From | To | Owner | Type | Element | Scheduled Activity | Date/Time Comments | Interconnection |
---|---|---|---|---|---|---|---|
31-Jul-15 18:01 | 31-Aug-18 17:00 | EPCOR | Outage | Rossdale C1 (Rossdale) | forced outage | 1,126.96 Days
Continuous |
|
27-Mar-18 07:00 | 31-Aug-18 17:00 | EPCOR | TE | Strathcona RTU/SCADA | substation automation upgrade project, IP address update and cutover of RTU to new network | 157.42 Days
Daily |
|
27-Mar-18 07:00 | 31-Aug-18 17:00 | EPCOR | TE | Strathcona | substation automation upgrade project, IP address update and cutover of IED's to new network | 157.42 Days
Daily |
|
16-Apr-18 07:00 | 15-Dec-18 17:00 | EPCOR | TE | 803S Lambton | substation automation upgrade | 243.46 Days
Daily |
|
16-Apr-18 07:00 | 15-Dec-18 17:00 | EPCOR | TE | 803s Lambton RTU/SCADA | substation automation upgrade | 243.46 Days
Daily |
|
21-Apr-18 08:00 | 30-Sep-18 16:00 | ALTALINK | Outage | 100L (895s Suffield - 498s Tilley) | forced outage due to underbuild issues | 162.33 Days
Continuous |
|
30-Apr-18 07:00 | 21-Sep-18 17:00 | EPCOR | Outage | Namao T1 (Namao),Namao N721 (Namao),Namao N722 (Namao) | TX replacement | 144.42 Days
Continuous |
|
09-May-18 11:30 | 11-Aug-18 17:00 | ALTALINK | Outage | 902L (19s Wabamun - 310p Sundance) | emergency safety requirement | 94.23 Days
Continuous |
|
17-May-18 05:30 | 31-Aug-18 17:30 | ALTALINK | RB | 551L (123s Banff - 953s Lake Louise) | line rebuild | 106.5 Days
Daily |
|
19-May-18 07:00 | 30-Jul-18 18:00 | ATCO, ALTALINK | RB | 9L913 (69s North Barrhead - 732s Mitsue) | new 500kv line construction parallel to 9L913 | 72.46 Days
Daily |
|
04-Jun-18 08:00 | 22-Aug-18 17:00 | ATCO | Outage | 722s 702T (722s Crystal Lake) | real time forced outage | 79.38 Days
Continuous |
|
07-Jun-18 08:00 | 15-Sep-18 08:00 | ENMAX | Outage | 1.81L (ENMAX 20 - ENMAX 1) | DCTRP replace conductor | 100 Days
Continuous |
|
18-Jun-18 07:00 | 21-Sep-18 17:00 | EPCOR | Outage | Strathcona T1 (Strathcona),72RS5 (Rossdale - Strathcona) | transformer replacement | 95.42 Days
Continuous |
|
28-Jun-18 07:00 | 31-Jul-18 18:00 | ATCO, ALTALINK | RB | 9L913 (69s North Barrhead - 732s Mitsue) | new 500 kv line construction parallel to 9L913 | 33.46 Days
Continuous |
|
28-Jun-18 07:00 | 31-Jul-18 18:00 | ALTALINK | RB | 913L (69s North Barrhead - 732s Mitsue) | Atco maintenance (new 500kV line construction parallel to 9L913) | 33.46 Days
Daily |
|
09-Jul-18 07:00 | 03-Aug-18 17:00 | EPCOR | Outage | Rossdale T3 (Rossdale) | cable moves | 25.42 Days
Continuous |
|
09-Jul-18 07:30 | 03-Aug-18 18:30 | ALTALINK | IO | 9.80L Enmax - Info | ENMAX line protection upgrade | 25.46 Days
Continuous |
|
10-Jul-18 18:00 | 03-Aug-18 16:00 | ENMAX | Outage | 9.80L (ENMAX 31 - ENMAX 9) | line protection upgrade | 23.92 Days
Continuous |
|
11-Jul-18 08:00 | 01-Aug-18 14:00 | ALTALINK | IO | 767L50 Open - info only | used to track 767L50 open and 21s & 635s fed via 320p | 21.25 Days
Continuous |
|
12-Jul-18 14:00 | 30-Jul-18 12:00 | ALTALINK | Outage | 512L (310p Sundance - 821s Sundance) | replace all wooden cross arms | 17.92 Days
Continuous |
|
16-Jul-18 11:00 | 26-Jul-18 16:00 | ALTALINK | Outage | 1112L (289s Saunders Lake - 89s Ellerslie),89s 1452 (89s Ellerslie),89s 1552 (89s Ellerslie) | 89s1452 breaker replacement, 89s81 PT replacement | 10.21 Days
