Alberta Electric System Operator | |
System Co-ordination Plan | |
2018-03-30 to 2018-04-06 | |
Approved Outages |
Previous Version | |
Download CSV |
From | To | Owner | Type | Element | Scheduled Activity | Date/Time Comments | Interconnection |
---|---|---|---|---|---|---|---|
31-Jul-15 18:01 | 31-Aug-18 17:00 | EPCOR | Outage | Rossdale C1 | forced outage | 1,126.96 Days
Continuous |
|
28-Mar-17 12:00 | 31-Mar-18 12:00 | ATCO | TE | 801s Anderson RTU/SCADA | multiple SCADA cutovers from existing RTU to new RTU | 368 Days
Continuous |
|
09-Oct-17 17:00 | 30-Apr-18 16:00 | ATCO | Outage | 826s 502R (826s Marguerite Lake) | techs found scorch marks on the reactor (forced outage) | 202.96 Days
Continuous |
|
10-Oct-17 07:00 | 30-Mar-18 17:00 | EPCOR | TE | 665s Dome RTU/SCADA | 665S Dome S/S RTU | 171.42 Days
Daily |
|
10-Oct-17 07:00 | 30-Mar-18 17:00 | EPCOR | TE | 665S Dome | 665S Dome S/S relay blocking to 240 kV protection | 171.42 Days
Daily |
|
13-Dec-17 10:00 | 05-Apr-18 17:00 | ATCO | IO | 706s 705A (706s Irish Creek) | 705C new construction | 113.25 Days
Continuous |
|
02-Jan-18 06:30 | 15-Apr-18 18:30 | ALTALINK | RB | 551L (123s Banff - 953s Lake Louise) | line rebuild | 103.46 Days
Daily |
|
08-Jan-18 07:00 | 30-Apr-18 17:00 | EPCOR | TE | 330P Genesee | CIP yearly 500/138 kV password changes | 112.38 Days
Daily |
|
08-Jan-18 07:00 | 30-Mar-18 17:00 | EPCOR | TE | 330P Genesee | CIP yearly password changes | 81.38 Days
Daily |
|
09-Jan-18 07:30 | 30-Mar-18 16:00 | ATCO | IO | 6L126 | Altalink request - replacing structures and conductors from structures 1 - 151 | 80.31 Days
Continuous |
|
09-Jan-18 08:00 | 30-Apr-18 17:00 | ALTALINK | Outage | 325s C1 (325s Leduc) | forced outage | 111.33 Days
Continuous |
|
27-Jan-18 06:00 | 03-Apr-18 19:00 | ATCO | RB | 9L56 (720s Wabasca - 732s Mitsue),9L56 (720s Wabasca - 876s Brintnell) | line construction parallel to 9L56 | 66.5 Days
Daily |
|
29-Jan-18 09:00 | 30-Mar-18 18:00 | ATCO | TE | 741s Fox Creek RTU/SCADA | update station controller and HMI | 60.33 Days
Continuous |
|
06-Feb-18 07:30 | 30-Mar-18 17:00 | EPCOR | TE | Meadowlark | relay maintenance | 52.35 Days
Daily |
|
06-Feb-18 10:00 | 30-Mar-18 15:30 | ALTALINK | Outage | 526L (268s Whitecourt - 526DL185) | work between structures 1 - 151 | 52.19 Days
Continuous |
|
13-Feb-18 07:30 | 30-Apr-18 17:00 | EPCOR | TE | Namao | relay maintenance | 76.35 Days
Daily |
|
17-Feb-18 06:00 | 03-Apr-18 19:00 | ALTALINK | RB | 913L (69s North Barrhead - 732s Mitsue) | construction of new 500 kV line parallel to 9L913 | 45.5 Days
Daily |
|
17-Feb-18 06:00 | 03-Apr-18 19:00 | ATCO | RB | 9L57 (939s Livock - 960s Birchwood Creek) | new 500 kV line construction work in proximity of 9L57 | 45.5 Days
Daily |
|
