Long Range Significant Transmission Outages for the period of 24 months starting 2018-06-09 | |
The table below contains the significant transmission outages submitted as tentative to the AESO. These Outages have not yet necessarily been approved, but are listed for awareness and coordination purposes. An Outage has been considered significant for this table if it meets any one (1) or more of the following criteria: |
|
|
|
Note: Where a transmission outage requires generation curtailments, the adjustments to generation will typically happen in the hours before the scheduled transmission outage and in the hour after the element is returned to service. | |
Previous Version | |
Download CSV | |
Owner | From | To | Duration | Element | Scheduled Activity | Affected Intertie |
---|---|---|---|---|---|---|
ALTALINK | 09-May-18 11:30 | 11-Aug-18 17:00 | 94.23 Days
Continuous |
902L (19s Wabamun - 310p Sundance) | emergency safety requirement | |
BCH | 22-May-18 09:00 | 15-Jun-18 17:00 | 24.33 Days
Continuous |
5L72 (Mica Creek - Nicola) | conductor spacer replacement | AB-BC |
ALTALINK | 29-May-18 07:00 | 12-Jun-18 18:00 | 14.46 Days
Continuous |
510s 2852 (510s Sunnybrook) | installing foundation for new 510s2952 and associated equipment | |
SUNCOR | 31-May-18 09:00 | 21-Jun-18 18:00 | 21.38 Days
Continuous |
29PL6-7 (836s Steepbank - 29EDD-5 29Edd-5),29EDD-5 29Edd-5 | 5 year maintenance | |
Syncrude | 04-Jun-18 08:00 | 10-Jun-18 18:00 | 6.42 Days
Continuous |
Mildred T3 (Syncrude Mildred Lake),Mildred_335 (Syncrude Mildred Lake) | transformer inspection/ oil leak repair | |
BCH | 05-Jun-18 09:00 | 15-Jun-18 17:00 | 10.33 Days
Continuous |
2L294 (Nelway - A.A. Lambert) | replacement of defective insulators - BC maintenance does not affect AB ATC | AB-BC |
CENOVUS | 06-Jun-18 07:00 | 13-Jun-18 18:00 | 7.46 Days
Continuous |
539s PCB_9202 (539s Sunday Creek) | insulator testing | |
CENOVUS | 06-Jun-18 07:00 | 13-Jun-18 18:00 | 7.46 Days
Continuous |
539s PCB_9203 (539s Sunday Creek) | insulator testing | |
CENOVUS | 06-Jun-18 07:00 | 13-Jun-18 18:00 | 7.46 Days
Continuous |
539s 9201T (539s Sunday Creek) | insulator testing | |
EPCOR, ALTALINK | 09-Jun-18 09:00 | 09-Jun-18 17:00 | 8 Hours
Continuous |
908L @ Petrolia - Ellerslie,908L (89s Ellerslie - 816s Petrolia) | Doble | |
ALTALINK | 11-Jun-18 09:30 | 14-Jun-18 17:00 | 3.31 Days
Continuous |
77s Sagitawah 138 kV East Bus,77s Sagitawah 240 kV East Bus,77s 29 (77s Sagitawah),77s 40 (77s Sagitawah),77s 57 (77s Sagitawah),77s 652 (77s Sagitawah),77s 752 (77s Sagitawah),77s T2 (77s Sagitawah) | Protection upgrade | |
ALTALINK | 11-Jun-18 10:30 | 14-Jun-18 13:00 | 3.1 Days
Continuous |
1002L (163s-275s) - Advice,1002L (275s Jenner - 163s Amoco Empress) | Replace 2 Phase of PT for 163s22 | |
ALTALINK | 11-Jun-18 10:30 | 14-Jun-18 19:00 | 3.35 Days
Continuous |
19s T10 & 240kV Buses - GOI,19s T10 (19s Wabamun) | Replace 905L Post Insulators and 19s97 Pantagraph Switch. Entire 240kV Buses outage required due to proximately clearance etc... | |
ALTALINK | 11-Jun-18 13:00 | 14-Jun-18 17:00 | 3.17 Days
Continuous |
935L (324s Cassils - 356s Milo) | SCADA system upgrade | |
Syncrude | 12-Jun-18 08:00 | 12-Jun-18 18:00 | 10 Hours
Continuous |
Aurora T-11 | replace metering PT | |
ATCO | 13-Jun-18 07:00 | 13-Jun-18 19:00 | 12 Hours
Continuous |
844S T1 FEEDER,844S T2 FEEDER | maintenance | |
SUNCOR | 14-Jun-18 08:00 | 15-Jun-18 17:00 | 1.38 Days
Continuous |
635PT-1000 (635EDD-1000),635PL9-1000 (2005s Secord - 635EDD-1000) | troubleshoot the transformer alarms | |
EPCOR | 16-Jun-18 05:30 | 17-Jun-18 18:00 | 1.52 Days
Continuous |
1055L (816s Petrolia - 629s Argyll Transfer Station) | Washing Program | |
EPCOR | 18-Jun-18 07:00 | 18-Jun-18 17:00 | 10 Hours
Continuous |
Poundmaker 2401 (Poundmaker) | Maint | |
Syncrude | 18-Jun-18 08:00 | 24-Jun-18 18:00 | 6.42 Days
Continuous |
Aurora T1 | 5 year maintenance | |
ALTALINK | 18-Jun-18 08:30 | 19-Jun-18 18:00 | 1.4 Days
Continuous |
514L (396s-322s-513s) GOI,514BL (322s Cowley Ridge Wind Plant - 514L tap),514L (396s Pincher Creek - 514BL tap),514L (513s Lundbreck - 514L198) | Place new 396s514N breaker and install LA's | |
BCH | 18-Jun-18 09:00 | 06-Jul-18 17:00 | 18.33 Days
Continuous |
5L71 (Mica Creek - Nicola) | Annual Plan Request F19 | AB-BC |
ATCO | 18-Jun-18 10:00 | 22-Jun-18 14:00 | 4.17 Days
Continuous |
959S SVC (959s Lanfine) | SVC warranty repair work- GE Repairs/Modifications, SVC will not be available for duration of outage | |
