Alberta Electric System Operator | |
System Co-ordination Plan | |
2021-08-12 to 2021-08-20 | |
Approved Outages |
Previous Version | |
Download CSV |
From | To | Owner | Type | Element | Scheduled Activity | Date/Time Comments | Interconnection |
---|---|---|---|---|---|---|---|
05-Oct-18 08:00 | 31-Dec-21 16:00 | EPCOR | IO | C2 (Rossdale) | forced outage | Continuous |
1,183.38 Days
|
24-Oct-18 01:13 | 31-Dec-21 16:00 | EPCOR | IO | C1 (Rossdale) | forced outage | 1,164.66 Days
Continuous |
|
01-Nov-20 08:00 | 30-Sep-21 16:00 | ATCO | TE | 7L33 (749s Flyingshot Lake - 845s Big Mountain) | problems with permissive signals | 333.29 Days
Continuous |
|
01-Jan-21 08:00 | 31-Dec-21 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 30EDD-200, 29EDD-106, 29EDD-141, 29EDD-192 | 364.42 Days
Daily |
|
01-Jan-21 08:00 | 01-Jan-22 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 30EDD-200 | 365.42 Days
Daily |
|
01-Jan-21 08:00 | 11-Jan-22 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 30EDD-200 | 375.42 Days
Continuous |
|
01-Jan-21 08:00 | 04-Jan-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 30EDD-200 | 733.42 Days
Continuous |
|
02-Jan-21 08:00 | 05-Jan-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-181
|
733.42 Days
Continuous |
|
05-Jan-21 08:00 | 01-Jun-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29PT-69
|
877.38 Days
Continuous |
|
24-Jan-21 08:00 | 07-Jan-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-161
|
713.42 Days
Continuous |
|
02-Feb-21 08:00 | 10-Jan-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-221
|
707.42 Days
Continuous |
|
03-Feb-21 13:00 | 01-Sep-21 18:00 | ATCO | IO | 757s 703 (757s Battle River) | removing CT to replace damaged one on breaker 704 | 210.17 Days
Continuous |
|
10-Feb-21 09:00 | 15-Sep-21 15:00 | ATCO | TE | 886s 701T (886s Updike) | real time protection outage fixing issue that has already failed - 701T temp protection out of service, back up in service | 217.21 Days
Continuous |
|
24-Feb-21 08:00 | 11-Jan-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-211; substation ground test; PM 5y - 34.5kV | 686.42 Days
Continuous |
|
01-Mar-21 08:00 | 03-Feb-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-221 ;29PT-605 system | 704.42 Days
Continuous |
|
01-Mar-21 08:00 | 04-Feb-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-161; 29PT-582 system | 705.42 Days
Daily |
|
01-Mar-21 08:00 | 05-Feb-23 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 29EDD-171; 29PT-600 system | 706.42 Days
Daily |
|
23-Mar-21 17:01 | 30-Aug-21 06:59 | EPCOR | Outage | T2 (Strathcona) | Strathcona TX2 replacement - 1007218 | 159.58 Days
Continuous |
|
26-Apr-21 09:00 | 30-Nov-21 17:00 | ATCO | TE | 809s Louise Creek RTU/SCADA | RTU replacement | 218.38 Days
Continuous |
|
26-Apr-21 13:30 | 30-Nov-21 13:30 | ATCO | TE | 809s Louise Creek RTU/SCADA | RTU replacement | 218.04 Days
Continuous |
|
29-Apr-21 20:00 | 29-Oct-21 18:00 | ENBRIDGE | TE | 120s MATL PST (120s Picture Butte) | failed "B" protection relay | 182.92 Days
Continuous |
|
19-May-21 08:00 | 18-Aug-21 16:00 | ALTALINK | Outage | 906s T1 (906s Ross Creek) | forced outage | 91.33 Days
Continuous |
|
19-May-21 09:00 | 30-Sep-21 12:00 | ALTALINK | Outage | 58s C1 (58s Edson) | install new protections | 134.13 Days
Continuous |
|
20-May-21 09:00 | 19-Aug-21 15:00 | REDDEER | Outage | 217s T1 (217s North Red Deer) | power transformer replacement (like-for-like) | 91.25 Days
Continuous |
|
20-May-21 09:00 | 19-Aug-21 15:00 | ALTALINK | IO | 217s T1 for CofRD - Info | power transformer replacement | 91.25 Days
Continuous |
|
24-May-21 07:00 | 30-Sep-21 17:00 | EPCOR | TE | 805S Jasper | system being upgraded and tested to accommodate future upgrade to ADMS system | 129.42 Days
Daily |
|
07-Jun-21 07:00 | 03-Sep-21 17:00 | EPCOR | TE | RTU/SCADA (Namao) | upgrade and test station SA system to accommodate future upgrade to ADMS system | 88.42 Days
Daily |
|
18-Jun-21 08:00 | 27-Aug-21 08:00 | ALTALINK | Outage | 426S Coalspur, 740L (426s Coalspur - 740L tap) | add new 426s740 138 kV breaker, maintenance | 70 Days
Continuous |
|
12-Jul-21 07:00 | 13-Sep-21 17:00 | EPCOR | TE | Meadowlark, RTU/SCADA (Meadowlark) | station SA system being upgraded | 63.42 Days