Continuous |
|
16-Jul-18 11:00 | 26-Jul-18 16:00 | EPCOR | IO | ALTALINK - 1112L (89s-289s) - Advice | 89s1452 breaker replacement, 89s81 PT replacement | 10.21 Days
Continuous |
|
16-Jul-18 11:00 | 26-Jul-18 16:00 | ALTALINK, EPCOR | RB | 947L (89s Ellerslie - 987s Clover Bar) | 89s1452 breaker replacement, 89s81 PT replacement | 10.21 Days
Continuous |
|
18-Jul-18 07:00 | 01-Aug-18 18:00 | ALTALINK | Outage | 708L (71s Lamoureux - 708L88X) | install new switch 708L87F | 14.46 Days
Continuous |
|
19-Jul-18 08:00 | 31-Aug-18 16:00 | ALTALINK | Outage | 953S Lake Louise | station upgrade - 69kV bus rebuild | 43.33 Days
Continuous |
|
19-Jul-18 13:00 | 28-Jul-18 17:00 | ALTALINK | Outage | 452L (434s Stony Plain - 367s Harry Smith) | moving portions of line to allow for road widening between Structures 33 - 59 | 9.17 Days
Continuous |
|
20-Jul-18 17:46 | 14-Sep-18 17:00 | ATCO | Outage | 7L760 (7L760D2 - 767s Oyen) | emergency outage | 55.97 Days
Continuous |
|
21-Jul-18 07:00 | 27-Aug-18 18:00 | ATCO | RB | 7L30 (732s Mitsue - 844s AEC Mill) | close proximity for stringing conductor on 500kV line | 37.46 Days
Continuous |
|
23-Jul-18 07:00 | 26-Jul-18 17:00 | ATCO | Outage | 7L702 (137s Sedgewick - 757s Battle River),757s 708 (757s Battle River) | Install and test transfer trip from Altalink | 3.42 Days
Continuous |
|
23-Jul-18 07:00 | 10-Aug-18 17:00 | EPCOR | Outage | E511s VictoriaT3 (511s Victoria),Victoria V725 (Victoria),Victoria V724 (Victoria) | cutting over and commissioning new protection | 18.42 Days
Continuous |
|
23-Jul-18 08:00 | 26-Jul-18 17:00 | ATCO | IO | 7L702 (137s Sedgewick - 757s Battle River) | change arms and insulators on 7L702 | 3.38 Days
Continuous |
|
23-Jul-18 08:00 | 26-Jul-18 17:00 | ATCO | Outage | 6L12 (6L25 tap - 774s Monitor) | install screw piles for new 6L12D3 just east of existing 6L12D3 | 3.38 Days
Daily |
|
23-Jul-18 08:00 | 26-Jul-18 17:00 | ALTALINK | IO | 757s708 Info only | Trip test. ATCO Ref #: 2-00044360; coordinated with ATCO line maintenance | 3.38 Days
Continuous |
|
23-Jul-18 08:00 | 02-Aug-18 16:00 | ALTALINK | TE | AltaLink Radio Tower | 316s - installation of new radio and updating RTU configuration | 10.33 Days
Continuous |
|
23-Jul-18 08:00 | 22-Sep-18 19:00 | ENMAX | TE | ENMAX 39 | 138 kV bus differential panel replacement | 61.46 Days
Continuous |
|
23-Jul-18 08:00 | 27-Jul-18 16:00 | ENMAX | Outage | 12.2TR (ENMAX 12) | HV CT addition | 4.33 Days
Continuous |
|
23-Jul-18 08:00 | 27-Jul-18 17:00 | TRANSALTA | TE | Transalta Telemetry | telemetry outage to Alberta sites | 4.38 Days
Continuous |
|
23-Jul-18 09:00 | 26-Jul-18 17:00 | ALTALINK | TE | 267s Killarney Lake RTU/SCADA | update RTU | 3.33 Days
Daily |
|
23-Jul-18 09:15 | 03-Aug-18 17:45 | ALTALINK | Outage | 754L (437s Baymag - 754L75) | structure replacements | 11.35 Days
Continuous |
|
23-Jul-18 09:30 | 26-Jul-18 12:00 | ATCO | RB | 9L1088 (324s Cassils - 2075s Newell) | AltaLink is requesting a daily reclose block on 9L1088, for work in proximity to 1051L - SCADA upgrade | 3.1 Days
Daily |
|
