 11:30 | ATCO | IO | 789L | AltaLink request - ATCO to close N.O. 898S 704A for their work at 167S | 2.15 Days
Continuous |
|
12-Jul-22 08:00 | 22-Jul-22 20:00 | Syncrude | TE | D05 D05 | install upgraded data concentrator D200 and bay controller D25 | 10.5 Days
Continuous |
|
12-Jul-22 08:00 | 12-Jul-22 16:00 | ALTALINK | Outage | 368s 15 (368s Burdett) | 25 kV breaker - connect new cables into the cubicle 2B0254U | 8 Hours
Daily |
|
12-Jul-22 08:00 | 15-Jul-22 16:00 | ENMAX | Outage | 36.1TR (SS-36) | maintenance and testing | 3.33 Days
Continuous |
|
12-Jul-22 08:00 | 12-Jul-22 16:00 | ENMAX | Outage | 14.1C (SS-14), 14.2C (SS-14) | HV breaker maintenance, substation weed spraying | 8 Hours
Continuous |
|
12-Jul-22 09:00 | 12-Jul-22 17:00 | ALTALINK | TE | 77s RTU/SCADA (77s Sagitawah) | update configuration files for RTU A and RTU B | 8 Hours
Daily |
|
12-Jul-22 09:00 | 12-Jul-22 16:00 | ALTALINK | Outage | 575s 138kV Bus 1 (575s Sundre), 719L (378s Shell Caroline - 575s Sundre), 575s T1 (575s Sundre), 575s 719N (575s Sundre) | urgent repair: 575s27 needs repair | 7 Hours
Daily |
|
12-Jul-22 10:00 | 13-Jul-22 17:30 | CapitalPower, ATCO, ALTALINK | TE | 804s Wintering Hills, 766s Nevis, 615s Halkirk, 526s Buffalo Creek | RAS relay testing between 801s and 981s
|
31.5 Hours
Continuous |
|
12-Jul-22 10:30 | 12-Jul-22 12:30 | ALTALINK | Outage | 498s C1 (498s Tilley), 498s 33 (498s Tilley) | weed spraying | 2 Hours
Daily |
|
13-Jul-22 07:00 | 13-Jul-22 17:00 | ALTALINK | IO | I-1018s T2 & 240CB2 - Info | Trip testing I-1018s 240CB2 for the newly installed RAS Relays @ 244s & 251s on 983L Issue to: Lander Marr Contact #: 403-700-4120 | 10 Hours
Daily |
|
13-Jul-22 08:00 | 13-Jul-22 18:00 | ALTALINK | TE | 388s Riverside | upgrade MPLS node | 10 Hours
Daily |
|
13-Jul-22 08:00 | 13-Jul-22 18:00 | ALTALINK | TE | 233s RTU/SCADA (233s Beamer) | upgrade MPLS node | 10 Hours
Daily |
|
13-Jul-22 08:00 | 13-Jul-22 16:00 | ALTALINK | IO | 122s Site - Info | Tech to perform Q2 site inspection | 8 Hours
Daily |
|
13-Jul-22 08:00 | 13-Jul-22 11:00 | ALTALINK | Outage | 74s C1 (74s Janet), 74s C2 (74s Janet) | weed spraying | 3 Hours
Daily |
|
13-Jul-22 08:00 | 14-Jul-22 17:00 | ALTALINK | TE | 262s Rocky Mountain House | update RTU configuration | 1.38 Days
Continuous |
|
13-Jul-22 08:00 | 14-Jul-22 16:00 | ALTALINK | TE | 262s Rocky Mountain House | 870l and 717L - implement DNP settings changes & testing for fault reporting to SCADA | 1.33 Days
Daily |
|
13-Jul-22 08:00 | 13-Jul-22 17:00 | ALTALINK, ATCO | TE | 807L (233s Beamer - 807AL tap), 807L (410s Josephburg - 807AL tap), 807AL (402s Scotford Expansion One - 807L tap) | support MPLS upgrades at 233s | 9 Hours
Daily |
|
13-Jul-22 08:00 | 13-Jul-22 17:00 | ALTALINK | TE | 708L (233s Beamer - 708AL Tap), 708L (71s Lamoureux - 708AL Tap), 708AL (388s Riverside - 708L Tap) | support MPLS upgrades at 233s and 388s | 9 Hours
Daily |
|
13-Jul-22 08:00 | 15-Jul-22 17:00 | ALTALINK | TE | 575s Sundre | P&C minor protection upgrade | 2.38 Days
Continuous |
|
13-Jul-22 08:00 | 21-Jul-22 16:00 | ENMAX | Outage | 13.2TR (SS-13) | bushing replacement | 8.33 Days
Continuous |
|
13-Jul-22 08:00 | 13-Jul-22 16:00 | ENMAX | Outage | 31.1C (SS-31) | HV breaker maintenance | 8 Hours
Continuous |
|
13-Jul-22 09:00 | 15-Jul-22 17:00 | BCH | Outage | T1 (BCH Natal) | NTL 60B1, T1 disconnect inspections | 2.33 Days
Continuous |
AB-BC |
13-Jul-22 09:00 | 15-Jul-22 17:00 | ALTALINK | IO | NTL T1 BCH - Info | NTL 60B1, T1 Disconnect Inspections. (If loading exceeds T2 limit, BC Hydro may request AESO to adjust Russell phase shifter or open 1L275.) | 2.33 Days