Daily |
|
12-Jul-21 08:00 | 13-Dec-21 16:00 | ATCO | TE | 809S Louise Creek | Louise Creek sub rebuild project -
installation, wiring and commissioning of new BF relays in subsequent outages |
154.38 Days
Continuous |
|
13-Jul-21 07:30 | 22-Aug-21 17:30 | ALTALINK | IO | 9L938 (77s-A809s) Advice - ATCO | Louise Creek rebuild project- replace 912, 900PT1, CT modifications to 906CT, 912CT, and 901T | 40.42 Days
Continuous |
|
13-Jul-21 17:01 | 22-Aug-21 17:00 | ATCO | Outage | 9L938 (77s Sagitawah - 809s Louise Creek), 809s 901T (809s Louise Creek), 809s 503R (809s Louise Creek), 809s 504R (809s Louise Creek) | Louise Creek rebuild project | 40 Days
Continuous |
|
19-Jul-21 07:00 | 31-Aug-21 17:00 | EPCOR | TE | 657S Summerside | protection work | 43.42 Days
Daily |
|
22-Jul-21 12:54 | 03-Sep-21 16:54 | ATCO | TE | 2075s RTU/SCADA (2075s Newell), 2029s RTU/SCADA (2029s Heathfield) | reset counter on DC filter protection to clear minor alarm | 43.17 Days
Continuous |
|
25-Jul-21 08:00 | 27-Aug-21 16:00 | ENMAX | Outage | 15.1TR (ENMAX 15) | install new Albarrie, plastibeton, duct banks and cables, phasing required on return | 33.33 Days
Continuous |
|
31-Jul-21 08:00 | 12-Aug-21 17:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | 635PL6-1001 | 12.38 Days
Daily |
|
03-Aug-21 07:00 | 13-Aug-21 17:00 | EPCOR | Outage | 330P GT2 (330p Genesee), 330p 1204 (330p Genesee) | maintenance | 10.42 Days
Continuous |
|
03-Aug-21 08:00 | 15-Aug-21 16:00 | ENMAX | Outage | 8.1TR (ENMAX 8), 8.2TR (ENMAX 8) | GIS switch maintenance and testing | 12.33 Days
Continuous |
|
03-Aug-21 17:01 | 07-Dec-21 17:00 | EPCOR | Outage | T1 (EPCOR Hardisty) | Hardisty T1 replacement | 126.04 Days
Continuous |
|
04-Aug-21 08:00 | 14-Aug-21 18:00 | SUNCOR, ATCO | Outage | 29EDD-1 72kV South Bus (29EDD-1 Millennium), 29EDD-1 260kV South Bus 1 (29EDD-1 Millennium), 29EDD-1 260kV South Bus 2 (29EDD-1 Millennium), 29EDD-1 29EDD1s1052 (29EDD-1 Millennium), 29EDD-1 29EDD1S1452 (29EDD-1 Millennium), 29EDD-1 29EDD1s1852 (29EDD-1 Millennium), 29EDD-1 29EDD1s352 (29EDD-1 Millennium), 29EDD-1 29EDD1s652 (29EDD-1 Millennium), 29PL9-2 (29EDD-1 Millennium - 848s Ruth Lake), 29EDD-1 952-103 (29EDD-1 Millennium), 29EDD-1 952-106 (29EDD-1 Millennium) | preventative maintenance | 10.42 Days
Continuous |
|
05-Aug-21 07:00 | 15-Aug-21 18:00 | EPCOR | RB | 1058L (657s Summerside - EP 803s Lambton) | proximity to 908L work | 10.46 Days
Continuous |
|
05-Aug-21 07:00 | 15-Aug-21 18:00 | ALTALINK | RB | 946L (38s East Edmonton - 89s Ellerslie) | proximity to 908L work | 10.46 Days
Continuous |
|
05-Aug-21 07:00 | 15-Aug-21 18:00 | ALTALINK, EPCOR | Outage | 908L (38s East Edmonton - 89s Ellerslie), 908AL (52S East Industrial - 908L tap) | replace damaged insulation, jumper strings | 10.46 Days
Continuous |
|
05-Aug-21 07:00 | 15-Aug-21 17:00 | EPCOR | IO | ALTALINK - 908L - GOI @ EAST INDUSTRIAL | repair sub bundle, broken inner core between 908L234 and 242, replace all damaged dead end insulation and jumper strings 908L234, repair mid-span OHSW tie 908L249, replace all dead-end insulation to 25 KIP NGK | 10.42 Days
Continuous |
|
05-Aug-21 07:00 | 15-Aug-21 17:00 | EPCOR | RB | 1058L (657s Summerside - EP 803s Lambton) | repair work | 10.42 Days
Continuous |
|
05-Aug-21 07:00 | 15-Aug-21 18:00 | ALTALINK, EPCOR | RB | 1057L (89s Ellerslie - 657s Summerside) | proximity to 908L work | 10.46 Days
Continuous |
|
07-Aug-21 08:00 | 18-Aug-21 18:00 | SUNCOR | Outage | 29PL6-22 (29EDD-1 Millennium - 29EDD-2 Tar Island) | replacement of A/B protection upgrade | 11.42 Days
Continuous |
|
08-Aug-21 08:00 | 13-Aug-21 18:00 | SUNCOR | Outage | 29PT-101 (29EDD-18) | turn around maintenance testing of high voltage & low voltage distribution equipment | 5.42 Days
Continuous |
|
08-Aug-21 11:00 | 15-Aug-21 17:00 | ATCO, SUNCOR | Outage | 29PL9-2 (29EDD-1 Millennium - 848s Ruth Lake) | maintenance activities at Suncor base plant
|
7.25 Days
Continuous |
|
09-Aug-21 07:00 | 13-Aug-21 17:00 | EPCOR | Outage | 330p 805 (330p Genesee), 330P 12TC1 (330p Genesee) | breaker maintenance and CT doble | 4.42 Days
Continuous |
|