17-Feb-18 06:00 | 03-Apr-18 19:00 | ATCO | RB | 9L913 (69s North Barrhead - 732s Mitsue) | new 500 kV line construction parallel to 9L913 | 45.5 Days
Daily |
|
17-Feb-18 06:00 | 03-Apr-18 19:00 | ATCO | RB | 9L10 (876s Brintnell - 939s Livock) | new 500 kV line construction parallel to 9L913 | 45.5 Days
Daily |
|
20-Feb-18 09:00 | 30-Mar-18 18:00 | ATCO | TE | 813s Little Smoky RTU/SCADA | RTU and HMI updates | 38.33 Days
Continuous |
|
27-Feb-18 07:30 | 31-Mar-18 20:00 | ENBRIDGE | Outage | Marias Shunt Capacitor | take down shunt bank 3, disassemble and order repplacement parts | 32.48 Days
Continuous |
|
28-Feb-18 14:00 | 31-May-18 16:00 | ATCO | IO | 2018S 7LA90D1 (2018s Muir) | COG for MUIR Tap | 92.04 Days
Continuous |
|
04-Mar-18 20:00 | 06-Apr-18 17:00 | ALTALINK | Outage | 289s 1552 (289s Saunders Lake) | CT emergency repair - forced outage | 32.83 Days
Daily |
|
06-Mar-18 08:30 | 30-Apr-18 17:00 | EPCOR | TE | Rossdale R72C2 (Rossdale),Rossdale R72C1 (Rossdale) | updating relay settings | 55.31 Days
Daily |
|
10-Mar-18 08:00 | 04-Jun-18 16:00 | ATCO | TE | 710S Vermilion | blocking bus protection for breaker replacement work | 86.29 Days
Continuous |
|
12-Mar-18 08:00 | 13-Apr-18 16:00 | ENMAX | TE | ENMAX 39 | 39.82L protection upgrade. C30 auto-switching relay | 32.33 Days
Continuous |
|
12-Mar-18 08:00 | 13-Apr-18 16:00 | ENMAX | Outage | 39.82L (ENMAX 162 Beddington - ENMAX 39),162s 138-RB82 (162s Beddington),162s 138-RB83 (162s Beddington) | line protection upgrade | 32.33 Days
Continuous |
|
12-Mar-18 08:00 | 30-Mar-18 16:00 | ENMAX | Outage | 6.82L (ENMAX 6 - ENMAX 41) | (SWCRR)-relocated a section of 6.82L | 18.33 Days
Continuous |
|
12-Mar-18 08:00 | 13-Apr-18 16:00 | ENMAX | TE | ENMAX 39 | 39.82L protection upgrade. 138kV bus differential protection | 32.33 Days
Daily |
|
19-Mar-18 07:00 | 03-Apr-18 17:30 | ALTALINK | Outage | 184s T3 (184s Petro-Canada Edmonton),606L (184s Petro-Canada Edmonton - 185s Bretville),184s Petro-Canada Edmonton 138 kV Bus 1 | move metering, P&C & telecom to new control building | 15.44 Days
Continuous |
|
19-Mar-18 08:00 | 30-Mar-18 16:00 | ENMAX | Outage | 39.3TR (ENMAX 39) | bushing/CT replacement and differential relay replacement | 11.33 Days
Continuous |
|
19-Mar-18 08:00 | 18-May-18 17:00 | ATCO | TE | 710s Vermilion RTU/SCADA | download RTU & HMI program | 60.38 Days
Continuous |
|
20-Mar-18 07:00 | 03-Apr-18 17:30 | ATCO | RB | 9L07 (888s Dover - 2011s Dawes) | to facilitate work on adjacent 9L01 circuit. 2-32024 | 14.44 Days
Daily |
|
20-Mar-18 12:00 | 06-Apr-18 18:00 | ALTALINK | Outage | 551L (945s Sunshine Village - 953s Lake Louise) | energize/de-energize bypass line between Str163 and Str188 to allow for rebuild of 551L (Sections 8) | 17.25 Days
Continuous |
|