ALTALINK | 18-Jun-18 10:30 | 28-Jun-18 08:30 | 9.92 Days
Daily |
163s T1 (163s Amoco Empress),163s T1 TX18483- GOI | Replace T1 A/B Protections | |
ALTALINK | 18-Jun-18 13:00 | 21-Jun-18 17:00 | 3.17 Days
Continuous |
1052L (28s West Brooks - 324s Cassils) | SCADA system upgrade | |
EPCOR | 19-Jun-18 07:00 | 19-Jun-18 17:00 | 10 Hours
Continuous |
Poundmaker 2402 (Poundmaker) | Maint | |
ATCO | 19-Jun-18 07:00 | 21-Jun-18 17:00 | 2.42 Days
Continuous |
7L702 (137s Sedgewick - 757s Battle River),757S 708 | Install and test transfer trip from Altalink | |
BCH | 19-Jun-18 09:00 | 21-Jun-18 17:00 | 2.33 Days
Continuous |
2L293 (Selkirk - Nelway) | Placeholder for Annual Plan Request F19 | AB-BC |
ALTALINK | 19-Jun-18 09:30 | 21-Jun-18 16:00 | 2.27 Days
Continuous |
603L (138s Windy Flats - 243s Soderglen Wind Farm),608L (138s Windy Flats - 418s Ardenville - 528s Blue Trail Wind Farm),138S T2 (138s Windy Flats),138s 138 kV Bus 2 GOI | Upgrade station service for arc flash. | |
ALTALINK | 19-Jun-18 17:00 | 21-Jun-18 18:00 | 2.04 Days
Continuous |
514L (396s Pincher Creek - 514BL tap),396s 514N (396s Pincher Creek),396s514N GOI | Replace breaker, and add LA’s | |
EPCOR | 20-Jun-18 07:00 | 20-Jun-18 17:00 | 10 Hours
Continuous |
Poundmaker 2403 (Poundmaker) | Maint | |
ATCO | 20-Jun-18 07:00 | 21-Jun-18 17:00 | 1.42 Days
Continuous |
6L126 (515L tap - 743s Sarah Lake),6L11,6L96,743S 600BS2,743S 600BS1 | Replace insulators and bus PT's, Switch maintenance | |
ATCO | 20-Jun-18 11:00 | 20-Jun-18 17:00 | 6 Hours
Continuous |
741S 701,7L90 (813s Little Smoky - 741s Fox Creek) | Top up low SF6 on One Pole, if pole gets much lower it will alarm, If too low it will go to lockout and block operation. | |
EPCOR | 21-Jun-18 07:00 | 21-Jun-18 17:00 | 10 Hours
Continuous |
Poundmaker 2404 (Poundmaker) | Maint | |
ALTALINK | 21-Jun-18 16:00 | 21-Jun-18 17:00 | 60 Mins
Daily |
514L (396s Pincher Creek - 514BL tap),185L (396s Pincher Creek - 379s Shell Canada Waterton),396s 69kV Bus De-energize (T1,185L,514 | Open 396s 69kV bus breakers to remotely test energize new 396s514N breaker | |
ALTALINK | 21-Jun-18 16:00 | 21-Jun-18 18:00 | 2 Hours
Daily |
38s 18 (38s East Edmonton),38s T4 (38s East Edmonton),38s17 (38s18 brkr) Advice | Trip test from 3552 breaker fail | |
ATCO | 22-Jun-18 08:00 | 22-Jun-18 12:00 | 4 Hours
Continuous |
959S SVC (959s Lanfine) | Lanfine SVC - system tests | |
ALTALINK, EPCOR | 23-Jun-18 07:00 | 24-Jun-18 18:00 | 1.46 Days
Continuous |
1056L (89s Ellerslie - 629s Argyll Transfer Station) | Washing Program | |
EPCOR | 25-Jun-18 07:00 | 29-Jun-18 17:00 | 4.42 Days
Continuous |
805s T3 (805s Jasper) | Doble | |
ATCO | 25-Jun-18 07:00 | 29-Jun-18 18:00 | 4.46 Days
Continuous |
9L913 (69s North Barrhead - 732s Mitsue) | Cutting over to a temporary section of 9L913 line to allow rebuilding of current section of line due to 12L41 500KV right-of-way requirements. | |
ATCO | 25-Jun-18 10:00 | 28-Jun-18 15:00 | 3.21 Days
Continuous |
932S 901T,932s 901T (932s Pemukan) | 932S - 901T Leak Repairs | |
ALTALINK | 25-Jun-18 12:00 | 26-Jun-18 17:00 | 29 Hours
Continuous |
28s T2 (28s West Brooks),28s T2(Tx 18775) GOI | Urgent trouble corrective:change qualitrol. | |
ALTALINK, ENMAX | 25-Jun-18 12:00 | 28-Jun-18 16:00 | 3.17 Days
Continuous |
74s23.80 GOI,23.80L (74s Janet - ENMAX 23),74s 23.80W (74s Janet) | Maintain 138kV minimum oil breaker S&S HPF. | |
ALTALINK | 25-Jun-18 13:00 | 28-Jun-18 17:00 | 3.17 Days
Continuous |
1034L (324s - 244s) Advice,1034L (244s Bowmanton - 324s Cassils) | SCADA system upgrade | |
ALTALINK | 26-Jun-18 07:30 | 26-Jun-18 10:00 | 2.5 Hours
Daily |
17s 4 (17s Benalto),17s4 & 17s34 - Advice | Apply voltage settings threshold for the 17s3 breaker | |
ALTALINK | 26-Jun-18 08:00 | 26-Jun-18 12:45 | 4.75 Hours
Daily |
76L (115s Mt. Allan - 33s Spray),76L (115s - 33s) GOI | plates on all three dead ends to be replaced (76L dead ends at 115s) | |
ALTALINK | 26-Jun-18 10:00 | 26-Jun-18 12:30 | 2.5 Hours
Daily |
17s3 & 17s23 - Advice,17s 3 (17s Benalto) | Apply voltage settings threshold for the 17s3 breaker | |
ALTALINK | 26-Jun-18 12:30 | 26-Jun-18 14:30 | 2 Hours
Daily |
17s 5 (17s Benalto),17s5 & 17s35 - Advice | Apply voltage settings threshold for the 17s5 breaker | |
ALTALINK | 26-Jun-18 14:30 | 26-Jun-18 17:00 | 2.5 Hours
Daily |
17s6 & 17s26 - Advice,17s 6 (17s Benalto) | Apply voltage settings threshold for the 17s5 breaker | |
ALTALINK | 27-Jun-18 07:00 | 13-Jul-18 18:00 | 16.46 Days
Continuous |
708L (233s Beamer - 708L88N),708L (233s - 708L88N) - GOI | Installing new switch 708L89 | |
