From | To | Owner | Type | Element | Scheduled Activity | Date/Time Comments | Interconnection |
---|---|---|---|---|---|---|---|
24-Jul-15 12:00 | 31-Dec-17 16:00 | ATCO | IO | 736s 601T (736s Valleyview P.R.O.P.L.),6L54 (736s Valleyviewp.R.O.P.L. - 734s Sturgeon) | customer request to permanently disconnect secondary from substation to their site | 891.21 Days
Continuous |
|
31-Jul-15 18:01 | 31-Dec-17 17:00 | EPCOR | Outage | Rossdale C1 | forced outage | 884 Days
Continuous |
|
16-Mar-17 16:00 | 10-Nov-17 16:00 | ATCO | Outage | 959S SVC (959s Lanfine) | forced outage | 239.04 Days
Continuous |
|
28-Mar-17 12:00 | 17-Nov-17 12:00 | ATCO | TE | 801s Anderson RTU/SCADA | multiple SCADA cct cutovers from existing RTU to new RTU | 234.04 Days
Continuous |
|
05-Aug-17 08:00 | 04-Nov-17 16:00 | ENMAX | Outage | 41.1C (ENMAX 41) | FATDSC construction, install new breaker - due to arrive in Sept (original breaker used at 14s) | 91.33 Days
Continuous |
|
14-Aug-17 12:00 | 12-Nov-17 16:00 | ENMAX | Outage | ENMAX 25 B240-D131 (ENMAX 25) | SF6 sample, repair SW132 switch | 90.21 Days
Continuous |
|
25-Aug-17 16:00 | 05-Dec-17 16:00 | ENMAX | Outage | 162s 138-RB85 (162s Beddington) | new construction: install new transformer bay | 102.04 Days
Continuous |
|
28-Aug-17 08:00 | 10-Nov-17 16:00 | ENMAX | TE | ENMAX 11 138 kV Bus | 11s 138kV BD relay | 74.38 Days
Continuous |
|
11-Sep-17 07:00 | 30-Nov-17 17:00 | EPCOR | Outage | E511s VictoriaT2 (511s Victoria) | containment pit | 80.46 Days
Daily |
|
18-Sep-17 14:01 | 07-Dec-17 17:00 | ALTALINK | Outage | 69s T4 (69s North Barrhead),69s 713 (69s North Barrhead) | emergency tap changer repair | 80.17 Days
Continuous |
|
25-Sep-17 08:00 | 15-Dec-17 17:00 | ALTALINK | IO | AltaLink Radio Tower | 9356R Evansburg (Telecom) - installing new antenna | 81.42 Days
Daily |
|
25-Sep-17 09:00 | 06-Nov-17 15:00 | ATCO | Outage | 863S Paintearth,9L27 (863s Paintearth - 755s Cordel),9L948 (650s Hansman Lake - 863s Paintearth) | 240 kV switch replacement | 42.29 Days
Continuous |
|
26-Sep-17 15:00 | 31-Dec-17 06:59 | EPCOR | Outage | Rossdale C2 | forced outage | 95.71 Days
Continuous |
|
02-Oct-17 08:00 | 15-Dec-17 17:00 | ALTALINK | IO | AltaLink Radio Tower | installing new antenna 9069R Barrhead | 74.42 Days
Daily |
|
02-Oct-17 09:00 | 01-Dec-17 11:00 | ALTALINK | Outage | 180s T2 (180s Cope Creek) | borrow the CT for switchgear replacement at 482s | 60.13 Days
Continuous |
|
02-Oct-17 10:00 | 08-Dec-17 16:00 | ALTALINK | Outage | 320p T1 (320p Keephills) | urgent repair - forced outage | 67.29 Days
Continuous |
|
02-Oct-17 13:24 | 05-Nov-17 16:00 | ATCO | Outage | 946s 902 (946s Oakland) | forced outage (end date unknown) | 34.15 Days