20-Mar-18 12:00 | 06-Apr-18 18:00 | ALTALINK | IO | 551L (945s Sunshine Village - 953s Lake Louise) | disconnect 551EL loads from the 551L | 17.25 Days
Continuous |
|
24-Mar-18 10:00 | 27-Apr-18 16:00 | ATCO | Outage | 780s 707 (780s Lubicon) | failed relay repair | 34.25 Days
Continuous |
|
25-Mar-18 08:00 | 07-Apr-18 16:00 | ENMAX | Outage | 22.3TR (ENMAX 22) | install NGR | 13.33 Days
Continuous |
|
25-Mar-18 12:00 | 30-Mar-18 18:00 | SUNCOR | TE | 29PL9-17 (29EDD-1 Millennium - 29EDD-94 Voyageur) | protection B | 5.25 Days
Continuous |
|
26-Mar-18 08:00 | 13-Apr-18 16:00 | ENMAX | TE | 162s Beddington | 39.82L diff panel upgrade settings changes required | 18.33 Days
Daily |
|
26-Mar-18 08:00 | 01-Apr-18 18:00 | Syncrude | Outage | AL-1 (D05 Syncrude - Aurora) | line maintenance | 6.42 Days
Continuous |
|
26-Mar-18 08:00 | 30-Mar-18 17:00 | ALTALINK | Outage | 510s ACF14 (510s Sunnybrook) | reactor inspection and leak repair | 4.38 Days
Continuous |
|
26-Mar-18 08:00 | 30-Mar-18 16:00 | ATCO | TE | 7L65 (709s Vegreville - 710s Vermilion) | blocking 21A,B/7L65 relays for testing | 4.33 Days
Continuous |
|
26-Mar-18 08:00 | 30-Mar-18 16:00 | ATCO | TE | 710S Vermilion | 86-50BF-1/700BS1, 94-50BF-1/700BS1 temporary blocking for testing | 4.33 Days
Continuous |
|
26-Mar-18 08:00 | 07-Apr-18 11:00 | ATCO | IO | AltaLink NW AltaLink outage | AltaLink work at 69s | 12.13 Days
Continuous |
|
26-Mar-18 08:00 | 12-Apr-18 17:00 | ATCO | TE | 706S Irish Creek,7L53 (706s Irish Creek - 710s Vermilion),706s 702T (706s Irish Creek) | relay protection will be out of service for testing of new settings and logicand removal of RAS settings | 17.38 Days
Continuous |
|
26-Mar-18 09:00 | 30-Mar-18 18:00 | SUNCOR | Outage | 29EDD1S452 (29EDD-1 Millennium) | SF6 top up | 4.38 Days
Continuous |
|
26-Mar-18 09:00 | 06-Apr-18 18:00 | SUNCOR | TE | 29PL9-16 (29EDD-1 Millennium - 29EDD-94 Voyageur) | protection A | 11.38 Days
Continuous |
|
27-Mar-18 07:00 | 30-Jun-18 17:00 | EPCOR | TE | Strathcona RTU/SCADA | substation automation upgrade project, IP address update and cutover of RTU to new network | 95.42 Days
Daily |
|
27-Mar-18 07:00 | 30-Jun-18 17:00 | EPCOR | TE | Strathcona | substation automation upgrade project, IP address update and cutover of IED's to new network | 95.42 Days
Daily |
|
29-Mar-18 08:00 | 30-Mar-18 16:00 | ATCO | TE | 710s Vermilion RTU/SCADA | end to end alarm testing during 7L65 outage | 1.33 Days
Continuous |
|
31-Mar-18 08:00 | 01-Apr-18 18:00 | ENMAX, ALTALINK | Outage | 36.1TR (ENMAX 36),36.3TR (ENMAX 36),7.84L (ENMAX 36 - ENMAX 7),36B138-36BT3 (ENMAX 36),36.81L (44s Bearspaw - ENMAX 36) | switch maintenance and spring substation washing | 1.42 Days
Continuous |
|