ALTALINK | 27-Jun-18 08:00 | 27-Jun-18 10:00 | 2 Hours
Daily |
760L (163s-394s)- GOI,163s 760X (163s Amoco Empress),760L (394s Empress - 163s Amoco Empress) | Trip Test 163s760X Required for T1 Protection Replacement | |
ALTALINK | 27-Jun-18 08:30 | 28-Jun-18 12:00 | 27.5 Hours
Continuous |
103s T1 (103s Goose Lake),103s T1(Tx 18776) GOI | Urgent trouble corrective:change qualitrol. | |
ALTALINK | 27-Jun-18 09:30 | 27-Jun-18 17:00 | 7.5 Hours
Daily |
17s4 - GOI,17s 4 (17s Benalto) | Fix Sync Check Function for 17s4 breaker | |
ALTALINK | 27-Jun-18 10:00 | 27-Jun-18 12:00 | 2 Hours
Daily |
760L (163s Amoco Empress - 760L41),163s 760N (163s Amoco Empress),760L (163s-A767s)- GOI | Trip Test 163s760N Required for T1 Protection Replacement | |
ALTALINK | 28-Jun-18 08:30 | 28-Jun-18 14:00 | 5.5 Hours
Daily |
163s Partial Bus & T1/T5 - GOI,163s T1 (163s Amoco Empress),163s T5 (163s Amoco Empress) | Perform Trip Tests for 163s1252, 163s1552, 163s189 Required for T1 Protection Replacement | |
ALTALINK | 29-Jun-18 07:00 | 30-Jun-18 18:00 | 1.46 Days
Continuous |
847L (602s Cold Creek - 406s Fickle Lake),847L (406s-602s) GOI | 847L Transmission Line Outage for 492L1 Bypass Structure tie- in with 847L. | |
EPCOR | 03-Jul-18 07:00 | 03-Jul-18 17:00 | 10 Hours
Continuous |
1058L (657s Summerside - 803s Lambton) | Maint | |
ALTALINK | 03-Jul-18 07:00 | 03-Jul-18 18:00 | 11 Hours
Daily |
729L (542s Ervick - 729L13A) | Installing bird diverters on two spans of OHSW between Structures #138 - #140 | |
ENMAX, ALTALINK | 03-Jul-18 08:00 | 03-Jul-18 16:00 | 8 Hours
Continuous |
24.83L (74s Janet - ENMAX 24) | SF6 gas sample 24B138-24.83L, Doble 24B138-24.83L | |
EPCOR | 04-Jul-18 07:00 | 04-Jul-18 17:00 | 10 Hours
Continuous |
803s L2403 (803s Lambton),L2403BKR @ Lambton | Maint | |
ALTALINK | 04-Jul-18 11:00 | 05-Jul-18 15:00 | 28 Hours
Continuous |
277s T1 (277s Hayter),748L (267s Killarney Lake - 277s Hayter) | 138kV HGF SF6 gas breaker maintenance @ both ends of 748L | |
EPCOR | 05-Jul-18 07:00 | 05-Jul-18 17:00 | 10 Hours
Continuous |
L2405BKR @ Lambton,803s L2405 (803s Lambton) | Maint | |
ALTALINK, EPCOR | 06-Jul-18 07:00 | 06-Jul-18 17:00 | 10 Hours
Continuous |
1059L (38s East Edmonton - 803s Lambton) | Maint | |
ALTALINK, EPCOR | 06-Jul-18 07:00 | 09-Jul-18 17:00 | 3.42 Days
Continuous |
1044L (805s Jasper - 816s Petrolia) | Steel Pole Refurbishment | |
Syncrude | 06-Jul-18 09:00 | 07-Jul-18 20:00 | 1.46 Days
Continuous |
RL1 (848s Ruth Lake - D05 Syncrude) | install marker balls at the highway-63 crossing | |
ALTALINK, EPCOR | 08-Jul-18 08:00 | 08-Jul-18 18:00 | 10 Hours
Daily |
1056L (89s Ellerslie - 629s Argyll Transfer Station),89s1056 (Affecting 1056L) GOI | 89s1056 36deg and 45deg Hot Spots | |
Syncrude | 08-Jul-18 09:00 | 09-Jul-18 20:00 | 1.46 Days
Continuous |
RL2 (848s Ruth Lake - D05 Syncrude) | install marker balls at the highway-63 crossing | |
EPCOR | 09-Jul-18 07:00 | 13-Jul-18 17:00 | 4.42 Days
Continuous |
987s T4 (987s Clover Bar),TX4@Cloverbar | Doble | |
ATCO | 09-Jul-18 08:00 | 12-Jul-18 17:00 | 3.38 Days
Continuous |
7L702 (137s Sedgewick - 757s Battle River) | Change Arms and Insulators on 7L702 | |
ALTALINK | 09-Jul-18 09:15 | 12-Jul-18 17:45 | 3.35 Days
Continuous |
925L (63s Red Deer - 74s Janet),925L (63s - 74s) GOI | Maintenance Components (Str 117-404) | |
ALTALINK | 09-Jul-18 09:30 | 11-Jul-18 17:30 | 2.33 Days
Continuous |
510s ACF 11 GOI,510s ACF11 (510s Sunnybrook) | Outage and GOI required to inspect the Filter Bank | |
ALTALINK, ATCO | 09-Jul-18 13:00 | 12-Jul-18 17:00 | 3.17 Days
Continuous |
1087L (324s - A2075s) Advice,1087L (324s Cassils - 2075s Newell) | SCADA system upgrade (line differential protections be disabled for the duration) | |
ATCO | 10-Jul-18 08:00 | 11-Jul-18 16:00 | 1.33 Days
Continuous |
963s 901 (963s Coyote Lake),9L29 (946s Oakland - 963s Coyote Lake) | 963S Coyote 901CT Ratio Change Project CT Ration & Relay Settings Changes on equipment Associated with 901CT and 50BF/901 Relay |
|
ALTALINK | 11-Jul-18 12:30 | 13-Jul-18 15:30 | 2.13 Days
Continuous |
510s ACF12 (510s Sunnybrook),510s ACF 12 GOI | Outage and GOI required to inspect the Filter Bank | |
EPCOR | 13-Jul-18 07:00 | 13-Jul-18 17:00 | 10 Hours
Continuous |
Bus 2 240KV @ Cloverbar,987s C2405 (987s Clover Bar),987s C2406 (987s Clover Bar),987S Clover Bar 240 kV Bus 2,987s T2 (987s Clover Bar) | Doble | |
ALTALINK, EPCOR | 13-Jul-18 07:00 | 16-Jul-18 17:00 | 3.42 Days
Continuous |