23-Jul-18 10:00 | 26-Jul-18 16:00 | ALTALINK | Outage | 87s T1 (87s Gaetz),914L (87s Gaetz - 63s Red Deer),87s 552 (87s Gaetz),87s 152 (87s Gaetz),87s 952 (87s Gaetz),87s 1652 (87s Gaetz) | replace bus protection and perform test trips | 3.25 Days
Continuous |
|
23-Jul-18 10:00 | 27-Jul-18 16:00 | ATCO | Outage | 801s 911 (801s Anderson) | breaker testing and maintenance | 4.25 Days
Continuous |
|
23-Jul-18 10:00 | 27-Jul-18 17:00 | ATCO | TE | 755s Cordel RTU/SCADA | network upgrade | 4.29 Days
Continuous |
|
23-Jul-18 11:00 | 26-Jul-18 14:00 | ALTALINK | Outage | 212s T1 (212s N.E.Lacombe) | 212s28 replacement, bird cover & Doble test | 3.13 Days
Continuous |
|
23-Jul-18 12:30 | 26-Jul-18 16:30 | ALTALINK | Outage | 945s T2 (945s Sunshine Village) | change out the 25kV bushings ,doble and maintain | 3.17 Days
Continuous |
|
23-Jul-18 13:00 | 26-Jul-18 17:00 | ALTALINK | Outage | 1051L (28s West Brooks - 324s Cassils),324s 1652 (324s Cassils),324s 1752 (324s Cassils) | SCADA system upgrade | 3.17 Days
Continuous |
|
23-Jul-18 13:00 | 26-Jul-18 16:00 | ALTALINK | Outage | 974L (39s Bickerdike - 310p Sundance),310p 152 (310p Sundance),310p 252 (310p Sundance) | migrate and commission new protections | 3.13 Days
Continuous |
|
23-Jul-18 13:30 | 26-Jul-18 16:00 | ALTALINK | Outage | 562s T2 (562s Cypress) | Maintain, doble, SFRA and investigate alarm on T2. | 3.1 Days
Continuous |
|
23-Jul-18 13:30 | 27-Jul-18 12:30 | ATCO | Outage | 791s 701T (791s Rainbow Lake) | MR TC upgrade and maintenance | 3.96 Days
Continuous |
|
23-Jul-18 14:00 | 26-Jul-18 15:00 | ALTALINK | TE | 310P Sundance | PMU Migrate and commission | 3.04 Days
Daily |
|
24-Jul-18 07:00 | 31-Jul-18 17:00 | ALTALINK, EPCOR | RB | 1045L (310p Sundance - 805s Jasper) | steel pole refurbishment | 7.42 Days
Continuous |
|
24-Jul-18 07:00 | 31-Jul-18 17:00 | EPCOR | RB | 1098L (805s Jasper - Poundmaker) | steel pole refurbishment | 7.42 Days
Continuous |
|
24-Jul-18 07:00 | 31-Jul-18 17:00 | ALTALINK, EPCOR | RB | 1045L (310p Sundance - 320p Keephills - 805s Jasper) | steel pole refurbishment | 7.42 Days
Continuous |
|
24-Jul-18 07:00 | 26-Jul-18 18:00 | ALTALINK | TE | 316s West Crossfield RTU/SCADA | re-cabling antennas and radios | 2.46 Days
Daily |
|
24-Jul-18 07:00 | 26-Jul-18 18:00 | ALTALINK | Outage | 723L (69s North Barrhead - 723L133) | install new dead end structure east of Str. #205 and remove anchors on Str. #205 | 2.46 Days
Continuous |
|
24-Jul-18 08:00 | 03-Aug-18 16:00 | ENMAX | Outage | 39.2TR (ENMAX 39) | panel replacement | 10.33 Days
Continuous |
|
24-Jul-18 08:00 | 26-Jul-18 17:00 | ALTALINK | TE | 310P Sundance RTU/SCADA | update RTU configuration for 974L | 2.38 Days
Daily |
|
24-Jul-18 08:00 | 27-Jul-18 17:00 | ATCO | TE | 802s Michichi Creek RTU/SCADA | RTU update | 3.38 Days
Continuous |
|
24-Jul-18 08:00 | 27-Jul-18 17:00 | ATCO | TE | 804s Wintering Hills RTU/SCADA | Wintering Hills IPP RTU updates | 3.38 Days
Continuous |
|
24-Jul-18 08:00 | 27-Jul-18 17:00 | ATCO | TE | 963s Coyote Lake RTU/SCADA | RTU upgrade | 3.38 Days
Continuous |
|
24-Jul-18 08:00 | 27-Jul-18 17:00 | ATCO | TE | 932s Pemukan RTU/SCADA | RTU upgrade | 3.38 Days
Continuous |
|
24-Jul-18 08:00 | 27-Jul-18 17:00 | ATCO | TE | 959s Lanfine RTU/SCADA | RTU upgrade | 3.38 Days