Continuous |
|
03-Oct-17 08:00 | 06-Nov-17 18:00 | SUNCOR | Outage | 29PT-341 (29EDD-34) | project 1716 - Suncor Plant 300HV | 34.46 Days
Continuous |
|
09-Oct-17 08:00 | 15-Dec-17 17:00 | ALTALINK | TE | AltaLink Radio Tower | 9516R Tomahawk, installing new antenna, radio will be re-routed | 67.42 Days
Daily |
|
09-Oct-17 08:00 | 15-Dec-17 17:00 | ALTALINK | IO | AltaLink Radio Tower | 9269R Whitecourt, installing new antenna, radio will be re-routed | 67.42 Days
Daily |
|
09-Oct-17 17:00 | 30-Apr-18 16:00 | ATCO | Outage | 826s 502R (826s Marguerite Lake) | techs found scorch marks on the reactor (forced outage) | 202.96 Days
Continuous |
|
10-Oct-17 07:00 | 20-Nov-17 17:30 | ATCO | Outage | 734s 603 (734s Sturgeon),734s 601 (734s Sturgeon),734s 704 (734s Sturgeon),6L54 (736s Valleyviewp.R.O.P.L. - 734s Sturgeon),734s 701T (734s Sturgeon) | 6L54 and the 734S 72 KV bus will be salvaged | 41.48 Days
Continuous |
|
10-Oct-17 07:00 | 15-Feb-18 17:00 | EPCOR | TE | 665s Dome RTU/SCADA | 665S Dome S/S RTU | 128.46 Days
Daily |
|
10-Oct-17 07:00 | 15-Feb-18 17:00 | EPCOR | TE | 665S Dome | 665S Dome S/S relay blocking to 240 kV protection | 128.46 Days
Daily |
|
10-Oct-17 10:00 | 15-Dec-17 17:30 | ALTALINK | Trans Test | 325s 1552 (325s Leduc),325s C1 (325s Leduc) | install resister/filter bank on cap bank | 66.35 Days
Continuous |
|
15-Oct-17 07:00 | 29-Dec-17 16:00 | CMH, Medicine Hat | Outage | 20L (MH69S-6 Riverview - MH69S-3 South Ridge),MH69s3 MH69_302 (MH69s3 South Ridge),MH69s6 MH69_611 (MH69s6 Riverview) | pole replacement work | 75.42 Days
Continuous |
|
16-Oct-17 08:00 | 09-Nov-17 16:00 | ENMAX | Outage | 22.1TR (ENMAX 22) | tapchanger replacement | 24.38 Days
Continuous |
|
16-Oct-17 08:00 | 05-Nov-17 16:00 | ENMAX, ALTALINK | TE | 985L (ENMAX 25 - 74s Janet) | 985L A & B line protection - RAS scheme settings upgrade | 20.38 Days
Daily |
|
16-Oct-17 08:00 | 05-Nov-17 16:00 | ENMAX, ALTALINK | TE | 1003L (74s Janet - ENMAX 25) | 1003L A & B line protection - RAS scheme settings upgrade | 20.38 Days
Daily |
|
16-Oct-17 08:00 | 05-Nov-17 16:00 | ENMAX | TE | ENMAX 25 | A & B line protection - RAS scheme settings upgrade | 20.38 Days
Daily |
|
16-Oct-17 08:00 | 05-Nov-17 16:00 | ENMAX | TE | ENMAX 25 | A & B line protection - RAS scheme settings upgrade | 20.38 Days
Daily |
|
16-Oct-17 08:00 | 05-Nov-17 16:00 | ENMAX | TE | ENMAX 25 | A & B line protection - RAS scheme settings upgrade | 20.38 Days
Daily |
|
23-Oct-17 08:00 | 10-Nov-17 17:00 | ALTALINK, EPCOR | RB | 909L (89s Ellerslie - 665s Dome) | Cut 910L in/out pf 289s | 18.42 Days
Continuous |
|
23-Oct-17 15:00 | 20-Nov-17 19:00 | ALTALINK | Outage | 320p 989 (320p Keephills) | required for clearance on 320pT1 | 28.21 Days