31-Mar-18 08:00 | 01-Apr-18 18:00 | ALTALINK | IO | 44s39 (36.81L) Enmax - Advice | HV SW/MD maintenance 36.1MD, SW88, SW89, SW90, SW83. doble 36PT138-Z31- spring substation washing | 1.42 Days
Daily |
|
31-Mar-18 08:00 | 07-Apr-18 12:00 | ENMAX | Outage | 33.2TR (ENMAX 33) | install NGR | 7.17 Days
Continuous |
|
02-Apr-18 07:00 | 06-Apr-18 16:00 | ENMAX | RB | 2.83L (ENMAX 2 - ENMAX 5 - ENMAX 13) | tree trimming | 4.38 Days
Daily |
|
02-Apr-18 08:00 | 06-Apr-18 13:00 | ALTALINK, ATCO | Outage | 69s T5 (69s North Barrhead),723L (69s North Barrhead - 723L133),7L230 (69s North Barrhead - 7L230 tap),69s 723E (69s North Barrhead),69s 230W (69s North Barrhead) | replace 69s13 & 69s15, and 69s723W breaker fail protection | 4.21 Days
Continuous |
|
02-Apr-18 08:00 | 06-Apr-18 13:00 | ATCO | IO | 7L230 (69s North Barrhead - 7L230 tap) | Altalink work | 4.21 Days
Continuous |
|
02-Apr-18 08:00 | 06-Apr-18 17:00 | ALTALINK | TE | 69S North Barrhead | miscellaneous protection outages | 4.38 Days
Daily |
|
02-Apr-18 08:00 | 03-Apr-18 16:30 | ALTALINK | TE | 216s Knightsbridge RTU/SCADA | update configuration for new battery charger alarms | 1.35 Days
Daily |
|
02-Apr-18 09:00 | 03-Apr-18 17:00 | ALTALINK | TE | 184s Petro-Canada Edmonton RTU/SCADA | cutover controls/status, alarms and analogs | 1.33 Days
Daily |
|
02-Apr-18 09:00 | 11-Apr-18 09:00 | ENMAX | Outage | ENMAX 25 B240-D131 (ENMAX 25),ENMAX 25 B240-D132 (ENMAX 25),ENMAX 25 1GSU-XF-001 (ENMAX 25) | switch maintenance | 9 Days
Continuous |
|
02-Apr-18 09:00 | 05-Apr-18 15:00 | SUNCOR | TE | Suncor RTU/SCADA | data link to AESO over ICCP interruption | 3.25 Days
Continuous |
|
02-Apr-18 10:00 | 11-Apr-18 10:00 | ENMAX | Outage | ENMAX 25 B240-D141 (ENMAX 25),ENMAX 25 B240-D140 (ENMAX 25),ENMAX 25 MD240-3GSU (ENMAX 25) | testing | 9 Days
Continuous |
|
02-Apr-18 11:30 | 22-Apr-18 13:30 | ALTALINK | TE | 184s T3 (184s Petro-Canada Edmonton) | 'A' protection OOS to cutover low side CT | 20.08 Days
Continuous |
|
02-Apr-18 13:00 | 03-Apr-18 16:00 | ALTALINK | TE | 185s Bretville RTU/SCADA | add new alarm point for pilot wire fail | 27 Hours
Daily |
|
03-Apr-18 07:00 | 16-Apr-18 17:00 | ALTALINK | IO | 7L117 (A710s - A706s) ATCO Info | Atco maintenance (protection upgrade) | 13.42 Days
Continuous |
|
03-Apr-18 07:00 | 20-Apr-18 17:00 | EPCOR | Outage | 805s T1 (805s Jasper),72JM18 (805s Jasper - Meadowlark),72JW19 (805s Jasper - Woodcroft) | manhole resurfacing | 17.42 Days
Continuous |
|
03-Apr-18 07:00 | 03-Apr-18 18:00 | ALTALINK | Outage | 729L (285s East Camrose - 542s Ervick) | installing bird diverters | 11 Hours
Daily |
|
03-Apr-18 07:00 | 16-Apr-18 17:00 | ATCO | Outage | 7L117 (706s Irish Creek - 710s Vermilion),710s 701 (710s Vermilion) | protection upgrade | 13.42 Days
Continuous |
|