Continuous |
|
24-Jul-18 08:00 | 27-Jul-18 17:00 | ATCO | TE | 769s Stettler RTU/SCADA | RTU upgrade | 3.38 Days
Continuous |
|
24-Jul-18 08:00 | 27-Jul-18 15:30 | ALTALINK, Lethbridge | RB | 824L (593s Lethbridge Lakeview - 618s Riverbend) | safety concern for city of Lethbridge work | 3.31 Days
Continuous |
|
24-Jul-18 23:30 | 02-Aug-18 14:00 | ALTALINK | Outage | 799s T3 (799s Coleman) | de-energize T3 with 799s bus outage | 8.6 Days
Continuous |
|
25-Jul-18 07:00 | 26-Jul-18 15:30 | ATCO | Outage | 2075s ACF14 (2075s Newell) | filter bank inspection/maintenance, | 1.35 Days
Continuous |
|
25-Jul-18 07:00 | 26-Jul-18 15:30 | ALTALINK | IO | A2075s ACF14 ATCO Info | Atco maintenance (filter bank inspection/maintenance) | 1.35 Days
Continuous |
|
25-Jul-18 07:00 | 01-Aug-18 18:00 | ATCO | RB | 7L31 (732s Mitsue - 844s AEC MILL) | close proximity for stringing conductor on 500KV line | 7.46 Days
Daily |
|
25-Jul-18 08:00 | 26-Jul-18 16:00 | ENMAX | Outage | 37.1TR (ENMAX 37) | tapchanger inspection. oil sampling MT | 1.33 Days
Continuous |
|
25-Jul-18 08:30 | 26-Jul-18 17:00 | ALTALINK | Outage | 305s T1 (305s Acheson) | replace 305sT1 bushing X2 and X3 & install bird cover up on the bushings | 1.35 Days
Continuous |
|
25-Jul-18 12:01 | 27-Jul-18 15:30 | ALTALINK | Outage | 510s ACF12 (510s Sunnybrook) | outage and required to inspect the filter bank | 2.15 Days
Continuous |
|
26-Jul-18 07:00 | 27-Jul-18 17:00 | ATCO | IO | 7L81 (FNG Fort Nelson - 791s Rainbow Lake) | BC Hydro requests from their line crew to perform live line work on 1L359 at the KLC tap | 1.42 Days
Daily |
|
26-Jul-18 07:00 | 26-Jul-18 17:00 | ALTALINK | TE | 737L (95s Imperial Oil Edmonton - 38s East Edmonton) | urgent telecom TPR channel 1 and RTU repairs | 10 Hours
Continuous |
|
26-Jul-18 08:00 | 27-Jul-18 16:00 | ALTALINK | TE | 305s Acheson RTU/SCADA | perform testing on HMI | 1.33 Days
Daily |
|
26-Jul-18 09:00 | 26-Jul-18 15:00 | ALTALINK | IO | 132S Ware Junction,MPLS | replacement on mda card in MPLS, all circuits rerouted | 6 Hours
Daily |
|
27-Jul-18 07:00 | 03-Aug-18 19:00 | Saskpower | Outage | SaskPower C1S | maintenance | 7.5 Days
Continuous |
AB-SK |
27-Jul-18 08:00 | 27-Jul-18 16:00 | ENMAX | Outage | 2.4TR (ENMAX 2) | oil sample, bushings | 8 Hours
Continuous |
|
27-Jul-18 08:00 | 06-Aug-18 16:00 | ENMAX | Outage | 28.1TR (ENMAX 28) | NGR installation | 10.33 Days
Continuous |
|
28-Jul-18 07:00 | 28-Jul-18 17:00 | EPCOR | Outage | 1055L (816s Petrolia - 629s Argyll Transfer Station),BA3/1055L @ Argyl | Doble | 10 Hours
Continuous |
|
28-Jul-18 07:00 | 28-Jul-18 17:00 | ALTALINK | IO | 1055L (E816s-E629s) EPCOR Outage - Info | EPCOR washing program | 10 Hours
Daily |
|
28-Jul-18 07:00 | 29-Jul-18 17:00 | EPCOR | Outage | Emergency Request - Bus 4 @ Cloverbar | CVT Replacement | 1.42 Days
Continuous |
|
28-Jul-18 08:00 | 29-Jul-18 16:00 | ENMAX | Outage | 11.2TR (ENMAX 11) | Install new card on T60. Test HV slipover CT | 1.33 Days
Continuous |
|
28-Jul-18 08:00 | 28-Jul-18 18:00 | ENMAX | Outage | 5B138-5BT7 | Doble 5B138-5BT7 138kV East & West CTs | 10 Hours
Continuous |
|