09-Aug-21 07:00 | 20-Aug-21 18:00 | ALTALINK | Outage | 276s T3 (276s Union Carbide Prentiss), 775L (276s Prentiss - 535s Joffre), 276s 138kV South Bus (276s Union Carbide Prentiss) | maintenance, doble and oil reclaim, protection installation and testing | 11.46 Days
Continuous |
|
09-Aug-21 07:00 | 27-Aug-21 17:00 | ALTALINK | TE | 426s RTU/SCADA (426s Coalspur) | update RTU/HMI configuration | 18.42 Days
Daily |
|
09-Aug-21 07:00 | 14-Aug-21 17:00 | EPCOR | Outage | 330P 12TC1 (330p Genesee), 330P Genesee 500 kV Bus 1, 330p 1201 (330p Genesee), 330p 1204 (330p Genesee), 330p 1207 (330p Genesee) | emergency lightning spire repair
|
5.42 Days
Continuous |
|
09-Aug-21 07:30 | 27-Aug-21 16:30 | ALTALINK | IO | 42s91 Advice (7.82L ) Advice for Enmax | line relocation at Bow Trail, phasing required, Enmax needs advise on 42s91 | 18.38 Days
Continuous |
|
09-Aug-21 08:00 | 20-Aug-21 17:30 | ATCO | Outage | 2075s 900SST1 (2075s Newell) | install breaker thermal windows in LV1 room at 2075S Newell and 900SST1 gasket replacements | 11.4 Days
Continuous |
|
09-Aug-21 08:00 | 13-Aug-21 17:30 | ALTALINK | TE | 42s RTU/SCADA (42s Sarcee) | update configuration | 4.4 Days
Daily |
|
09-Aug-21 08:00 | 16-Aug-21 17:00 | ALTALINK | TE | 276s RTU/SCADA (276s Union Carbide Prentiss) | configuration file updates - SCADA commissioning and function testing | 7.38 Days
Continuous |
|
09-Aug-21 08:00 | 12-Aug-21 17:00 | ATCO | Outage | 771S 701T | 701T maintenance | 3.38 Days
Continuous |
|
09-Aug-21 08:00 | 13-Aug-21 12:00 | ALTALINK | Outage | 233s T1 (233s Beamer) | NGR maintenance and breaker replacement (233s21) | 4.17 Days
Continuous |
|
09-Aug-21 08:00 | 13-Aug-21 17:00 | ATCO | RB | 9L950 (132s Ware Junction - 801s Anderson) | pole change | 4.38 Days
Continuous |
|
09-Aug-21 08:00 | 17-Aug-21 17:00 | ATCO | Outage | 7L84 (722s Crystal Lake - 749s Flyingshot Lake) | modifications to structures 14,59,128, & 129, switch replacement 702A & 7L84D1 | 8.38 Days
Continuous |
|
09-Aug-21 08:00 | 13-Aug-21 17:00 | ALTALINK | RB | 950L (132s Ware Junction - 801s Anderson) | pole change on 950l/9L950 | 4.38 Days
Daily |
|
09-Aug-21 08:00 | 19-Aug-21 17:00 | ALTALINK | IO | A732s 240KV Breakers - Atco Info | ATCO performing 732s breaker maintenance on 901, 903, 904 | 10.38 Days
Continuous |
|
09-Aug-21 08:00 | 20-Aug-21 16:00 | ENMAX | Outage | 21.1TR (ENMAX 21) | 21sub TRV project- 21.1TR CT replacement | 11.33 Days
Continuous |
|
09-Aug-21 08:00 | 27-Aug-21 16:00 | ENMAX, ALTALINK | Outage | 7.82L (42s Sarcee - ENMAX 7) | line relocation | 18.33 Days
Continuous |
|
09-Aug-21 08:00 | 12-Aug-21 16:00 | ENMAX | Outage | 13.2TR (ENMAX 13) | ECI bushings power factor test transformer, check reversing switch, oil sampling MT, TC | 3.33 Days
Continuous |
|
09-Aug-21 08:00 | 18-Aug-21 17:00 | ALTALINK | TE | 121s RTU/SCADA (121s Brooks) | add and commission new RTU/HMI alarms | 9.38 Days
Continuous |
|
09-Aug-21 08:00 | 19-Aug-21 18:00 | ALTALINK | TE | 104s RTU/SCADA (104s Watson Creek), 602s RTU/SCADA (602s Cold Creek) | repair failed communication between 104s and 602s (currently failed) | 10.42 Days
Continuous |
|
09-Aug-21 08:30 | 13-Aug-21 17:30 | ALTALINK | RB | 995L (17s Benalto - 995AL tap), 995L (62s Brazeau - 995AL tap), 995AL (68s Willesden Green - 995L tap) | line clearance mitagation (strs 9 - 203) | 4.38 Days
Daily |
|
09-Aug-21 08:30 | 13-Aug-21 16:30 | ATCO | TE | 826S Marguerite Lake | repair 826S 903PT cable | 4.33 Days
Continuous |
|
09-Aug-21 09:00 | 13-Aug-21 16:00 | ATCO | Outage | 865s 701T (865s Saddlehills) | maintenance, mobile sub installation | 4.29 Days
Continuous |
|
09-Aug-21 09:00 | 13-Aug-21 18:00 | ATCO | IO | 199L | AltaLink outage -199L (268s - 199L187C) – GOI component replacements 199L (str's range 191-413)
|
4.38 Days
Continuous |
|
09-Aug-21 09:30 | 12-Aug-21 16:30 | ALTALINK | Outage | 42s T2 (42s Sarcee) | migrate and commission T1 | 3.29 Days
Continuous |
|
09-Aug-21 10:00 | 12-Aug-21 16:00 | ALTALINK | TE | 526s RTU/SCADA (526s Buffalo Creek) | update RTU and HMI to add new alarms/ inputs from new protection and equipment | 3.25 Days
Daily |
|
09-Aug-21 10:00 | 12-Aug-21 16:00 | ALTALINK | Outage | 526s T1 (526s Buffalo Creek) | wiring new CT circuit to new protection and installing 25kV PT on 336L | 3.25 Days
Daily |
|