1045L (310p Sundance - 805s Jasper) | Steel Pole Refurbishment | |
EPCOR | 16-Jul-18 07:00 | 16-Jul-18 17:00 | 10 Hours
Continuous |
240BA3 (814s Bellamy - 629s Argyll Transfer Station),1055L (816s Petrolia - 629s Argyll Transfer Station),BA3/1055L @ Argyl | Doble | |
ATCO | 16-Jul-18 07:00 | 18-Jul-18 15:30 | 2.35 Days
Continuous |
2075S ACF11,2075s ACF11 (2075s Newell) | Maintenance on the 901T 240KV transformer, and inspections of ACF11, SVC2 will be in service. | |
ATCO | 16-Jul-18 07:00 | 18-Jul-18 15:30 | 2.35 Days
Continuous |
2029s ACF14 (2029s Heathfield) | ACF 14 Shunt reactor inspection & testing. | |
ALTALINK | 16-Jul-18 08:00 | 16-Jul-18 16:00 | 8 Hours
Continuous |
932L (74s Janet - 162s Beddington) | Repair SW144 | |
ATCO | 16-Jul-18 08:00 | 19-Jul-18 17:00 | 3.38 Days
Continuous |
7L702 (137s Sedgewick - 757s Battle River) | Change Arms and Insulators on 7L702 | |
ALTALINK | 16-Jul-18 09:30 | 20-Jul-18 17:00 | 4.31 Days
Continuous |
510s ACF14 (510s Sunnybrook),510s ACF 14 GOI | Outage and GOI required to inspect the Filter Bank | |
ALTALINK | 16-Jul-18 11:00 | 26-Jul-18 16:00 | 10.21 Days
Continuous |
1112L (289s Saunders Lake - 89s Ellerslie),89s 1452 (89s Ellerslie),89s 1552 (89s Ellerslie) | 89s1452 Breaker Replacement, 89s81 PT Replacement | |
ALTALINK | 16-Jul-18 13:00 | 19-Jul-18 17:00 | 3.17 Days
Continuous |
1088L (324s - A2075s) Advice,1088L (324s Cassils - 2075s Newell) | SCADA system upgrade (line differential protections be disabled for the duration) | |
EPCOR, ALTALINK | 17-Jul-18 07:00 | 17-Jul-18 17:00 | 10 Hours
Continuous |
920L @ Castledowns / North Calder,920L (37s North Calder - 557s Castle Downs) | Doble | |
ALTALINK | 17-Jul-18 07:00 | 26-Jul-18 18:00 | 9.46 Days
Continuous |
708L (71s Lamoureux - 708L88X) | New airbrake to be installed next to old. | |
ALTALINK | 17-Jul-18 08:00 | 17-Jul-18 16:00 | 8 Hours
Continuous |
788L/788AL/602L/789L (157s - 140s - A898,788L (898s Heart Lake - 788L107A - 602L1),788L (157s Lac La Biche - 898s Heart Lake),789L (818s Winefred - 898s Heart Lake) | Adjusting 788L107A and 788L106B | |
BCH | 17-Jul-18 09:00 | 19-Jul-18 17:00 | 2.33 Days
Continuous |
2L113 (B1s Natal - B2s Cranbrook) | Placeholder for Annual Plan Request F19 | AB-BC |
ALTALINK | 18-Jul-18 07:00 | 18-Jul-18 18:00 | 11 Hours
Daily |
788L (788L Tap - 898s Heart Lake),788L(788L107A - A898s) and 602L/789L - G | Adjusting 602LA1 and OHSW @ Structure 788L277 | |
ALTALINK | 18-Jul-18 09:00 | 18-Jul-18 15:00 | 6 Hours
Daily |
103s T1 (103s Goose Lake),103s 240kV Bus 1 GOI | Install voltage test leads on 240kV bus | |
ATCO | 19-Jul-18 07:00 | 20-Jul-18 15:30 | 1.35 Days
Continuous |
2075S ACF12,2075s ACF12 (2075s Newell) | Filter Bank Maintenance and Inspection, ACF12 will be out of service during outage, One A type filter needs to be available at all times so we will lose redundancy when ACF12 is out of service. ACF 22 will still be available. Power Cap will be at 1000 MW @ 500 kV when only one A type filter is available. | |
ATCO | 19-Jul-18 07:00 | 20-Jul-18 15:30 | 1.35 Days
Continuous |
2029s ACF13 (2029s Heathfield) | Filter Bank Maintenance and Inspection, redundant filter banks in service, no system impact | |
EPCOR | 20-Jul-18 07:00 | 23-Jul-18 17:00 | 3.42 Days
Continuous |
1098L (805s Jasper - Poundmaker) | Steel Pole Refurbishment | |
EPCOR | 22-Jul-18 07:00 | 22-Jul-18 17:00 | 10 Hours
Continuous |
Bus1 VT @ Rossdale,814s T1 (814s Bellamy),72RS5 (Rossdale - Strathcona),72RV6 (Rossdale - 511s Victoria) | Doble | |
ATCO | 23-Jul-18 07:00 | 24-Jul-18 15:30 | 1.35 Days
Continuous |
2029s ACF11 (2029s Heathfield) | Filter Bank Maintenance and Inspection, redundant filter banks in service, no system impact | |
ATCO | 23-Jul-18 07:00 | 24-Jul-18 15:30 | 1.35 Days
Continuous |
2075s ACF13 (2075s Newell) | Filter bank inspection/maintenance, redundant filters will remain in service | |
ATCO | 23-Jul-18 08:00 | 26-Jul-18 17:00 | 3.38 Days
Continuous |
7L702 (137s Sedgewick - 757s Battle River) | Change Arms and Insulators on 7L702 | |
ALTALINK | 23-Jul-18 09:15 | 27-Jul-18 17:45 | 4.35 Days
Continuous |
754L (437s - 754L75) GOI,754L (437s Baymag - 754L72) | Structure Replacements (Str 82-90) | |
ALTALINK | 23-Jul-18 10:00 | 26-Jul-18 16:00 | 3.25 Days
Continuous |
87s T1 (87s Gaetz),914L (87s Gaetz - 63s Red Deer),87s 552 (87s Gaetz),87s 152 (87s Gaetz),87s 952 (87s Gaetz),87s 1652 (87s Gaetz),87s 240kV & 138kV West Buses - GOI | Replace A87/240BW Protection and perform test trips to 87s2352, 87s1652, 87s952, 87s552, & 87s152 | |