28-Jul-18 08:00 | 28-Jul-18 18:00 | ENMAX | Outage | ENMAX 5 | Doble test PTs. 2.82L, 1.84L, and 1.82L distance elements will not function while PTs are out of service but lines will remain protected through line differential protection. | 10 Hours
Continuous |
|
28-Jul-18 08:00 | 15-Aug-18 16:00 | ATCO | RB | 9L56 (732s Mitsue - 876s Brintnell) | close proximity for stringing conductor on 500KV line | 18.33 Days
Daily |
|
29-Jul-18 06:30 | 29-Jul-18 17:30 | ALTALINK | IO | 920L (E557s - 37s) EPCOR Outage - Advice | Doble | 11 Hours
Daily |
|
29-Jul-18 07:00 | 29-Jul-18 17:00 | ALTALINK, EPCOR | Outage | 920L (37s North Calder - 557s Castle Downs) | Doble | 10 Hours
Continuous |
|
30-Jul-18 07:00 | 01-Aug-18 15:30 | ATCO | Outage | 2075s ACF21 (2075s Newell),2075s 902T (2075s Newell) | ACF21/902T inspections/maintenance | 2.35 Days
Continuous |
|
30-Jul-18 07:00 | 01-Aug-18 15:30 | ALTALINK | IO | A2075s ACF21 ATCO Info | Atco maintenance - ACF21/902T inspections/maintenance | 2.35 Days
Continuous |
|
30-Jul-18 07:00 | 01-Aug-18 15:30 | ATCO | TE | 2075s SVC2 (2075s Newell),2075s 902T (2075s Newell) | CIP relay firmware upgrade at Newell 2075S - 902T B protection out-of-service | 2.35 Days
Continuous |
|
30-Jul-18 07:30 | 02-Aug-18 18:00 | ALTALINK | RB | 847L (39s Bickerdike - 406s Fickle Lake),847L (602s Cold Creek - 406s Fickle Lake) | reclosers blocked for safety risk mitigation to assemble and set 492L1 bypass switch near Cold Creek 602s | 3.44 Days
Continuous |
|
30-Jul-18 07:30 | 01-Aug-18 07:00 | ALTALINK | RB | 615L (602s Cold Creek - 104s Watson Creek) | reclosers blocked on 615L for safety risk mitigation to assemble and set 492L1 bypass switch near Cold Creek 602s | 1.98 Days
Continuous |
|
30-Jul-18 08:00 | 01-Aug-18 16:00 | ENMAX | Outage | ENMAX 65 B240-D130 (ENMAX 65) | HV breaker maintenance | 2.33 Days
Continuous |
|
30-Jul-18 08:00 | 03-Aug-18 16:00 | ENMAX | Outage | 41.2TR (ENMAX 41) | doble, secondary cable tests and maintenance | 4.33 Days
Continuous |
|
30-Jul-18 08:00 | 02-Aug-18 16:00 | ENMAX | Outage | 31.2TR (ENMAX 31) | tapchanger inspection, oil sample TC | 3.33 Days
Continuous |
|
30-Jul-18 08:00 | 02-Aug-18 18:00 | ENMAX | Outage | 38.3TR (ENMAX 38) | HV CT replacement | 3.42 Days
Continuous |
|
30-Jul-18 08:00 | 01-Aug-18 16:00 | ENMAX | TE | ENMAX 31 138kV Bus | line protection upgrade on 9.80L, update bus differential relay settings | 2.33 Days
Continuous |
|
30-Jul-18 08:00 | 30-Jul-18 16:00 | ENMAX | TE | ENMAX 31 | line protection upgrade on 9.80L - rewire circuits | 8 Hours
Continuous |
|
30-Jul-18 08:00 | 30-Jul-18 16:00 | ENMAX | TE | 9.80L (ENMAX 31 - ENMAX 9) | 9.80L protection upgrade | 8 Hours
Daily |
|
30-Jul-18 08:30 | 01-Aug-18 15:30 | ATCO | TE | 2075s 902T (2075s Newell) | 2075S 902T protection | 2.29 Days
Continuous |
|
30-Jul-18 09:00 | 19-Aug-18 18:00 | SUNCOR | Outage | 29EDD-34 Edd34Sub,29PL9-14 (29EDD-56 - 29EDD-34) | 5 year maintenance on breakers, bus CT and switches | 20.38 Days
Continuous |
|
30-Jul-18 09:00 | 02-Aug-18 16:00 | ATCO | RB | 7L10 (730s Rycroft - 754s Ksituan River) | install line monitors | 3.29 Days
Daily |
|