09-Aug-21 10:00 | 12-Aug-21 18:00 | ALTALINK | Outage | 434s T3 (434s East Stony Plain) | replace bushings, repair hot spot on 434s27 | 3.33 Days
Continuous |
|
09-Aug-21 10:30 | 12-Aug-21 18:00 | ALTALINK | Outage | 308s T1 (308s Albchem Beaverhill Creek), 773L (127s Bruderheim - 308s Albchem Beaverhill Creek), 776L (308s Albchem Beaverhill Creek - 410s Josephburg) | vacuum fill T1, maintain 138kV switches 308s6, 308s7, 308s1, 308s2 | 3.31 Days
Continuous |
|
09-Aug-21 11:30 | 12-Aug-21 17:30 | ALTALINK | Outage | 385s T3 (385s Spring Coulee) | bushing, 25kV breaker replacement | 3.25 Days
Continuous |
|
09-Aug-21 12:00 | 13-Aug-21 18:00 | ALTALINK | Outage | 199L (268s Whitecourt - 199AL tap), 268s 199N (268s Whitecourt) | component replacement 199L (str's range 191-413) | 4.25 Days
Continuous |
|
09-Aug-21 12:00 | 20-Aug-21 12:00 | ALTALINK | TE | 535S Joffre | relay isolation | 11 Days
Continuous |
|
10-Aug-21 07:00 | 13-Aug-21 18:00 | ALTALINK | Outage | 900L (17s Benalto - 63s Red Deer) | phase raiser installation on 900L2 | 3.46 Days
Continuous |
|
10-Aug-21 07:30 | 13-Aug-21 17:30 | ALTALINK | RB | 722L (107s Westfield - 368s Burdett) | arms and insulator replacements (str 5 - 11) | 3.42 Days
Daily |
|
10-Aug-21 07:55 | 13-Aug-21 17:05 | ALTALINK | RB | 1081L (17s Benalto - 281s Johnson) | phase raiser installation on 900L2 | 3.38 Days
Daily |
|
10-Aug-21 07:55 | 13-Aug-21 17:05 | ALTALINK | RB | 1325L (510s Sunnybrook - AML 511s Crossings) | phase raiser installation on 900L2 | 3.38 Days
Daily |
|
10-Aug-21 07:55 | 13-Aug-21 18:05 | ALTALINK | RB | 848L (17s Benalto - 848AL tap), 848L (378s Shell Caroline - 848AL tap), 848AL (531s Shell Schrader Creek - 848L tap) | phase raiser installation on 900L2 | 3.42 Days
Daily |
|
10-Aug-21 08:00 | 24-Aug-21 18:00 | SUNCOR | Outage | 29PT-204 (29EDD-18), 29PS-204 (29EDD-18) | maintenance | 14.42 Days
Continuous |
|
10-Aug-21 08:00 | 16-Aug-21 17:00 | ATCO | RB | 7L33 (749s Flyingshot Lake - 845s Big Mountain) | mitigation of structure 13 | 6.38 Days
Continuous |
|
10-Aug-21 09:00 | 13-Aug-21 12:00 | ATCO | TE | 7L91 (715s Leming Lake - 826s Marguerite Lake) | complete a setting change to repair deficiency | 3.13 Days
Continuous |
|
10-Aug-21 09:00 | 13-Aug-21 12:00 | ATCO | TE | 7L89 (721s La Corey - 826s Marguerite Lake) | complete a setting change to repair deficiency | 3.13 Days
Continuous |
|
10-Aug-21 09:00 | 13-Aug-21 12:00 | ATCO | TE | 7L587 (822s Wolf Lake - 826s Marguerite Lake) | complete a setting change to repair deficiency | 3.13 Days
Continuous |
|
10-Aug-21 09:00 | 13-Aug-21 12:00 | ATCO | TE | 9L36 (825s Whitefish Lake - 826s Marguerite Lake) | complete a setting change to repair deficiency | 3.13 Days
Continuous |
|
10-Aug-21 09:00 | 13-Aug-21 12:00 | ATCO | TE | 9L37 (825s Whitefish Lake - 826s Marguerite Lake) | complete a setting change to repair deficiency | 3.13 Days
Continuous |
|
11-Aug-21 08:00 | 12-Aug-21 16:00 | ENMAX | Outage | 34.1TR (ENMAX 34) | tapchanger inspection, check reversing switch | 1.33 Days
Continuous |
|
12-Aug-21 07:00 | 13-Aug-21 18:00 | ALTALINK | Outage | 723L (438s Westlock - 724L tap) | *P5 urgent scope of work includes urgent repair on structures 122C, 122D, 123, 124, 125, 126, 127, 128 and 130 | 1.46 Days
Continuous |
|
12-Aug-21 08:00 | 16-Aug-21 17:00 | ATCO | Outage | 732s 903 (732s Mitsue) | breaker maintenance | 4.38 Days
Continuous |
|
12-Aug-21 08:00 | 13-Aug-21 17:00 | ALTALINK | TE | 525s RTU/SCADA (525s Carseland) | RTU database update | 1.38 Days
Daily |
|
12-Aug-21 08:00 | 13-Aug-21 17:00 | ATCO, SUNCOR | TE | 2005S Secord, 635PL9-1000 (2005s Secord - 635EDD-1000), 635PL9-1001 (2005s Secord - 635EDD-1000) | PRC005 relays and line end to ends | 1.38 Days
Continuous |
|
12-Aug-21 08:00 | 12-Aug-21 16:00 | ALTALINK | TE | AltaLink Radio Tower, AltaLink TPR Outage | 9470R - maintain TPR shelf | 8 Hours
Daily |
|
12-Aug-21 08:00 | 12-Aug-21 20:00 | Syncrude | Outage | ML1 (D05 Syncrude - Syncrude Mildred Lake) | maintenance | 12 Hours
Continuous |
|
12-Aug-21 08:00 | 12-Aug-21 11:30 | ATCO | Outage | 2005s 905 (2005s Secord) | PRC005 trip coil on breaker 905 | 3.5 Hours
Continuous |
|
12-Aug-21 08:30 | 12-Aug-21 17:30 | ALTALINK | Outage | 19s 905 (19s Wabamun), 905L (19s Wabamun - 37s North Calder) | replace grading capacitor on 19s905 240kV breaker | 9 Hours