Continuous |
|
13-Jul-22 09:00 | 13-Jul-22 12:00 | ENMAX | TE | 11.83L (SS-162 - SS-11) | upgrade JMUX system to JPAX system | 3 Hours
Continuous |
|
13-Jul-22 10:00 | 13-Jul-22 16:30 | ALTALINK | Outage | 178s C1 (178s Cynthia) | PRC 5 maintenance | 6.5 Hours
Daily |
|
13-Jul-22 11:00 | 13-Jul-22 13:00 | ATCO | TE | ATCO Radio Tower, 705s RTU/SCADA (705s Kitscoty), 751s RTU/SCADA (751s Hill), 880s Briker RTU/SCADA | 7705 SAR v2 chassis upgrade | 2 Hours
Continuous |
|
13-Jul-22 11:01 | 13-Jul-22 13:00 | ALTALINK | Outage | 74s C3 (74s Janet), 74s C4 (74s Janet), 74s 102 (74s Janet), 74s 103 (74s Janet) | vegetation management | 119 Mins
Daily |
|
13-Jul-22 12:00 | 13-Jul-22 15:00 | ENMAX | TE | 39.82L (SS-39 - SS-162) | upgrade JMUX system to JPAX system | 3 Hours
Continuous |
|
13-Jul-22 14:00 | 13-Jul-22 16:00 | ALTALINK | Outage | 151s C1 (151s Strathmore) | weed spraying | 2 Hours
Daily |
|
13-Jul-22 23:30 | 14-Jul-22 06:30 | ALTALINK | Outage | 294s T2 (294s Brazeau Outlet Works) | T2 fix leaks SFRA, doble, VR2 fix leaks | 7 Hours
Continuous |
|
14-Jul-22 07:00 | 14-Jul-22 19:00 | ALTALINK | TE | 526s RTU/SCADA (526s Buffalo Creek) | update RTU and HMI to add new alarms / inputs from new protection and equipment | 12 Hours
Daily |
|
14-Jul-22 08:00 | 14-Jul-22 16:00 | ENMAX | Outage | 65B138-D82 (SS-65) | breaker maintenance | 8 Hours
Continuous |
|
14-Jul-22 08:00 | 14-Jul-22 11:30 | ALTALINK | Outage | 167s 2052 (167s Ipiatik Lake), 428L (167s Ipiatik Lake - 818s Winefred) | fix tank heater | 3.5 Hours
Daily |
|
14-Jul-22 09:00 | 15-Jul-22 15:30 | ATCO | Outage | 7L167, 7L167 (989s Quigley - 2060s Engstrom) | Tap up mobile sub 2000s to 7L167s @989s | 30.5 Hours
Continuous |
|
14-Jul-22 09:00 | 14-Jul-22 12:00 | ALTALINK | IO | 365s Canadianoxy Astotin Creek | scope out site for 365sT1 work | 3 Hours
Daily |
|
14-Jul-22 09:00 | 26-Jul-22 15:30 | ATCO | TE | 2060s Engstrom | temp relay settings changes | 12.27 Days
Continuous |
|
14-Jul-22 09:00 | 26-Jul-22 15:30 | ATCO | TE | 989s Quigley | temp relay settings changes | 12.27 Days
Continuous |
|
14-Jul-22 10:00 | 15-Jul-22 17:00 | ATCO | Outage | 7L85, 7L85 (803s ATC Bullpound - 804s Wintering Hills) | Install whips on 7L85D2 & 7L85D3 | 31 Hours
Continuous |
|
15-Jul-22 07:00 | 22-Jul-22 17:00 | EPCOR | Outage | Meadowlark S/S PASS Switchgear Isolation, 72MG16 (Garneau - Meadowlark), PMDS13 (Poundmaker) | Outage required to address installation deficiencies | 7.42 Days
Continuous |
|
15-Jul-22 07:00 | 18-Jul-22 18:00 | ALTALINK | Outage | 792L (92s-191s) - GOI, 792L (92s Viscount - 191s N.W. Cardiff) | Line move at structures 102-104 to accommodate road re-route, Phasing checks will be required at 92s5 during return to service switching | 3.46 Days
Continuous |
|
15-Jul-22 08:00 | 28-Jul-22 18:00 | SUNCOR | Outage | 29PL9-5/29PL9-6, 29PL9-5 (29EDD-1 Millennium - 29EDD-34), 29PL9-6 (29EDD-1 Millennium - 29EDD-34) | Relay settings update will be done sequentially one after the other | 13.42 Days
Continuous |
|
15-Jul-22 08:00 | 18-Jul-22 20:00 | SUNCOR | Outage | 635PL7-1002 (635EDD-1000 - 635EDD-1004) | support construction activity in the area | 3.5 Days
Continuous |
|
15-Jul-22 10:00 | 15-Jul-22 16:00 | ATCO | RB | 754S 701TCS, 754S 144kV Bus Protection, 7L68 | HOP to close J1, Hop on 7L68 as it is currently tied to 7L10 | 6 Hours
Continuous |
|
15-Jul-22 10:00 | 15-Jul-22 17:30 | ATCO | TE | 775s RTU/SCADA (775s Sullivan Lake) | SMP configuration update | 7.5 Hours
Continuous |
This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein. © 2009 Alberta Electric System Operator. All rights reserved |