30-Jul-18 10:00 | 02-Aug-18 16:00 | ALTALINK | Outage | 87s T2 (87s Gaetz),914L (86s Bigstone - 87s Gaetz),87s 852 (87s Gaetz),87s 252 (87s Gaetz),87s 2352 (87s Gaetz),87s 1052 (87s Gaetz),87s 1252 (87s Gaetz),87s Gaetz 138kV East Bus,87s Gaetz 240kV East Bus | replace A87/240BE protection and perform test trips to 87s2352, 87s1252, 87s1052, 87s852, & 87s252 | 3.25 Days
Continuous |
|
30-Jul-18 10:00 | 03-Aug-18 16:00 | ATCO | Outage | 801s 912 (801s Anderson) | breaker maintenance | 4.25 Days
Continuous |
|
30-Jul-18 10:00 | 31-Jul-18 17:00 | ATCO | RB | 7L172 (739s Edith Lake - 743s Sarah Lake) | build bypass between 7L172 and 7L55 | 31 Hours
Daily |
|
30-Jul-18 10:00 | 31-Jul-18 17:00 | ATCO | RB | 7L55 (809s Louise Creek - 743s Sarah Lake) | build bypass between 7L172 and 7L55 | 31 Hours
Daily |
|
30-Jul-18 10:30 | 03-Aug-18 16:00 | ATCO | TE | 7L172 (739s Edith Lake - 743s Sarah Lake) | temporary relay settings need to be installed onto the 21A and 21B relay settings on 7L172 at 739s | 4.23 Days
Continuous |
|
30-Jul-18 10:30 | 03-Aug-18 16:00 | ATCO | TE | 7L55 (809s Louise Creek - 743s Sarah Lake) | temporary relay settings need to be installed onto the 21A and 21B relay settings on 7L55 at 809s | 4.23 Days
Continuous |
|
30-Jul-18 11:00 | 30-Jul-18 17:00 | ALTALINK | TE | 103s Goose Lake RTU/SCADA | techs will be onsite to replace faulty alarm card on the following | 6 Hours
Daily |
|
30-Jul-18 11:30 | 30-Jul-18 17:00 | ALTALINK | TE | 127S Bruderheim | 127s relay maintenance | 5.5 Hours
Daily |
|
30-Jul-18 11:30 | 30-Jul-18 17:00 | ALTALINK | TE | 54S Fort Saskatchewan | standard relay maintenance | 5.5 Hours
Daily |
|
30-Jul-18 12:00 | 02-Aug-18 14:00 | ALTALINK | Outage | 799s T3 (799s Coleman) | replace 799s T3 bushings, 138kV LA and 25kV LA, doble and fix oil leaks | 3.08 Days
Continuous |
|
30-Jul-18 12:00 | 30-Jul-18 17:00 | ALTALINK | Outage | 17s T2 (17s Benalto) | emergency outage, CT wiring changes/testing | 5 Hours
Continuous |
|
30-Jul-18 12:30 | 02-Aug-18 17:00 | ALTALINK | TE | 17s Benalto RTU/SCADA | update passwords on all required equipment and relays as per CIP compliance | 3.19 Days
Continuous |
|
30-Jul-18 12:30 | 31-Jul-18 17:00 | TRANSALTA | TE | 179S Gleichen | 179s - standard relay maintenance | 28.5 Hours
Continuous |
|
30-Jul-18 12:30 | 02-Aug-18 17:00 | ALTALINK | IO | 17S Benalto | update passwords on all required equipment and relays as per CIP compliance requirements | 3.19 Days
Continuous |
|
30-Jul-18 12:30 | 02-Aug-18 16:30 | ALTALINK | Outage | 945s T1 (945s Sunshine Village) | change out the 25kV bushings on T1, doble and maintain | 3.17 Days
Continuous |
|
30-Jul-18 13:00 | 30-Jul-18 16:00 | ALTALINK | TE | MPLS | 9356R Evansburg MPLS project | 3 Hours
Daily |
|
30-Jul-18 13:15 | 02-Aug-18 16:45 | ALTALINK | Outage | 310p 952 (310p Sundance),310p 852 (310p Sundance) | migrate and commission protections, alarms, status, controls, metering and remote access to new RTU and LAN | 3.15 Days
Continuous |
|
30-Jul-18 14:00 | 02-Aug-18 15:00 | ALTALINK | TE | 310P Sundance | 310P PMU - migrate and commission associated alarms and remote access to new RTU and LAN | 3.04 Days
Daily |
|
31-Jul-18 07:00 | 01-Aug-18 17:00 | ATCO | Outage | 743S 700BS1,743S 704,743S 700PT1,743S 605,743S 701 | Replace insulators, Switch Maintenance | 1.42 Days
Continuous |
|