Continuous |
|
24-Oct-17 08:00 | 06-Nov-17 17:15 | ALTALINK | Outage | 922L (310p Sundance - 17s Benalto) | line maintenance | 13.43 Days
Continuous |
|
30-Oct-17 06:30 | 10-Nov-17 17:30 | ALTALINK | Outage | 281s 1081 (281s Johnson),17s 3 (17s Benalto),17s 2 (17s Benalto),1081L (17s Benalto - 281s Johnson) | 17s3 breaker & C60 relay replacement & PMU wiring & airbreak module replacement | 11.5 Days
Continuous |
|
30-Oct-17 07:00 | 10-Nov-17 17:00 | EPCOR | Outage | 72CK12 (987s Clover Bar - Kennedale) | cutover of new line protection | 11.46 Days
Continuous |
|
30-Oct-17 07:00 | 04-Dec-17 17:00 | ATCO | Outage | 745s 601 (745s Slave Lake),745s 601T (745s Slave Lake) | replace foundations in 25 kV bay | 35.46 Days
Continuous |
|
30-Oct-17 08:00 | 06-Nov-17 16:00 | ENMAX | Outage | 21.4TR (ENMAX 21) | transformer differential relay replacement | 7.38 Days
Continuous |
|
30-Oct-17 08:00 | 15-Feb-18 16:00 | ATCO | TE | 7L57 (813s Little Smoky - 734s Sturgeon) | 734s Sturgeon 21-50BF/7L57 wiring changes | 108.38 Days
Continuous |
|
30-Oct-17 08:00 | 06-Nov-17 16:00 | ENMAX | TE | ENMAX 21 | install new panel for 21.4TR | 7.38 Days
Continuous |
|
30-Oct-17 08:00 | 06-Nov-17 16:00 | ENMAX, ALTALINK | TE | 21.80L (42s Sarcee - ENMAX 21) | install new panel for 21.4TR | 7.38 Days
Continuous |
|
30-Oct-17 08:00 | 06-Nov-17 16:00 | ENMAX | TE | 20.82L (ENMAX 21 - ENMAX 20) | install new panel for 21.4TR | 7.38 Days
Continuous |
|
30-Oct-17 10:30 | 16-Nov-17 15:00 | ALTALINK | Outage | 163s 1752 (163s Amoco Empress) | replace 163s1752 breaker to new SF6 type | 17.23 Days
Continuous |
|
30-Oct-17 12:00 | 05-Nov-17 09:30 | ALTALINK | Outage | 385s T2 (385s Spring Coulee) | replacing motor mechanics on 385s9 | 5.94 Days
Continuous |
|
30-Oct-17 12:30 | 19-Nov-17 12:30 | Lethbridge | RB | 463L (15s Fort Macleod - 181s Chinook) | safety requirement for 463L | 20.04 Days
Continuous |
|
30-Oct-17 16:00 | 08-Nov-17 16:00 | ENMAX | Outage | 39.4TR (ENMAX 39) | bushing/CT replacement | 9.04 Days
Continuous |
|
30-Oct-17 17:30 | 19-Nov-17 08:30 | ALTALINK | Outage | 463L (15s Fort Macleod - 463L46) | component replacements, re-string on multiple sections | 19.67 Days
Continuous |
|
30-Oct-17 18:01 | 09-Nov-17 07:00 | ALTALINK | Outage | 910L (89s Ellerslie - 288s Wolf Creek),288s 552 (288s Wolf Creek),288s 452 (288s Wolf Creek) | 910L P&C work at 288s,910L P&C work at 89s | 9.58 Days
Continuous |
|
31-Oct-17 08:00 | 07-Nov-17 17:00 | ALTALINK | Outage | 65s T2 (65s High River) | reclaim T2 oil, doble and maintain | 7.42 Days
Continuous |
|
01-Nov-17 06:30 | 19-Dec-17 18:30 | ALTALINK | RB | 551L (123s Banff - 953s Lake Louise) | line rebuild | 48.54 Days