ALTALINK | 23-Jul-18 12:30 | 25-Jul-18 14:30 | 2.08 Days
Continuous |
338s 252 (338s Cherhill),338s252 GOI | 338s252 maintenance | |
ALTALINK | 23-Jul-18 13:00 | 26-Jul-18 16:00 | 3.13 Days
Continuous |
974L (39s Bickerdike - 310p Sundance) | Migrate and commission all L1 - 974L at 310P Sundance associated line protections, breakers, breaker fail and Tele-protection alarms, status, controls, metering and remote access to new RTU and LAN. Migrate and commission CVT-L1 alarms. | |
ALTALINK | 23-Jul-18 13:00 | 26-Jul-18 17:00 | 3.17 Days
Continuous |
1051L (28s West Brooks - 324s Cassils) | SCADA system upgrade | |
ALTALINK | 23-Jul-18 13:30 | 26-Jul-18 16:00 | 3.1 Days
Continuous |
562s T2 (TX18774) - GOI,562s T2 (562s Cypress) | Maintain, doble, SFRA and investigate alarm on T2. | |
ATCO | 25-Jul-18 07:00 | 26-Jul-18 15:30 | 1.35 Days
Continuous |
2029s ACF12 (2029s Heathfield) | Filter Bank Maintenance and Inspection, redundant filter banks in service, no system impact | |
ATCO | 25-Jul-18 07:00 | 26-Jul-18 15:30 | 1.35 Days
Continuous |
2075s ACF14 (2075s Newell) | Filter bank inspection/maintenance, No redundancy for type C filter. ACF24 will still be available | |
ATCO | 30-Jul-18 07:00 | 31-Jul-18 15:30 | 1.35 Days
Continuous |
2029s ACF22 (2029s Heathfield) | Filter Bank Maintenance and Inspection, redundant filter banks in service, no system impact | |
ATCO | 30-Jul-18 07:00 | 01-Aug-18 15:30 | 2.35 Days
Continuous |
2075s ACF21 (2075s Newell) | ACF21/902T inspections/maintenance, SVC1 will remain in service. | |
SUNCOR | 30-Jul-18 09:00 | 17-Aug-18 18:00 | 18.38 Days
Continuous |
29PL9-14 (29EDD-56 - 29EDD-34),29EDD-34 Edd34Sub | 5 year maintenance on breakers, bus CT and switches | |
ALTALINK | 30-Jul-18 09:15 | 03-Aug-18 17:45 | 4.35 Days
Continuous |
754L (437s - 754L75) GOI,754L (437s Baymag - 754L72) | Structure Replacements (Str 82-90) | |
ALTALINK, EPCOR | 30-Jul-18 09:30 | 02-Aug-18 16:30 | 3.29 Days
Continuous |
921L (71s Lamoureux - 987s Clover Bar),71s 1352 (71s Lamoureux),71s 1252 (71s Lamoureux) | Replace PT's | |
ALTALINK | 30-Jul-18 10:00 | 02-Aug-18 16:00 | 3.25 Days
Continuous |
87s T2 (87s Gaetz),87s 1252 (87s Gaetz),87s 1052 (87s Gaetz),87s 852 (87s Gaetz),87s 252 (87s Gaetz),87s 2352 (87s Gaetz),914L (86s Bigstone - 87s Gaetz),87s 240kV & 138kV East Buses - GOI | Replace A87/240BE protection and perform test trips to 87s2352, 87s1252, 87s1052, 87s852, & 87s252 | |
ALTALINK | 30-Jul-18 12:15 | 30-Jul-18 17:00 | 4.75 Hours
Daily |
708L (233s Beamer - 708L88N),708L89 (708L) - Advice | 708L Bypass Cutover/ Create Open Points 'C' & 'D' | |
ALTALINK | 30-Jul-18 17:00 | 07-Aug-18 13:00 | 7.83 Days
Continuous |
708L (233s Beamer - 708L88N),708L (233s - Open 'C' - Open 'D') - GOI | Salvaging old switches 708L88X & 708L88N | |
ATCO | 01-Aug-18 07:00 | 02-Aug-18 13:30 | 30.5 Hours
Continuous |
2029s ACF23 (2029s Heathfield) | Filter Bank Maintenance and Inspection, redundant filter banks in service, no system impact | |
ATCO | 02-Aug-18 07:00 | 03-Aug-18 15:30 | 1.35 Days
Continuous |
2075s ACF12 (2075s Newell) | Filter Bank Maintenance and Inspection, One A type filter needs to be available at all times so we will lose redundancy when ACF22 is out of service. ACF 12 will still be available. Power Cap will be at 1000 MW @ 500 kV when only one A type filter is available. | |
BCH | 03-Aug-18 09:00 | 12-Sep-18 17:00 | 40.33 Days
Continuous |
5L71 (Mica Creek - Nicola) | Placeholder for MCA Switchgear Roof Replacement | AB-BC |
ATCO | 06-Aug-18 07:00 | 07-Aug-18 15:30 | 1.35 Days
Continuous |
2029s ACF21 (2029s Heathfield) | Filter Bank Maintenance and Inspection, redundant filter banks in service, no system impact | |
ENMAX | 06-Aug-18 08:00 | 17-Aug-18 16:00 | 11.33 Days
Continuous |
162s 138_RB94 (162s Beddington),162s 138-RB86 (162s Beddington),162s 240-RB131 (162s Beddington),162s 240-RB134 (162s Beddington),162s 138-RB80 (162s Beddington),162.1TR (ENMAX 162s Beddington) | HV SW MD 162MD240-162.1TR. Oil sampling H,X bushings. Doble 162PT138-T1. Transformer maintenance, LTC inspection. SF6 gas sample RB131, RB134. Dashpot checks RB131, RB134, RB80, RB84.Gas relay testing. Upgrade T60 setting | |
BCH | 06-Aug-18 09:00 | 10-Aug-18 17:00 | 4.33 Days
Continuous |
2L294 (Nelway - A.A. Lambert) | Placeholder for Annual Plan Request F19 - BC maintenance does not affect AB ATC | AB-BC |
ATCO | 07-Aug-18 07:00 | 08-Aug-18 15:30 | 1.35 Days
Continuous |
2075s ACF23 (2075s Newell) | Filter bank inspection/maintenance, redundant filter ACF13 (B filter) will remain available | |