03-Apr-18 08:00 | 24-Apr-18 16:00 | ALTALINK | Outage | 95s T2 (95s Imperial Oil Edmonton) | customer switchgear change | 21.33 Days
Continuous |
|
03-Apr-18 08:00 | 06-Apr-18 16:00 | ATCO | TE | 710s 703T (710s Vermilion),710s 702T (710s Vermilion) | blocking 51/51N protection | 3.33 Days
Continuous |
|
03-Apr-18 08:00 | 10-Apr-18 16:00 | ATCO | TE | 7L117 (706s Irish Creek - 710s Vermilion) | remove DC power to protection relays | 7.33 Days
Continuous |
|
03-Apr-18 09:00 | 06-Apr-18 18:00 | ALTALINK | Outage | 770L (254s Coaldale - 370s North Lethbridge) | emergency repairs; damper repair | 3.38 Days
Continuous |
|
03-Apr-18 09:00 | 06-Apr-18 18:00 | ALTALINK | Outage | 820AL (315s Chin Chute - 820L tap),820L (254s Coaldale - 820L tap),820L (67s Stirling - 820AL tap) | emergency repairs; damper repair | 3.38 Days
Continuous |
|
03-Apr-18 10:00 | 03-Apr-18 12:00 | Saskpower | RB | 9LS1M (840s McNeil - Swift Current) | SaskPower will be performing switching at the Swift Current switching station | 2 Hours
Continuous |
|
03-Apr-18 10:00 | 03-Apr-18 14:00 | ATCO | TE | 720s Wabasca RTU/SCADA,ATCO Radio Tower | Aprisa radio link PM | 4 Hours
Continuous |
|
03-Apr-18 11:00 | 03-Apr-18 17:00 | ALTALINK | TE | 288s Wolf Creek RTU/SCADA | techs to perform the following work at site:Install new CF card and full site checkout | 6 Hours
Daily |
|
03-Apr-18 12:00 | 03-Apr-18 14:00 | ALTALINK | TE | 184S Petro-Canada Edmonton | re-instate 184s34 (bus tie breaker) CT contribution to 138kV bus 2 protection | 2 Hours
Daily |
|
03-Apr-18 12:00 | 09-Apr-18 07:00 | ATCO, CNRL | Outage | 859s 701T (859s Primrose),859s 701 (859s Primrose),859s 704 (859s Primrose),859s701TD1 (859s Primrose),859s 52G (859s Primrose) | maintenance | 5.79 Days
Continuous |
|
03-Apr-18 12:30 | 03-Apr-18 17:30 | ALTALINK | TE | 65S High River | perform relay setting changes | 5 Hours
Daily |
|
03-Apr-18 17:31 | 04-Apr-18 16:00 | ALTALINK | Outage | 184s T1 (184s Petro-Canada Edmonton) | protection wiring to breakers | 22.48 Hours
Daily |
|
04-Apr-18 07:00 | 04-Apr-18 18:00 | ALTALINK | Outage | 730L (285s East Camrose - 730L62) | install bird diverters | 11 Hours
Continuous |
|
04-Apr-18 07:00 | 11-Apr-18 17:00 | ALTALINK | IO | 937L (102s-5s) Enmax - Advice | relocate Enmax Owned Structure for Green LRT Project | 7.42 Days
Continuous |
|
04-Apr-18 07:00 | 11-Apr-18 17:00 | ALTALINK | IO | 936L (102s-5s) Enmax - Advice | relocate Enmax Owned Structure for Green LRT Project | 7.42 Days
Continuous |
|
04-Apr-18 08:00 | 04-Apr-18 18:00 | Syncrude | TE | Syncrude loss of visibility | ICCP server upgrade | 10 Hours
Continuous |
|
04-Apr-18 08:00 | 04-Apr-18 16:00 | ATCO | Outage | EX1-01 (879s Scotford Upgrader - 402s Scotford Expansion) | change contaminated insulators | 8 Hours
Continuous |
|