31-Jul-18 07:00 | 01-Aug-18 17:00 | ALTALINK | IO | 7L172/7L55 (A743s) ATCO Info | Atco Maintenance (7L172 & 7L55 Tied together with a bypass @ 743S Sarah Lake; Replace insulators, Switch Maintenance, Temporary Protection settings in place @ 809S & 739S for Bypass) | 1.42 Days
Continuous |
|
31-Jul-18 08:00 | 31-Jul-18 09:59 | ALTALINK | TE | 324s Cassils 240kV Bus 1 | SCADA system upgrade A protection | 119 Mins
Daily |
|
31-Jul-18 08:00 | 31-Jul-18 17:00 | ALTALINK | TE | 324s Cassils RTU/SCADA | RTU configuration updates | 9 Hours
Daily |
|
31-Jul-18 08:00 | 01-Aug-18 14:00 | ALTALINK | Outage | 767L (310p Sundance - 767L50) | disconnect 471s from 767L at 310p | 30 Hours
Continuous |
|
31-Jul-18 08:00 | 02-Aug-18 17:00 | ALTALINK | TE | 310p RTU | Update RTU configuration for migration and commissioning of stub bus associated alarms, controls, status and metering from old D20 RTU to new SMP16 RTU. 4 or 5 short (15 minute) outages per day | 2.38 Days
Daily |
|
31-Jul-18 08:00 | 31-Jul-18 17:00 | ATCO | Outage | 6L12 (775s Sullivan Lake - 6L25 tap),6L12 (6L25 tap - 774s Monitor) | install new gang switches | 9 Hours
Continuous |
|
31-Jul-18 08:00 | 31-Jul-18 17:00 | ATCO | TE | 2075s SVC2 (2075s Newell) | network equipment upgrade | 9 Hours
Continuous |
|
31-Jul-18 08:00 | 01-Aug-18 16:00 | ATCO | TE | 743s Sarah Lake RTU/SCADA | update station controller firmware | 1.33 Days
Continuous |
|
31-Jul-18 09:00 | 31-Jul-18 12:00 | ALTALINK | TE | 234s Fort Assiniboine RTU/SCADA | upgrading MPLS nodes A and B at 9069s Barrhead | 3 Hours
Daily |
|
31-Jul-18 09:00 | 31-Jul-18 12:00 | ALTALINK | Outage | 723L (69s North Barrhead - 723L133),69s723E Open (Affecting 723L) | Netcom and Field Ops will be upgrading MPLS nodes A and B at 69S Barrhead. During this outage the RTU to 69S will be lost 15 minutes. 723L TPR A and B will be out of servcie for 15 minutes 913L TPR have redundant channels and will be down one at a time, while 1201L TPR (disabled) will be down for 15 minutes. | 3 Hours
Daily |
|
31-Jul-18 09:00 | 31-Jul-18 12:00 | ALTALINK | TE | 69s North Barrhead RTU/SCADA | upgrading MPLS nodes A and B at 69S Barrhead | 3 Hours
Daily |
|
31-Jul-18 09:00 | 31-Jul-18 12:00 | ATCO | IO | 9L913 | Altalink will be upgrading their MPLS nodes A and B at 69s. AML will be performing TPR work on 913L A and B prot. Their techs will be removing the channels on 913L one at a time. No outages expected. ATCO's 9L913 Reclosing Block has been cancelled to accommodate this work. |
3 Hours
Continuous |
|
31-Jul-18 09:30 | 02-Aug-18 17:00 | ALTALINK | TE | 358S Amoco Brazeau | relay maintenance | 2.31 Days
Continuous |
|
31-Jul-18 10:00 | 31-Jul-18 11:59 | ALTALINK | TE | 324s Cassils 240kV Bus 1 | SCADA system upgrade B protection | 119 Mins
Daily |
|
31-Jul-18 11:00 | 31-Jul-18 15:00 | ATCO | TE | 851s Morse River RTU/SCADA | Aprisa radio at 851s software upgrade | 4 Hours
Continuous |
|
31-Jul-18 12:00 | 31-Jul-18 13:59 | ALTALINK | TE | 324s Cassils 240kV Bus 2 | SCADA system upgrade A protection | 119 Mins
Daily |
|
31-Jul-18 12:30 | 31-Jul-18 16:30 | ALTALINK | Outage | 179s T1 (179s Gleichen) | relay maintenance | 4 Hours
Daily |
|
31-Jul-18 14:00 | 31-Jul-18 16:00 | ALTALINK | TE | 324s Cassils 240kV Bus 2 | SCADA system upgrade B protection | 2 Hours