ALTALINK, TRANSALTAEM | 07-Aug-18 07:00 | 09-Aug-18 18:00 | 2.46 Days
Continuous |
724L (724L0B - I_WAP - 500s) - GOI,724AL (WAP-7L1 - 724AL),724L (500s Flatbush - 724L1) | Component replacement | |
ALTALINK | 07-Aug-18 13:00 | 07-Aug-18 17:30 | 4.5 Hours
Daily |
708L (233s Beamer - 708L88N),708L89 (708L) - Advice | Closing Open Points 'C' & 'D' and cutting the temporary bypass free | |
ALTALINK | 08-Aug-18 07:15 | 16-Aug-18 17:45 | 8.44 Days
Continuous |
754L (245s Seebe - 754L65A),754L (245s - 754L65A) GOI | Structure Replacements (Str 34-64) | |
ALTALINK | 08-Aug-18 09:00 | 08-Aug-18 15:00 | 6 Hours
Daily |
103s T1 (103s Goose Lake),103s 240kV Bus 1 GOI | Remove voltage test leads from 240kV bus | |
ATCO | 09-Aug-18 07:00 | 10-Aug-18 15:30 | 1.35 Days
Continuous |
2075s ACF24 (2075s Newell) | Filter bank inspection/maintenance, No redundancy of Type C filter during outage. ACF14 will still be available. | |
ALTALINK | 13-Aug-18 07:30 | 14-Aug-18 17:30 | 1.42 Days
Continuous |
804L (86s Bigstone - 40s Wetaskiwin),805L (964s Pigeon Lake - 86s Bigstone),86s T1 (86s Bigstone) | Replace failed PT | |
ATCO | 13-Aug-18 09:00 | 26-Aug-18 18:00 | 13.38 Days
Continuous |
840S McNeill Station | 2018 McNeill Fall T/A. Arrestor install and Bird Proofing | AB-SK |
ALTALINK | 13-Aug-18 09:30 | 17-Aug-18 17:30 | 4.33 Days
Continuous |
510s ACF 21 GOI,510s ACF21 (510s Sunnybrook) | Outage and GOI required to inspect the Filter Bank. Changing capacitors and inspection. | |
ALTALINK | 13-Aug-18 10:30 | 17-Aug-18 17:30 | 4.29 Days
Continuous |
410s T2 TX18133 - GOI,410s T2 (410s Josephburg) | Transformer Bushing Replacement & Maintenance Work | |
ALTALINK | 13-Aug-18 11:00 | 23-Aug-18 16:00 | 10.21 Days
Continuous |
1057L (89s Ellerslie - 657s Summerside) | 89s452 Breaker Replacement, 89s73 PT Replacement | |
BCH | 14-Aug-18 09:00 | 17-Aug-18 17:00 | 3.33 Days
Continuous |
5L96 (Selkirk - Vaseux Lake) | annual plan request F19 | AB-BC |
EPCOR | 20-Aug-18 07:00 | 21-Aug-18 17:00 | 1.42 Days
Continuous |
330p 1201 (330p Genesee) | BKR Maint | |
ENMAX | 20-Aug-18 08:00 | 31-Aug-18 16:00 | 11.33 Days
Continuous |
162.2TR (ENMAX 162 Beddington) | Tapchanger Inspection. Doble Test Transformer | |
BCH | 20-Aug-18 09:00 | 24-Aug-18 17:00 | 4.33 Days
Continuous |
5L91 (Selkirk - Ashton Creek) | annual plan request F19 | AB-BC |
BCH | 20-Aug-18 09:00 | 31-Aug-18 17:00 | 11.33 Days
Continuous |
1L274 (EFT - 1D2L274) | Annual Plan Request F19 | AB-BC |
SUNCOR | 20-Aug-18 09:00 | 07-Sep-18 18:00 | 18.38 Days
Continuous |
29EDD-34 Edd34Sub,29PL9-15 (29EDD-56 - 29EDD-34) | 5 year maintenance on breakers, bus CT and switches | |
ALTALINK | 20-Aug-18 09:15 | 24-Aug-18 17:45 | 4.35 Days
Continuous |
754L (245s - 754L65A) GOI,754L (245s Seebe - 754L65A) | Structure Replacements (Str 34-64) | |
ALTALINK | 20-Aug-18 09:30 | 22-Aug-18 12:30 | 2.13 Days
Continuous |
510s ACF 22 GOI,510s ACF22 (510s Sunnybrook) | Outage and GOI required to inspect the Filter Bank. Inspection | |
ALTALINK | 20-Aug-18 10:00 | 20-Aug-18 15:45 | 5.75 Hours
Daily |
74s T1 & 240kV Bus 1 - GOI,74s T1 (74s Janet) | Cut Open Point 'A' on 240kV Bus between 74s48 and 74s20N. Bus Required in order to replace 74s252 Ct due to proximity | |
ALTALINK | 20-Aug-18 10:00 | 24-Aug-18 15:00 | 4.21 Days
Continuous |
42s T1 TX18508 - GOI,42s T1 (42s Sarcee) | Repairs to Control Building Roof, Required due to proximity | |
ALTALINK | 20-Aug-18 11:00 | 23-Aug-18 18:00 | 3.29 Days
Continuous |
39s T2 (39s Bickerdike),39s T2 TX5778 - GOI | Replace T2 Tertiary Bushing | |
ALTALINK | 20-Aug-18 15:45 | 30-Aug-18 10:30 | 9.78 Days
Continuous |
74s T1 (74s Janet),74s T1 & 240kV Bus 1 - GOI (1) | Bus outage required in order to replace 74s252 CT due to proximity. | |
ALTALINK, EPCOR | 22-Aug-18 07:00 | 22-Aug-18 17:00 | 10 Hours
Continuous |
1238L (510s Sunnybrook - 330p Genesee),Sunnybrook | BKR Maint | |
ALTALINK | 22-Aug-18 12:30 | 23-Aug-18 17:30 | 29 Hours
Continuous |
510s ACF 13 GOI,510s ACF13 (510s Sunnybrook) | Outage and GOI required to inspect the Filter Bank. Inspection | |
EPCOR | 23-Aug-18 07:00 | 24-Aug-18 17:00 | 1.42 Days
Continuous |
330p 1203 (330p Genesee) | BKR Maint | |
BCH | 27-Aug-18 09:00 | 31-Aug-18 17:00 | 4.33 Days
Continuous |
5L92 (Cranbrook - Selkirk) | annual plan request F19 | AB-BC |
ATCO | 28-Aug-18 07:00 | 03-Sep-18 17:00 | 6.42 Days
Continuous |
800S 702,7L73 (829s Boucher Creek - 800s Friedenstal) | Upgrade 7L73 protection and install TPR and new RAS. | |