Daily |
|
01-Nov-17 07:00 | 22-Dec-17 17:00 | ALTALINK, ENMAX | Outage | 916L (42s Sarcee - 5s East Calgary),693L (42s Sarcee - ENMAX 10) | [SWCRR] 916L and 693L to move U/G for a portion, connect new U/G cables at both ends | 51.46 Days
Continuous |
|
01-Nov-17 07:00 | 10-Nov-17 18:00 | ALTALINK | RB | 914L (86s Bigstone - 89s Ellerslie) | [SWEATD] complete wire work on 910L50 & 1140L50 structures | 9.5 Days
Continuous |
|
01-Nov-17 07:00 | 22-Dec-17 10:00 | ENMAX | IO | Altalink Advice. 693L | SWCRR project, connect new U/G cables at both ends | 51.17 Days
Continuous |
|
01-Nov-17 07:30 | 12-Nov-17 16:30 | ALTALINK | IO | 37.82L Enmax Advice | line protection upgrade | 11.42 Days
Continuous |
|
01-Nov-17 08:00 | 12-Nov-17 16:00 | ENMAX, ALTALINK | Outage | 37.82L (74s Janet - ENMAX 37) | line protection upgrade | 11.38 Days
Continuous |
|
01-Nov-17 08:00 | 10-Nov-17 16:00 | ENMAX | TE | ENMAX 34 RTU/SCADA | RTU upgrade | 9.38 Days
Daily |
|
01-Nov-17 12:00 | 05-Nov-17 09:00 | ALTALINK | Outage | 385S Spring Coulee | replacement of 69kV VT1 and junction box | 3.92 Days
Continuous |
|
01-Nov-17 12:00 | 05-Nov-17 09:00 | ALTALINK | TE | 385S Spring Coulee | under frequency relay will remain out of service during the VT1 replacement | 3.92 Days
Continuous |
|
01-Nov-17 12:00 | 05-Nov-17 09:00 | ALTALINK | TE | 385s T3 (385s Spring Coulee) | B protection on 385s T3 will be out-of-service while VT1 is being replaced | 3.92 Days
Continuous |
|
01-Nov-17 12:00 | 05-Nov-17 09:00 | ALTALINK | TE | 225L (229s Glenwood - 385s Spring Coulee) | both RAS's A & B will be out of service along with both 21 A & B, 67N relays at 385s while VT1 is being replaced | 3.92 Days
Continuous |
|
01-Nov-17 12:00 | 05-Nov-17 09:00 | ALTALINK | TE | 225L (385s Spring Coulee - 225s Magrath),385s 67 (385s Spring Coulee) | 21A & B and 67N relays out-of-service while VT1 is being replaced | 3.92 Days
Continuous |
|
02-Nov-17 02:00 | 07-Nov-17 00:00 | ALTALINK | Outage | 62s12 (62s Brazeau) | maintenance | 4.96 Days
Daily |
|
03-Nov-17 07:00 | 13-Nov-17 15:00 | ATCO | Outage | 9L97 (946s Oakland - 801s Anderson) | protection upgrade | 10.38 Days
Continuous |
|
03-Nov-17 07:00 | 13-Nov-17 15:00 | ALTALINK | IO | 9L97 (A801s - A946s) - ATCO Info | Atco maintenance | 10.38 Days
Continuous |
|
03-Nov-17 07:15 | 26-Nov-17 18:15 | ALTALINK | Outage | 100L (895s Suffield - 498s Tilley) | structure/conductor/OHSW repair and maintenance | 23.5 Days
Continuous |
|
03-Nov-17 17:46 | 05-Nov-17 09:00 | ALTALINK | Outage | 385s 225 (385s Spring Coulee),225L (229s Glenwood - 385s Spring Coulee) | line is required to be open ended at 385s while 385s VT1 is being replaced | 1.68 Days