04-Apr-18 08:00 | 04-Apr-18 16:00 | AIRLIQUIDE | RB | ALC03L (408s Air Liquide Scotford - 402s Scotford Expansion) | change contaminated insulators on EX101L | 8 Hours
Continuous |
|
04-Apr-18 08:00 | 04-Apr-18 16:00 | ALTALINK | IO | EX1-01L - ATCO Info | Atco maintenance (To change contaminated insulators, on EX1-01L) | 8 Hours
Daily |
|
04-Apr-18 08:00 | 11-Apr-18 16:00 | ALTALINK, ENMAX | Outage | 936L (102s Langdon - 5s East Calgary),937L (102s Langdon - 5s East Calgary) | green Line LRT project | 7.33 Days
Continuous |
|
04-Apr-18 08:00 | 04-Apr-18 15:30 | ALTALINK | TE | 69s North Barrhead RTU/SCADA | update RTU configuration for new 69s723E breaker fail protection replacement | 7.5 Hours
Daily |
|
04-Apr-18 08:00 | 04-Apr-18 18:00 | ALTALINK | Outage | 77s 552 (77s Sagitawah) | install CT secondary ground on breaker 77s552 | 10 Hours
Daily |
|
04-Apr-18 08:00 | 04-Apr-18 16:00 | ENMAX | TE | 22.81L (ENMAX 22 - ENMAX 39),38.83L (ENMAX 39 - ENMAX 38) | correct relay close logic settings | 8 Hours
Continuous |
|
04-Apr-18 08:00 | 13-Apr-18 16:00 | ENMAX | Outage | 15.1TR (ENMAX 15) | install PRD | 9.33 Days
Continuous |
|
04-Apr-18 08:00 | 04-Apr-18 17:00 | ALTALINK | TE | 523s Bullshead RTU/SCADA | check 880LR | 9 Hours
Daily |
|
04-Apr-18 09:00 | 04-Apr-18 17:00 | ALTALINK | TE | 184s Petro-Canada Edmonton RTU/SCADA | fix deficiency items found during acceptance | 8 Hours
Daily |
|
04-Apr-18 09:00 | 04-Apr-18 17:00 | ALTALINK | TE | 63s Red Deer RTU/SCADA | troubleshoot COMM/RTU issues with 912L A & B protections | 8 Hours
Daily |
|
04-Apr-18 09:00 | 04-Apr-18 17:00 | ALTALINK | TE | 63S Red Deer | troubleshoot COMM/RTU protection, alarming, and perform relay setting change | 8 Hours
Daily |
|
04-Apr-18 09:30 | 05-Apr-18 17:30 | ALTALINK | TE | 77S Sagitawah,825L (484s Millar Western - 77s Sagitawah),938L (77s Sagitawah - 809s Louise Creek),939L (77s Sagitawah - 809s Louise Creek) | maintenance on B Protection for lines and sync check relays for breakers one at a time | 1.33 Days
Daily |
|
04-Apr-18 09:30 | 04-Apr-18 17:30 | ALTALINK | TE | 180L (255s Vulcan - 928s East Stavely) | settings changes to the 180L A21/79/L4 SEL311C and 180L B21/L4 URD60 | 8 Hours
Daily |
|
04-Apr-18 09:30 | 04-Apr-18 17:00 | ALTALINK | TE | 388s Riverside RTU/SCADA | complete outstanding SCADA deficiencies | 7.5 Hours
Daily |
|
04-Apr-18 10:00 | 04-Apr-18 14:00 | ALTALINK | TE | 59s Peigan RTU/SCADA | update configuration for breaker maintenance switches | 4 Hours
Daily |
|
04-Apr-18 10:00 | 04-Apr-18 17:00 | ALTALINK | TE | AltaLink Radio Tower | check levels and realign dish at 9243R Barons and/or 9282R Buffalo Hill | 7 Hours
Daily |
|
04-Apr-18 10:00 | 12-Apr-18 18:00 | Saskpower | Outage | Sask Power SW903T | attach new 230 kV bus to 911C isolator, primary injections and breaker interlocks | 8.33 Days