Daily |
|
12-Aug-21 08:30 | 12-Aug-21 12:30 | ALTALINK | TE | 71S Lamoureux | UR card settings (B138E) - B protection | 4 Hours
Daily |
|
12-Aug-21 09:30 | 12-Aug-21 12:30 | ATCO | TE | 930s Syn Condenser (930s Arcenciel) | PRC-005 - microprocessor relay testing - 59NB/400BS2
|
3 Hours
Continuous |
|
12-Aug-21 11:45 | 12-Aug-21 16:30 | ATCO | Outage | 2005s 906 (2005s Secord) | PRC005 trip coil on breaker 906 | 4.75 Hours
Continuous |
|
12-Aug-21 12:00 | 13-Aug-21 16:00 | ATCO | RB | 7L22 (811s Clairmont Lake - 7L88 tap), 7L22 (790s Poplar Hill - 7L88 tap) | tap down mobile sub at 865s | 28 Hours
Continuous |
|
12-Aug-21 13:00 | 12-Aug-21 17:30 | ALTALINK | TE | 71S Lamoureux | UR card settings (B138W) - B protection | 4.5 Hours
Daily |
|
12-Aug-21 13:00 | 12-Aug-21 15:00 | ATCO | TE | ATCO Radio Tower, ATCO TPR Outage | Dawes substation SAR chassis upgrade | 2 Hours
Continuous |
|
12-Aug-21 13:00 | 12-Aug-21 15:00 | ALTALINK | IO | 9L55/1085L, 7L114 - TPR - Atco Info | Atco has advised they will be upgrading the radio at Stoney Mountain affecting 1085L/9L55 causing slow fault clearing of 24 cycles - Atco reports no stability concerns. 7L114 also impacted with redundant protection. | 2 Hours
Daily |
|
13-Aug-21 08:00 | 13-Aug-21 17:00 | ATCO | RB | 7L28 (717s Ethel Lake - 846s Grand Centre) | 846s maintenance, tap up mobile sub to 7L28 | 9 Hours
Continuous |
|
13-Aug-21 08:00 | 13-Aug-21 16:00 | ALTALINK, ENMAX | Outage | 1109L (ENMAX 25 - ENMAX 65), 25B240-D142 (ENMAX 25), 25B240-D141 (ENMAX 25) | power factor test 25MD240-1109 LA. 25 Sub SW152, SW153 replace switch | 8 Hours
Continuous |
|
13-Aug-21 08:00 | 13-Aug-21 16:00 | ALTALINK | IO | 1109L (c65s - c25s) OOS - Enmax Info | power factor test 25MD240-1109 LA. 25 Sub SW152, SW153, replace switch | 8 Hours
Daily |
|
13-Aug-21 08:00 | 01-Sep-21 18:00 | SUNCOR | Outage | Unmodeled Transmission Facility (Suncor) | replace switches at 29EDD-8 and 29EDD-9 during turn around for 29PL6-24
|
19.42 Days
Continuous |
|
13-Aug-21 10:00 | 13-Aug-21 13:00 | SUNCOR | TE | 29EDD-2 Tar Island | RTU program download | 3 Hours
Continuous |
|
13-Aug-21 12:30 | 17-Aug-21 16:30 | ALTALINK | Outage | 233s T2 (233s Beamer) | customer NGR maintenance and breaker replacement (233s22) | 4.17 Days
Continuous |
|
14-Aug-21 08:00 | 14-Aug-21 16:00 | ENMAX | Outage | 28.2TR (ENMAX 28) | disconnected conservator breather tube | 8 Hours
Continuous |
|
14-Aug-21 09:15 | 14-Aug-21 12:45 | ALTALINK | Outage | 850L (525s Carseland - 678s Okotoks), 525s 850N (525s Carseland) | connect mobile (475s) | 3.5 Hours
Continuous |
|
14-Aug-21 12:46 | 15-Sep-21 10:00 | ALTALINK | Outage | 525s T3 (525s Carseland) | T3 replacement, 25kV work, SCADA upgrade, and salvage 25kV bypass bus/switches (s20,s24,s25) | 31.88 Days
Continuous |
|
15-Aug-21 08:00 | 23-Aug-21 18:00 | SUNCOR | Outage | 29PL7-2 (29EDD-18 - 29EDD-63) | maintenance and testing of 29PT-179 and 30PT-219, 144 kV breakers/switches, GCB and PRC-005 testing | 8.42 Days
Continuous |
|
15-Aug-21 08:00 | 30-Aug-21 18:00 | SUNCOR | Outage | 29EDD-1 72kV North Bus (29EDD-1 Millennium), 29EDD-1 260kV North Bus 1 (29EDD-1 Millennium), 29EDD-1 260kV North Bus 2 (29EDD-1 Millennium), 29EDD-1 T2 (29EDD-1 Millennium), 29EDD-1 29EDD1s1152 (29EDD-1 Millennium), 29EDD-1 29EDD1s152 (29EDD-1 Millennium), 29EDD-1 29EDD1s1552 (29EDD-1 Millennium), 29EDD-1 29EDD1s452 (29EDD-1 Millennium), 29EDD-1 29EDD1s952 (29EDD-1 Millennium) | preventative maintenance | 15.42 Days
Continuous |
|
15-Aug-21 11:00 | 19-Aug-21 15:30 | ALTALINK | Outage | 83s T1 (83s Taber) | replace 138 kV LA’s, TC filter, 25 kV bushings, and 138 kV bushings on T1 | 4.19 Days
Continuous |
|
16-Aug-21 07:00 | 16-Aug-21 17:00 | EPCOR | Outage | 240BA2 (629s Argyll Transfer Station - 814s Bellamy) | doble CT/arrestors | 10 Hours
Continuous |
|
16-Aug-21 07:00 | 20-Aug-21 17:00 | ALTALINK | TE | 285s RTU/SCADA (285s East Camrose) | update configuration to add and test new relays and equipment point for switchgear upgrade | 4.42 Days
Daily |
|
16-Aug-21 07:00 | 20-Aug-21 17:00 | EPCOR | Outage | 330p 1208 (330p Genesee) | emergency lightning spire repair
#9 spire |
4.42 Days
Continuous |
|