Daily |
|
01-Aug-18 07:00 | 02-Aug-18 14:00 | ALTALINK | TE | 316s West Crossfield RTU/SCADA | installation of new radio and updating RTU configuration | 31 Hours
Daily |
|
01-Aug-18 07:00 | 02-Aug-18 17:00 | ALTALINK | Outage | 180L (15s Fort Macleod - 928s East Stavely) | install new piles underneath 180L for new 15s NGR and 25KV Cable Structure | 1.42 Days
Continuous |
|
01-Aug-18 07:30 | 02-Aug-18 18:00 | ALTALINK | Outage | 104S Watson Creek,615L (602s Cold Creek - 104s Watson Creek) | new structure 143 installation | 1.44 Days
Continuous |
|
01-Aug-18 08:00 | 01-Aug-18 18:00 | Syncrude | TE | Syncrude loss of visibility | ICCP server upgrade | 10 Hours
Continuous |
|
01-Aug-18 08:00 | 02-Aug-18 17:00 | ALTALINK | RB | 801L (62s Brazeau - 294s Brazeau Outlet Works),844L (358s Amoco Brazeau - 477s Amoco West Pembina),801L (294s Brazeau Outlet Works - 358s Amoco Brazeau) | set up and connect 472s at 358s | 1.38 Days
Daily |
|
01-Aug-18 08:00 | 01-Aug-18 16:00 | ALTALINK | TE | 799s Coleman RTU/SCADA | IRTU update to add supervisory control of s26 and s30 | 8 Hours
Daily |
|
01-Aug-18 17:01 | 02-Aug-18 19:00 | ATCO | RB | 7L172 (739s Edith Lake - 743s Sarah Lake),7L55 (809s Louise Creek - 743s Sarah Lake) | remove bypass between 7L172 and 7L55 | 25.98 Hours
Daily |
|
02-Aug-18 07:00 | 03-Aug-18 15:30 | ATCO | Outage | 2075s ACF22 (2075s Newell) | filter bank maintenance & inspection | 1.35 Days
Continuous |
|
02-Aug-18 07:00 | 03-Aug-18 15:30 | ALTALINK | IO | A2075s ACF12 ATCO Info | ATCO filter bank maintenance & inpsection | 1.35 Days
Continuous |
|
02-Aug-18 07:30 | 03-Aug-18 17:30 | ALTALINK | Outage | 708L (233s Beamer - 708L88N),708L89 (708L) - Advice | 708L Bypass Cutover/ Create Open Points 'C' & 'D' | 1.42 Days
Daily |
|
02-Aug-18 07:30 | 02-Aug-18 16:30 | ALTALINK | IO | 2.83L Enmax - Info | SF6 Gas sample 13B138-2.83 | 9 Hours
Daily |
|
02-Aug-18 07:30 | 10-Aug-18 17:30 | ALTALINK | RB | 708L (71s Lamoureux - 233s Beamer) | connecting/removing temporary bypass; removing old switches 708L88N & 708L88X | 8.42 Days
Daily |
|
02-Aug-18 08:00 | 02-Aug-18 16:00 | ENMAX | Outage | 2.83L (ENMAX 13 - 2.83L tap),ENMAX 13 B138-2.83 (ENMAX 13),2.83L. 13s Portion. 13B138-2.83 | SF6 Gas sample 13B138-2.83 | 8 Hours
Continuous |
|
02-Aug-18 08:00 | 02-Aug-18 17:00 | ATCO | TE | 863S Paintearth,755S Cordel,9L948 (650s Hansman Lake - 863s Paintearth),9L953 (574s Nilrem - 755s Cordel) | cutover protection to new MPLS one channel at a time | 9 Hours
Continuous |
|
02-Aug-18 13:00 | 02-Aug-18 17:00 | ALTALINK | TE | 107s Westfield RTU/SCADA | MDS radio maintenance, supervisory outage at 107s during radio maintenance (1 hr) | 4 Hours
Daily |
|
02-Aug-18 17:00 | 29-Aug-18 10:00 | ALTALINK | Outage | 358s T1 (358s Amoco Brazeau) | transformer maintenance, insulator replacement, arrestor replacement, adding and test controls during re-energization switching | 26.71 Days
Continuous |
|
03-Aug-18 17:30 | 09-Aug-18 08:30 | ALTALINK | Outage | 708L (233s Beamer - 708L88N) | salvaging old switches 708L88X & 708L88N | 5.63 Days
Continuous |
This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein. © 2009 Alberta Electric System Operator. All rights reserved |