ALTALINK | 30-Aug-18 10:30 | 30-Aug-18 14:15 | 3.75 Hours
Daily |
74s T1 (74s Janet),74s T1 & 240kV Bus 1 - GOI (2) | Close Open Point 'A' on 240kV Bus between 74s48 and 74s20N. Bus. | |
ATCO, SUNCOR | 01-Sep-18 09:00 | 04-Sep-18 18:00 | 3.38 Days
Continuous |
29PL9-1 (29EDD-1 Millennium - 848s Ruth Lake),29PL9-3 (29EDD-1 Millennium - 29EDD-3) | maintenance - replacement of 29CT-5 | |
BCH | 03-Sep-18 09:00 | 07-Sep-18 17:00 | 4.33 Days
Continuous |
1L274 (EFT 1D22 - 1D3L274),1L274 (Elkford - EFT1D22) | Annual Plan Request | AB-BC |
BCH | 03-Sep-18 09:00 | 14-Sep-18 17:00 | 11.33 Days
Continuous |
5L98 (BCH Nicola - Vaseux Lake) | annual plan request F19 | AB-BC |
EPCOR | 04-Sep-18 07:00 | 26-Oct-18 17:00 | 52.42 Days
Continuous |
TX1 @ Petrolia,816s T1 (816s Petrolia) | Tap Changer & Bushing replacements | |
ATCO | 04-Sep-18 07:00 | 25-Nov-18 17:00 | 82.46 Days
Continuous |
972S 905B,972s 905B (972s Tinchebray) | 972s 905B | |
ALTALINK | 04-Sep-18 08:00 | 14-Sep-18 17:00 | 10.38 Days
Continuous |
1325L (510s Sunnybrook - 511s Crossings),511s DC yard,Valve Hall and T11 GOI,511s Crossing | Annual Inspection and Maintenance, Link will be out of service | |
ALTALINK | 04-Sep-18 08:00 | 14-Sep-18 17:00 | 10.38 Days
Continuous |
510S Sunnybrook,Valve Hall and T11 GOI,510s DC yard | Annual Inspection and Maintenance, Link will be out of service | |
ALTALINK, ATCO | 05-Sep-18 11:00 | 05-Sep-18 15:00 | 4 Hours
Daily |
953L/9L953 (574s - A755s) De-energized (,953L (574s Nilrem - 755s Cordel),9L953 (574s Nilrem - 755s Cordel) | Required for 9465R (lougheed) Tower Replacement (dynamic study) | |
SHELL, ATCO | 10-Sep-18 07:00 | 10-Sep-18 17:00 | 10 Hours
Continuous |
847s 901T (847s Muskeg River),919S 906 | Transformer protection upgrade during planned generator turnaround. | |
ALTALINK | 10-Sep-18 08:00 | 27-Sep-18 17:00 | 17.38 Days
Continuous |
62s T5 (62s Brazeau) | Protection upgrade | |
ALTALINK | 10-Sep-18 08:00 | 27-Sep-18 17:00 | 17.38 Days
Continuous |
995L (17s Benalto - 995AL tap) | Replacement of strain insulators for 995L and post insulators for 17s76, 17s77,CVT(17s78) replacement | |
ATCO | 10-Sep-18 09:00 | 14-Sep-18 17:00 | 4.33 Days
Continuous |
801s 901T (801s Anderson) | 801S Anderson 901T Re-test Sept 10, 2018 | |
BCH | 10-Sep-18 09:00 | 14-Sep-18 17:00 | 4.33 Days
Continuous |
1L274 (B1s BCH Natal - 1D1L274) | 2018 annual plan work | AB-BC |
SUNCOR | 10-Sep-18 09:00 | 21-Sep-18 18:00 | 11.38 Days
Continuous |
260kV bus 29PP-45 (29EDD-34) | 5 year maintenance on 29PP-45 bus | |
BCH | 11-Sep-18 09:00 | 11-Sep-18 17:00 | 8 Hours
Continuous |
2L113 (B1s Natal - B2s Cranbrook),1L274 (B1s BCH Natal - 1D1L274) | Placeholder for Annual Plan Request F19 | AB-BC |
EPCOR | 17-Sep-18 07:00 | 21-Sep-18 17:00 | 4.42 Days
Continuous |
TX1 @ Jasper,72JM18 (805s Jasper - Meadowlark),72JW19 (805s Jasper - Woodcroft),805s T1 (805s Jasper) | Doble | |
ALTALINK, EPCOR | 17-Sep-18 07:00 | 29-Sep-18 18:00 | 12.46 Days
Continuous |
510s 2852 (510s Sunnybrook),510s2852 and 510s3052 (1238L) - GOI,1238L (510s Sunnybrook - 330p Genesee) | Installing new 510s2952, CT's, 510s46, 510s48 and protection/breaker fail mods | |
MONTANA | 17-Sep-18 09:00 | 27-Sep-18 18:00 | 10.38 Days
Continuous |
MATL (120s Picture Butte - Montana) | align with 1201L outage | AB-MATL |
ALTALINK | 17-Sep-18 09:00 | 27-Sep-18 18:00 | 10.38 Days
Continuous |
1201L (520s Bennett - BCH Cranbrook) | Maintenance Components | AB-BC |
ATCO | 18-Sep-18 07:00 | 25-Sep-18 17:00 | 7.42 Days
Continuous |
7L75 (A793s West Peace River - 800s Friedenstal) | Upgrade 7L75 protection and install new TPR and RAS | |
ALTALINK, Lethbridge | 18-Sep-18 08:00 | 04-Oct-18 14:00 | 16.25 Days
Continuous |
813L (241s Lethbridge Uplands - 146s Lethbridge MacDonald),667L (370s North Lethbridge - 146s Lethbridge MacDonald) | Replace 138kv motorized airbreak | |
ATCO | 24-Sep-18 08:00 | 28-Sep-18 15:00 | 4.29 Days
Continuous |
9L46 (932s Pemukan - 959s Lanfine) | GOI to complete the OPGW repair. on 9L46
STUDY DUE AUGUST 14 2018 |
|
ALTALINK | 24-Sep-18 08:00 | 11-Oct-18 17:00 | 17.38 Days
Continuous |
163s C2 (163s Amoco Empress),163s Partial 138kV Bus - Advice,163s C1 (163s Amoco Empress),163s 869W (163s Amoco Empress),760L (163s Amoco Empress - 760L41),869L (204s Sandy Point - 163s Amoco Empress) | Replace 163s4 PT, 163s64 Breaker, & 163s65 Switch & 163s869W Breaker Fail Replacement. | |
SUNCOR | 24-Sep-18 09:00 | 05-Oct-18 18:00 | 11.38 Days
Continuous |