16-Aug-21 07:30 | 16-Aug-21 17:30 | ALTALINK | RB | 608L (138s Windy Flats - 418s Ardenville - 528s Blue Trail Wind Farm) | prep work/framing under 608AL for upcoming 608L outage | 10 Hours
Daily |
|
16-Aug-21 07:30 | 27-Aug-21 17:00 | ALTALINK | RB | 225L (225s Magrath - 385s Spring Coulee) | working on underbuilt 25 kV between structure 303a - 341 | 11.4 Days
Daily |
|
16-Aug-21 08:00 | 29-Aug-21 16:00 | ENMAX | Outage | 8.3TR (ENMAX 8), 8.4TR (ENMAX 8) | switch maintenance | 13.33 Days
Continuous |
|
16-Aug-21 08:00 | 19-Aug-21 17:30 | ALTALINK | TE | 42s RTU/SCADA (42s Sarcee) | update RTU configuration | 3.4 Days
Daily |
|
16-Aug-21 08:00 | 20-Aug-21 17:00 | ALTALINK | TE | 525s RTU/SCADA (525s Carseland) | RTU database update | 4.38 Days
Daily |
|
16-Aug-21 08:00 | 20-Aug-21 17:00 | ATCO | RB | 9L59 (801s Anderson - 972s Tinchebray) | pole change | 4.38 Days
Continuous |
|
16-Aug-21 08:00 | 17-Aug-21 16:00 | ENMAX | Outage | 14.3TR (ENMAX 14) | tapchanger inspection, oil sampling MT, TC | 1.33 Days
Continuous |
|
16-Aug-21 08:00 | 19-Aug-21 16:00 | ENMAX | Outage | 3.4TR (ENMAX 3) | testing and maintemance | 3.33 Days
Continuous |
|
16-Aug-21 08:00 | 16-Aug-21 12:00 | ALTALINK | TE | 648S Metiskow | 749L - change settings for the ongoing work @ 267s | 4 Hours
Continuous |
|
16-Aug-21 08:30 | 18-Aug-21 16:30 | ATCO | Outage | 848s 908 (848s Ruth Lake) | maintenance | 2.33 Days
Continuous |
|
16-Aug-21 09:00 | 27-Aug-21 17:00 | ATCO | Outage | 770s 703T (770s Three Hills) | maintenance | 11.33 Days
Continuous |
|
16-Aug-21 09:00 | 02-Sep-21 16:00 | ALTALINK | TE | 267s RTU/SCADA (267s Killarney Lake) | updating/commissioning C1/C2/C3 SCADA following protection and breaker replacement | 17.29 Days
Daily |
|
16-Aug-21 09:30 | 20-Aug-21 17:30 | ALTALINK | RB | 995L (62s Brazeau - 995AL tap), 995L (17s Benalto - 995AL tap), 995AL (68s Willesden Green - 995L tap) | line clearance mitigation (strs 9 - 203) | 4.33 Days
Daily |
|
16-Aug-21 09:30 | 19-Aug-21 16:00 | ALTALINK | TE | 17S Benalto | isolate CT contributions | 3.27 Days
Daily |
|
16-Aug-21 09:30 | 19-Aug-21 16:00 | ALTALINK | TE | 17s RTU/SCADA (17s Benalto) | 17s P&C upgrade project - RTU updates | 3.27 Days
Daily |
|
16-Aug-21 09:30 | 18-Aug-21 16:30 | ALTALINK | Outage | 3L (42s Sarcee - 272s Springbank), 42s 3W (42s Sarcee) | protection upgrade and testing | 2.29 Days
Continuous |
|
16-Aug-21 09:30 | 19-Aug-21 14:30 | ALTALINK | Outage | 717L (17s Benalto - 262s Rocky Mountain House), 17s 717W (17s Benalto) | A/B line protection replacement, tie in new 138B3 'B' CT | 3.21 Days
Continuous |
|
16-Aug-21 10:00 | 17-Aug-21 13:15 | SUNCOR | TE | 29EDD-1 Millennium RTU/SCADA | updates to D20MX - 29PL6-22 line upgrade project | 27.25 Hours
Daily |
|
16-Aug-21 10:00 | 17-Aug-21 18:00 | ALTALINK | TE | 368S Burdett, 244S Bowmanton | protection update for 879L 'A' protection | 1.33 Days
Daily |
|
16-Aug-21 10:30 | 17-Aug-21 17:30 | ALTALINK | Outage | 74s C3 (74s Janet), 74s C4 (74s Janet) | PRC5 - 1st trip & maintenance (SF6) | 31 Hours
Continuous |
|
16-Aug-21 12:00 | 20-Aug-21 18:00 | ALTALINK | Outage | 748L (267s Killarney Lake - 277s Hayter), 749AL (267s Killarney Lake - 749L tap), 267s T1 (267s Killarney Lake) | replacing 267s23 (C2) with a new breaker/switch and VT2 | 4.25 Days
Continuous |
|
16-Aug-21 12:00 | 20-Aug-21 18:00 | ALTALINK | Outage | 946L (38s East Edmonton - 89s Ellerslie) | component replacements 946L (str's range 30-71) | 4.25 Days
Continuous |
|
16-Aug-21 12:00 | 20-Aug-21 18:00 | ALTALINK, EPCOR | RB | 947L (89s Ellerslie - 987s Clover Bar) | component replacements 946L (str's range 30-71) | 4.25 Days
Continuous |
|
16-Aug-21 12:00 | 20-Aug-21 18:00 | EPCOR | IO | ALTALINK - 947L - RECLOSER BLOCK @ CLOVERBAR | component replacements 946L (str's range 30-71) | 4.25 Days
Continuous |
|
16-Aug-21 12:00 | 23-Aug-21 12:00 | ATCO | Outage | 6L11 (743s Sarah Lake - 854s Swan Dive) | changing poles from test and treat data | 7 Days
Continuous |
|
16-Aug-21 12:30 | 17-Aug-21 17:30 | ALTALINK | Outage | 268s T3 (268s Whitecourt) | fix oil leaks, hydran, SFRA test | 29 Hours
Continuous |
|
16-Aug-21 13:00 | 02-Sep-21 18:00 | ALTALINK | TE | 267S Killarney Lake | 749AL - relay removal | 17.21 Days
Daily |
|