Continuous |
|
03-Nov-17 19:00 | 05-Nov-17 19:00 | EPCOR | Outage | 72CN10 (987s Clover Bar - Namao),72CH9 (Hardisty - 987s Clover Bar),987s C1 (987s Clover Bar),987s T2 (987s Clover Bar),987s CDS2 (987s Clover Bar),987s GDS-1B1 (987s Clover Bar),987s GDS-1B2 (987s Clover Bar) | disconnect replacement | 2.04 Days
Continuous |
|
04-Nov-17 07:00 | 05-Nov-17 16:00 | ENMAX | Outage | 3.82L (ENMAX 3 - ENMAX 8) | Installing new water main to Rosedale school (905 - 13 Ave. NW) | 1.42 Days
Continuous |
|
04-Nov-17 08:00 | 05-Nov-17 18:00 | ALTALINK | Outage | 58s T2 (58s Edson) | replace 25kV risers between the new breakers and the 25kV bus & install bird cover-up | 1.46 Days
Daily |
|
04-Nov-17 08:00 | 05-Nov-17 16:00 | ENMAX | TE | 36.2TR (ENMAX 36) | change settings on A protection | 1.38 Days
Daily |
|
04-Nov-17 08:00 | 06-Nov-17 16:00 | ENMAX | TE | ENMAX 21 | auto switching relay C30 outage to install new panel for 21.4TR and install new relay settings. | 2.38 Days
Continuous |
|
04-Nov-17 08:00 | 04-Nov-17 16:00 | ENMAX | Outage | ENMAX 21 B138-21.CAP (ENMAX 21) | install new panel for 21.4TR | 8 Hours
Continuous |
|
04-Nov-17 08:00 | 12-Nov-17 16:00 | ENMAX | TE | ENMAX 37 | auto switching protection outage to add relay setting changes and install new 37.82L panel | 8.38 Days
Continuous |
|
04-Nov-17 08:00 | 15-Dec-17 11:00 | ATCO | TE | 734s Sturgeon RTU/SCADA | update RTU and HMI | 41.17 Days
Continuous |
|
04-Nov-17 08:00 | 04-Nov-17 16:00 | ALTALINK | TE | 237S Foothills | trouble corrective work | 8 Hours
Continuous |
|
04-Nov-17 09:00 | 04-Nov-17 19:00 | ALTALINK | Outage | 38s C2 (38s East Edmonton),38s 3152 (38s East Edmonton) | fence replacement around capacitor bank | 10 Hours
Daily |
|
05-Nov-17 07:00 | 05-Nov-17 17:00 | ATCO | RB | 7L57 (813s Little Smoky - 734s Sturgeon) | crane work in the 734S Sturgeon Substation for GOI 2-37080 | 10 Hours
Continuous |
|
05-Nov-17 09:00 | 05-Nov-17 13:00 | ALTALINK | TE | 268S Whitecourt | breaker fail trip test | 4 Hours
Daily |
|
05-Nov-17 09:00 | 05-Nov-17 12:00 | ALTALINK | TE | 225L (385s Spring Coulee - 225s Magrath) | return back protection settings to normal on 225s225W (225L) one channel at a time | 3 Hours
Daily |
|
05-Nov-17 21:15 | 06-Nov-17 00:45 | ENMAX, ALTALINK | Outage | 693L (42s Sarcee - ENMAX 10) | high load move | 3.5 Hours
Continuous |
|
06-Nov-17 07:00 | 06-Nov-17 17:00 | Saskpower | Outage | Sask Power S1C line | removal of S1C connection to SW808LM and connect to SW812LM | 10 Hours
Continuous |
AB-SK |
06-Nov-17 08:00 | 10-Nov-17 16:00 | ENMAX | Outage | 11.1TR (ENMAX 11),11.4TR (ENMAX 11),11.81L (ENMAX 13 - ENMAX 11) | 11s reliability upgrade, relocate line structure and 11.1TR MD replacement | 4.33 Days