Continuous |
AB-SK |
04-Apr-18 13:00 | 06-Apr-18 13:00 | ATCO | TE | 840s McNeill Station RTU/SCADA | update HMI | 2 Days
Continuous |
|
04-Apr-18 16:00 | 22-Apr-18 08:00 | ALTALINK | Outage | 184s T1 (184s Petro-Canada Edmonton),184s T2 (184s Petro-Canada Edmonton),705L (184s Petro-Canada Edmonton - 216s Knightsbridge),184s Petro-Canada Edmonton 138 kV Bus 2 | move metering, telecom to new control building and bus and line maintenance | 17.67 Days
Continuous |
|
05-Apr-18 08:30 | 05-Apr-18 16:30 | ALTALINK | TE | 87s Gaetz RTU/SCADA | update supervisory configuration | 8 Hours
Daily |
|
05-Apr-18 09:00 | 05-Apr-18 16:00 | ALTALINK | TE | 227s Cutting Lake RTU/SCADA,339s Duchess RTU/SCADA,AltaLink Radio Tower | MPLS upgrade nodes at 9028R West Brooks | 7 Hours
Daily |
|
05-Apr-18 09:00 | 05-Apr-18 16:00 | ALTALINK | TE | 28s West Brooks RTU/SCADA,AltaLink Radio Tower | upgrading MPLS nodes at 28s West Brooks | 7 Hours
Daily |
|
05-Apr-18 09:00 | 05-Apr-18 16:00 | ATCO | TE | 7L587 (826s Marguerite Lake - 822s Wolf Lake) | test 21B relay | 7 Hours
Continuous |
|
05-Apr-18 09:00 | 06-Apr-18 18:00 | ENMAX | Outage | 25B240-D132 (ENMAX 25),ENMAX 25 B240-D131 (ENMAX 25),ENMAX 25 1GSU-XF-001 (ENMAX 25) | switch repair and testing | 1.38 Days
Continuous |
|
05-Apr-18 09:00 | 05-Apr-18 17:30 | ALTALINK | RB | 1201L (520s Bennett - BCH Cranbrook) | bird marker corona testing | 8.5 Hours
Daily |
|
05-Apr-18 09:00 | 06-Apr-18 17:00 | ALTALINK | TE | 184s Petro-Canada Edmonton RTU/SCADA | cutover controls/status, alarms and analogs | 1.33 Days
Continuous |
|
05-Apr-18 09:30 | 22-Apr-18 16:30 | ALTALINK | TE | 705L (184s Petro-Canada Edmonton - 216s Knightsbridge),865L (216s Knightsbridge - 38s East Edmonton) | isolate L16 TPR Ch1 and Ch2 for work at 184s Petro-Canada Edmonton | 17.29 Days
Daily |
|
05-Apr-18 10:00 | 05-Apr-18 16:00 | ALTALINK | TE | 542s Ervick RTU/SCADA | routine maintenance on single channel MDS radio | 6 Hours
Daily |
|
06-Apr-18 07:00 | 10-Apr-18 18:00 | ALTALINK | Outage | 174L (197s Bardo - 289s Saunders Lake) | replace two structures for road clearance and installing marker cones | 4.46 Days
Continuous |
|
06-Apr-18 07:00 | 06-Apr-18 18:00 | ALTALINK | Outage | 799L (443s South Mayerthorpe - 235s Entwistle) | urgent repair to damaged structures | 11 Hours
Continuous |
|
06-Apr-18 08:00 | 16-Apr-18 18:00 | Syncrude | Outage | D05 T1 (D05 Syncrude) | 5 yr PM | 10.42 Days
Continuous |
|
06-Apr-18 10:00 | 06-Apr-18 12:00 | ATCO | IO | 840s 901 (840s McNeill) | stand-off on the S1M line for SaskPower work | 2 Hours
Continuous |
This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein. © 2009 Alberta Electric System Operator. All rights reserved |