16-Aug-21 13:30 | 16-Aug-21 17:30 | ALTALINK | TE | 54S Fort Saskatchewan | relay maintenance | 4 Hours
Daily |
|
16-Aug-21 13:30 | 16-Aug-21 17:30 | ALTALINK | TE | 396S Pincher Creek | implement setting changes | 4 Hours
Daily |
|
17-Aug-21 07:00 | 18-Aug-21 18:00 | ALTALINK | Outage | 787AL (906s Ross Creek - 787L tap), 787L (71s Lamoureux - 166s Dow Chemical Fort Saskatchewan) | Tx maintain, doble, top up oil | 1.46 Days
Continuous |
|
17-Aug-21 07:15 | 19-Aug-21 17:45 | ALTALINK | Outage | 608L (138s Windy Flats - 418s Ardenville - 528s Blue Trail Wind Farm) | salvage 608AL31 airbrake | 2.44 Days
Continuous |
|
17-Aug-21 07:15 | 18-Aug-21 17:45 | ALTALINK | Outage | 727L (65s High River - 142s Magcan - 678s Okotoks), 727AL (142s Magcan - 727L tap) | maintenance (Str 6, 7, 10, 20, 24) | 1.44 Days
Continuous |
|
17-Aug-21 08:00 | 19-Aug-21 17:00 | ATCO, ALTALINK | Outage | 732s 904 (732s Mitsue), 9L913 (69s North Barrhead - 732s Mitsue) | breaker maintenance | 2.38 Days
Continuous |
|
17-Aug-21 08:00 | 17-Aug-21 17:00 | SUNCOR | TE | 635PL9-1001 (2005s Secord - 635EDD-1000), 635PL9-1000 (2005s Secord - 635EDD-1000) | outage of 635PL9-1000 A protection, outage of 635PL9-1001 A protection | 9 Hours
Daily |
|
17-Aug-21 08:00 | 17-Aug-21 16:00 | ATCO | RB | 7L39 (722s Crystal Lake - 811s Clairmont Lake), 722s 144kV Bus 700BS1 (722s Crystal Lake) | maintenance | 8 Hours
Continuous |
|
17-Aug-21 08:00 | 17-Aug-21 12:00 | ALTALINK | TE | 523s RTU/SCADA (523s Bullshead) | upgrade MPLS node | 4 Hours
Daily |
|
17-Aug-21 08:00 | 20-Aug-21 16:00 | ENMAX | Outage | 1.83L (ENMAX 1 - ENMAX 8), 8.3TR (ENMAX 8), 8.4TR (ENMAX 8) | oil leak repair | 3.33 Days
Continuous |
|
17-Aug-21 08:00 | 03-Sep-21 20:00 | Syncrude | Outage | Syncrude Mildred Lake | T3 transformer @ Plant 31 Substation | 17.5 Days
Continuous |
|
17-Aug-21 08:00 | 18-Aug-21 17:00 | ATCO | TE | 2005S Secord | PRC005 - 635PL9-1000 and 635PL9-1001 lines have their protection split | 1.38 Days
Continuous |
|
17-Aug-21 09:00 | 18-Aug-21 17:00 | ALTALINK | TE | 938L (77s Sagitawah - 809s Louise Creek) | protection work | 1.33 Days
Daily |
|
17-Aug-21 10:00 | 19-Aug-21 17:00 | ATCO | Outage | 730s 702 (730s Rycroft) | breaker maintenance | 2.29 Days
Continuous |
|
17-Aug-21 12:00 | 21-Aug-21 17:30 | ATCO | TE | 809S Louise Creek | 9L939 - new protection testing | 4.23 Days
Continuous |
|
17-Aug-21 12:00 | 17-Aug-21 18:00 | ALTALINK | TE | 595s RTU/SCADA (595s Spruce Grove) | upgrade MPLS node | 6 Hours
Daily |
|
17-Aug-21 14:00 | 17-Aug-21 17:30 | SUNCOR | TE | 29EDD-2 Tar Island RTU/SCADA | updates to DCS system | 3.5 Hours
Continuous |
|
18-Aug-21 07:00 | 18-Aug-21 17:00 | EPCOR | Outage | HDS1 (EPCOR Hardisty), 72CH11 (987s Clover Bar - EPCOR Hardisty) | hot contact repair/maintenance | 10 Hours
Continuous |
|
18-Aug-21 08:00 | 18-Aug-21 17:00 | ALTALINK | RB | 113L (20s Ghost - 33s Spray) | fire mitigation install new ground rod, copper on 113L73, safety concern | 9 Hours
Daily |
|
18-Aug-21 08:00 | 18-Aug-21 12:00 | ALTALINK | TE | 435s RTU/SCADA (435s Bassano), 853AL (435s Bassano - 853L tap) | upgrade MPLS node | 4 Hours
Daily |
|
18-Aug-21 08:00 | 19-Aug-21 16:00 | ENMAX | Outage | 10.2TR (ENMAX 10) | tapchanger inspection, check reversing switch, oil sampling MT, TC | 1.33 Days
Continuous |
|
18-Aug-21 08:00 | 19-Aug-21 18:00 | ALTALINK | TE | 368S Burdett, 244S Bowmanton | protection update for 879L 'B' protection (P2212 Rattlesnake Ridge) | 1.42 Days
Daily |
|
18-Aug-21 08:30 | 19-Aug-21 17:00 | ALTALINK | TE | 525S Carseland | standard relay maintenance | 1.35 Days
Daily |
|
18-Aug-21 10:00 | 18-Aug-21 13:15 | SUNCOR | TE | 29EDD-2 Tar Island | updates to D20MX to map values to DCS system for 29PL6-22 line upgrade project | 3.25 Hours
Continuous |
|
18-Aug-21 13:00 | 18-Aug-21 15:00 | ATCO | TE | ATCO Radio Tower, 820s Hangingstone RTU/SCADA, 718s RTU/SCADA (718s Parsons Creek), 2014s RTU/SCADA (2014s Halfway), 933s RTU/SCADA (933s Tower Road) | upgrade Stoney Mtn SAR
|
2 Hours
Continuous |
|
18-Aug-21 13:00 | 18-Aug-21 15:00 | ALTALINK | IO | 9L55/1085L, 7L114 - TPR - Atco Info | Atco will be upgrading the radio at Stoney Mountain | 2 Hours
Daily |
|