Continuous |
|
06-Nov-17 08:00 | 17-Nov-17 17:00 | ATCO | TE | 9L912 (766s Nevis - 63s Red Deer) | replace 21A/9L912 relay | 11.38 Days
Continuous |
|
06-Nov-17 08:00 | 13-Nov-17 17:00 | ALTALINK | IO | 9L912 ATCO Relay - Info | ATCO Relay Work. One Relay at a time , Redundant protections remain in service at all times | 7.38 Days
Continuous |
|
06-Nov-17 08:00 | 10-Nov-17 17:00 | ALTALINK | TE | 17s Benalto RTU/SCADA | required for 17s bus protection upgrade & breaker replacement project | 4.38 Days
Daily |
|
06-Nov-17 08:00 | 07-Nov-17 17:00 | ALTALINK | TE | 320P Keephills RTU/SCADA | RTU upgrade | 1.38 Days
Daily |
|
06-Nov-17 08:00 | 10-Nov-17 16:00 | ATCO | TE | 7L45 (845s Big Mountain - 813s Little Smoky) | to update/test teleprotection circuit with Little Smoky | 4.33 Days
Daily |
|
06-Nov-17 08:00 | 09-Nov-17 15:00 | ATCO | Outage | 7L28 (717s Ethel Lake - 846s Grand Centre) | line repairs | 3.29 Days
Continuous |
|
06-Nov-17 08:00 | 08-Nov-17 16:00 | ATCO | TE | 845S Big Mountain | update/test teleprotection circuit with Little Smoky 'A' protection due to removal of Gold Creek Telecom circuit | 2.33 Days
Continuous |
|
06-Nov-17 08:00 | 10-Nov-17 16:00 | ATCO | TE | 813s Little Smoky RTU/SCADA | SCADA configuration update | 4.33 Days
Continuous |
|
06-Nov-17 08:00 | 10-Nov-17 16:00 | ATCO | TE | 798s Bridge Creek RTU/SCADA | 798S Bridge Creek - PLC configuration updates | 4.33 Days
Continuous |
|
06-Nov-17 08:00 | 12-Nov-17 16:00 | ENMAX | Outage | 11.4TR (ENMAX 11) | doble TX | 6.33 Days
Continuous |
|
06-Nov-17 08:00 | 10-Nov-17 16:00 | ENMAX | TE | ENMAX 11 | 11s reliability upgrade on 11PT138-Z32 sec. fuses | 4.33 Days
Continuous |
|
06-Nov-17 08:00 | 10-Nov-17 16:00 | ENMAX | TE | 11.1TR (ENMAX 11),11.2TR (ENMAX 11) | 11s reliability upgrade on A & B protection | 4.33 Days
Continuous |
|
06-Nov-17 09:00 | 10-Nov-17 16:00 | ATCO | TE | 845s Big Mountain RTU/SCADA | SCADA updates | 4.29 Days
Continuous |
|
06-Nov-17 10:00 | 08-Nov-17 16:00 | ATCO | TE | A793s West Peace RTU/SCADA | 793 West Peace RTU update | 2.25 Days
Continuous |
|
06-Nov-17 10:00 | 09-Nov-17 14:00 | ATCO | TE | 927s Buchanan Creek RTU/SCADA | download RTU and update program | 3.17 Days
Continuous |
|
06-Nov-17 11:00 | 06-Nov-17 17:00 | ALTALINK | Outage | 67s T1 (67s Stirling) | 67s Pin cap insulator broke on the conductor from 67s30 to the 25kV bus. Change all 3 pin caps. | 6 Hours
Daily |
|
06-Nov-17 11:00 | 06-Nov-17 17:00 | ALTALINK | TE | 443S South Mayerthorpe | relay maintenance | 6 Hours
Daily |
|
06-Nov-17 11:00 | 06-Nov-17 17:00 | ALTALINK | TE | 325s Leduc RTU/SCADA | relay maintenance | 6 Hours