29PL9-14 (29EDD-56 - 29EDD-34),29PL9-15 (29EDD-56 - 29EDD-34) | maintenance on bus 29PP-41F | |
ALTALINK | 24-Sep-18 12:00 | 04-Oct-18 18:00 | 10.25 Days
Continuous |
71s T1 (71s Lamoureux),71s T1(Tx18357) GOI | Replace the 71s T1 bushings (240kV, 138kV and XO) | |
BCH | 27-Sep-18 09:00 | 02-Nov-18 17:00 | 36.33 Days
Continuous |
5L72 (Mica Creek - Nicola) | Placeholder for MCA Switchgear Roof Replacement. | AB-BC |
ALTALINK | 01-Oct-18 08:00 | 05-Oct-18 18:00 | 4.42 Days
Continuous |
62s 138 KV Bus Advice,62s T7 (62s Brazeau),62s T4 (62s Brazeau),62s T5 (62s Brazeau),62s C1 (62s Brazeau),202L (61s Lodgepole - 62s Brazeau),801L (62s Brazeau - 294s Brazeau Outlet Works),62s 207 (62s Brazeau),62s 31 (62s Brazeau) | Protection upgrade | |
MONTANA | 01-Oct-18 11:00 | 04-Oct-18 18:00 | 3.29 Days
Continuous |
MATL (120s Picture Butte - Montana) | align with 1201L outage | AB-MATL |
ALTALINK | 01-Oct-18 12:00 | 04-Oct-18 18:00 | 3.25 Days
Continuous |
1201L (520s Bennett - BCH Cranbrook) | Maintenance Components | AB-BC |
SUNCOR | 02-Oct-18 09:00 | 12-Oct-18 18:00 | 10.38 Days
Continuous |
29PL9-2 (29EDD-1 Millennium - 848s Ruth Lake) | maintenance on 29CTT-1 in 29EDD-1 | |
BCH | 08-Oct-18 09:00 | 12-Oct-18 17:00 | 4.33 Days
Continuous |
1L275 (799s Coleman - Natal) | Annual Plan Request F19 - Kirk Carston or Trevor Wareham | AB-BC |
BCH | 15-Oct-18 08:00 | 15-Oct-18 16:00 | 8 Hours
Continuous |
2L294 (Nelway - A.A. Lambert) | Fortis Annual Plan 2018
(Outage)AAL CB3-1 Switch Replacement, to CREATE BUS CUT to RESTORE 2L294 during the replacement of CB3-1 |
AB-BC |
ALTALINK | 15-Oct-18 08:00 | 19-Oct-18 17:00 | 4.38 Days
Continuous |
719L (575s Sundre - 378s Shell Caroline),378s 652 (378s Shell Caroline),378s 552 (378s Shell Caroline),575s 719N (575s Sundre) | Upgrade 378s Shell Caroline Line Prot (A21/L4 & B21/L4. | |
BCH | 15-Oct-18 09:00 | 19-Oct-18 17:00 | 4.33 Days
Continuous |
1L274 (B1s BCH Natal - 1D1L274) | Annual Plan Request F19 | AB-BC |
ALTALINK | 16-Oct-18 07:00 | 17-Oct-18 18:00 | 1.46 Days
Continuous |
72s T1 (72s Leismer),72s T1 & 25kV Bus - GOI | Transformer Bushing Replacement | |
BCH | 19-Oct-18 15:00 | 19-Oct-18 17:00 | 2 Hours
Continuous |
5L52 (Ingledow - Custer) | ING 5D25 cutting over controls to new station control equipment | AB-BC |
BCH | 25-Oct-18 09:00 | 25-Oct-18 17:00 | 8 Hours
Continuous |
2L294 (Nelway - A.A. Lambert) | Fortis Annual Plan 2018 and AAL CB3-1 Switch Replacement | AB-BC |
ATCO | 30-Oct-18 07:00 | 30-Oct-18 17:00 | 10 Hours
Continuous |
7L69 (815s Goodfare - 731s Elmworth),815s 704 (815s Goodfare) | Install and test transfer trip from Altalink ,Protection upgrade for Advantage Oil and Gas addition | |
ALTALINK, Lethbridge | 05-Nov-18 13:00 | 06-Dec-18 14:00 | 31.04 Days
Continuous |
824L (593s Lethbridge Lakeview - 618s Riverbend) | Install self-supporting structures | |
BCH | 06-Nov-18 09:00 | 16-Nov-18 17:00 | 10.33 Days
Continuous |
1L274 (B1s BCH Natal - 1D1L274) | Annual Plan Request F19 | AB-BC |
ALTALINK | 26-Nov-18 07:00 | 04-Dec-18 18:00 | 8.46 Days
Continuous |
510s 2852 (510s Sunnybrook),510s 2952 (510s Sunnybrook) | Closing Open Point 'C' and energizing new VT13 and new reactor bank R3 (72 hour soak test) | |
ATCO | 08-Jan-19 07:00 | 11-Jan-19 17:30 | 3.44 Days
Continuous |
9L01 (888s Dover - 848s Ruth Lake) | 9L01 Cut in for in and out addition of 951S Thickwood Hills substation. Remove bypass at substation. | |
ATCO | 15-Jan-19 07:00 | 18-Jan-19 17:30 | 3.44 Days
Continuous |
9L07 (885s McMillan - 888s Dover) | Cut in 951S Thickwood Hills substation. | |
ENMAX, ALTALINK | 04-Feb-19 08:00 | 15-Feb-19 16:00 | 11.33 Days
Continuous |
24.83L (74s Janet - ENMAX 24) | Transmission Line Relocate | |
ATCO | 02-May-19 07:00 | 02-May-19 17:00 | 10 Hours
Continuous |
6L57 (735s Swan River - 727s Kinuso) | Install temp bypass for construction of new Kinuso substation | |
ATCO | 03-Jun-19 09:00 | 29-Jul-19 17:00 | 56.33 Days
Continuous |
840S McNeill Station | 2019 McNeill Fall T/A. Arrestor install and Bird Proofing | AB-SK |
ATCO | 02-Jul-19 07:00 | 05-Jul-19 17:30 | 3.44 Days
Continuous |
9L46 (932s Pemukan - 959s Lanfine) | Attach new Sharp Hills wind farm in/out connection. |
AB-BC, AB-SK & AB-MATL: refer to AESO web posting: | http://itc.aeso.ca/itc/public/reportIndex.do |
Also, | |
AB-BC, AB-SK & AB-MATL: refer to ISO Rule 203.6: | http://www.aeso.ca/rulesprocedures/18592.html |
Prepared On: | 2018-05-30 4:06:43 PM |
This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein. © 2009 Alberta Electric System Operator. All rights reserved |