19-Aug-21 07:00 | 19-Aug-21 18:00 | ALTALINK | Outage | 707L (54s Fort Saskatchewan - 166s Dow Chemical Fort Saskatchewan), 862L (166s Dow Chemical Fort Saskatchewan - 258s Dow Hydro Carbons), 899L (166s Dow Chemical Fort Saskatchewan - 218s Fort Saskatchewan Co-Gen), 166s T1 (166s Dow Chemical Fort Saskatchewan), 166s T2 (166s Dow Chemical Fort Saskatchewan), 258s T1 (258s Dow Hydro Carbons), 258s 252 (258s Dow Hydrocarbons), 258s 552 (258s Dow Hydrocarbons) | 1st trip PRC5 maintenance on 166s862N, fix CT shroud and capacitor mount, 166s899N capacitor mounting kit, T1, replace conservator gauge, fix Hydran monitor warning,166s1 & 166s24 clean and adjust | 11 Hours
Daily |
|
19-Aug-21 07:00 | 19-Aug-21 17:00 | EPCOR | Outage | EP 511s Victoria T1 (EP 511s Victoria), EP 511s V721 (EP 511s Victoria), EP 511s V722 (EP 511s Victoria) | VDS4/VDS5 maintenance | 10 Hours
Continuous |
|
19-Aug-21 08:00 | 19-Aug-21 12:00 | ALTALINK, TRANSALTA | TE | AltaLink TPR Outage, 218s RTU/SCADA (218s Fort Saskatchewan Co-Gen) | upgrade MPLS node | 4 Hours
Daily |
|
19-Aug-21 08:00 | 18-Sep-21 16:30 | ALTALINK | TE | 258s RTU/SCADA (258s Dow Hydrocarbons) | install new SCADA cabinet, transfer alarms and control to new SCADA cabinet | 30.35 Days
Daily |
|
19-Aug-21 08:00 | 20-Aug-21 17:00 | ALTALINK, ENMAX | RB | 1064L (74s Janet - 102s Langdon), 985L (74s Janet - ENMAX 25) | remove street light near 1064L13 for contractor doing road widening intersection of Glenmore Trail
|
1.38 Days
Daily |
|
19-Aug-21 08:30 | 20-Aug-21 16:30 | ATCO | Outage | 848s 605 (848s Ruth Lake) | 848S 605 breaker maintenance | 1.33 Days
Continuous |
|
19-Aug-21 09:00 | 19-Aug-21 19:00 | ATCO | Outage | 725s 701T (725s Goose River) | repair 701T leaks | 10 Hours
Continuous |
|
19-Aug-21 09:00 | 19-Aug-21 17:00 | ATCO | RB | 763S Hanna | 600 Bus 1 - tapping up 72 kV bus to 750s | 8 Hours
Continuous |
|
19-Aug-21 18:00 | 20-Aug-21 18:00 | ALTALINK | Outage | 166s T1 (166s Dow Chemical Fort Saskatchewan), 862L (166s Dow Chemical Fort Saskatchewan - 258s Dow Hydro Carbons), 899L (166s Dow Chemical Fort Saskatchewan - 218s Fort Saskatchewan Co-Gen), 258s T1 (258s Dow Hydro Carbons), 258s 252 (258s Dow Hydrocarbons), 258s 552 (258s Dow Hydrocarbons) | migrate alarms and controls from the existing SCADA system to the new system | 24 Hours
Continuous |
|
20-Aug-21 07:00 | 24-Aug-21 18:00 | ALTALINK | Outage | 790L (434s Stony Plain - 790AL tap) | maintenance on structures 68, 69, 96, 97, 103, and 113 | 4.46 Days
Continuous |
|
20-Aug-21 07:00 | 20-Aug-21 17:00 | EPCOR | Outage | EP 511s V723 (EP 511s Victoria), EP 511s V724 (EP 511s Victoria), 72RV6 (EP 511s Victoria - Rossdale) | maintenance on VDS9 | 10 Hours
Continuous |
|
20-Aug-21 08:00 | 20-Aug-21 17:00 | ATCO | RB | 7L28 (717s Ethel Lake - 846s Grand Centre) | 846s maintenance, tap down mobile sub from 7L28 | 9 Hours
Continuous |
|
20-Aug-21 08:00 | 30-Aug-21 18:00 | SUNCOR | Outage | 29PL6-6 (29EDD-1 Millennium - 29EDD-2 Tar Island | replacement of B protection upgrade | 10.42 Days
Continuous |
|
20-Aug-21 08:00 | 20-Aug-21 17:00 | ATCO | TE | ATCO Radio Tower | change Loyalist_S_Telecom MPLS setting to Bdl MRRU | 9 Hours
Continuous |
|
20-Aug-21 11:00 | 26-Aug-21 17:00 | ATCO, SUNCOR | Outage | 29PL9-1 (29EDD-1 Millennium - 848s Ruth Lake) | maintenance activities at Suncor base plant | 6.25 Days
Continuous |
|
20-Aug-21 18:00 | 01-Sep-21 18:00 | ALTALINK | Outage | 862L, 258s T1 & 138kV Bus 1 - GOI, 862L (166s Dow Chemical Fort Saskatchewan - 258s Dow Hydro Carbons), 258s T1 (258s Dow Hydro Carbons), 258s 138kV Bus 1 (258s Dowhydrocarbons) | Migrate alarms and controls from the existing SCADA system to the new system. This will include 138kV Bus 1 protection, T1 Protection, breakers 258s252, 258s652, and 258s552 controls and status, MOD 258s862X control and status, and 862L protection alarms. 166s4 switch replacement and strain insulator replacement on 862L @ 258s | 12 Days
Continuous |
|
20-Aug-21 18:00 | 02-Sep-21 18:00 | ALTALINK | Outage | 267s 138kV Bus (748L, C1, C2, C3) - GOI, 748L (267s Killarney Lake - 277s Hayter) | Replacing 267s23 (C2) with a new breaker/switch and VT2. | 13 Days
Continuous |
This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein. © 2009 Alberta Electric System Operator. All rights reserved |