Daily |
|
06-Nov-17 11:00 | 07-Nov-17 17:00 | ALTALINK | TE | 262S Rocky Mountain House | techs to complete relay maintenance | 30 Hours
Continuous |
|
06-Nov-17 11:00 | 07-Nov-17 17:00 | ALTALINK | TE | 932L (74s Janet - 162s Beddington) | techs to complete relay maintenance | 30 Hours
Continuous |
|
06-Nov-17 11:00 | 07-Nov-17 17:00 | ALTALINK | Outage | 320p 152 (320p Keephills) | migrate controls and annunciation and analogs to new RTU | 30 Hours
Continuous |
|
06-Nov-17 12:00 | 10-Nov-17 14:00 | ATCO | TE | 811s Clairmont Lake RTU/SCADA | download new firmware and RTU program | 4.08 Days
Continuous |
|
06-Nov-17 12:30 | 13-Nov-17 15:00 | REDDEER | Outage | 217s T1 (217s North Red Deer) | replace Altalink revenue metering CT's for T1 | 7.1 Days
Continuous |
|
06-Nov-17 13:00 | 08-Nov-17 16:00 | ALTALINK | Outage | 426L (194s South Red Deer - 63s Red Deer),194s 426 (194s South Red deer) | maintain 138kV HPF minimum oil breaker Sprecher | 2.13 Days
Continuous |
|
06-Nov-17 13:00 | 06-Nov-17 17:00 | ATCO | TE | 794s Valleyview RTU/SCADA | change RTU configuration | 4 Hours
Continuous |
|
06-Nov-17 14:00 | 06-Nov-17 16:00 | ATCO | TE | 790S Poplar Hill | cutover of 7L07 A/B protection circuits | 2 Hours
Continuous |
|
06-Nov-17 15:01 | 02-Jan-18 16:00 | ATCO | Outage | 863S Paintearth,9L948 (650s Hansman Lake - 863s Paintearth) | 240 kV switch replacement | 57.04 Days
Continuous |
|
07-Nov-17 07:00 | 18-Nov-17 09:00 | ALTALINK | Trans Test | 522s T2 (522s Cooking Lake) | [SWEATD] pull Fortis feeders into substation, close Open Points "L", "R", "N", "M” | 11.08 Days
Continuous |
|
07-Nov-17 08:00 | 24-Nov-17 16:00 | ENMAX | Outage | 1.85L (ENMAX 1 - ENMAX 8),Enmax 8 B138-2A0 (ENMAX 8),8.5TR (ENMAX 8),8.6TR (ENMAX 8) | HV breaker inspection | 17.33 Days
Continuous |
|
07-Nov-17 08:00 | 08-Nov-17 17:00 | ATCO | Outage | 7L79 (771s Veteran - 892s Ribstone Creek) | mitigate some of the areas on 7L79 and 7L696 that really get affected by hoar frost | 1.38 Days
Continuous |
|
07-Nov-17 08:00 | 08-Nov-17 17:00 | ATCO | Outage | 7L696 (508s Lakesend - 892s Ribstone Creek) | mitigate some of the areas on 7L79 and 7L696 that really get affected by hoar frost | 1.38 Days
Continuous |
|
07-Nov-17 08:00 | 07-Nov-17 17:00 | ALTALINK | RB | 761L (71s Lamoureux - 38s East Edmonton) | recloser to assist Rogers Cable-921L structure 8 | 9 Hours
Daily |
|
07-Nov-17 08:00 | 07-Nov-17 17:00 | ALTALINK, EPCOR | RB | 921L (71s Lamoureux - 987s Clover Bar) | recloser to assist Rogers Cable | 9 Hours
Daily |
|
07-Nov-17 08:00 | 08-Nov-17 17:00 | ALTALINK | IO | 7L696/696L (A892s - 508s) - ATCO Advice | emergency repair by hoar frost | 1.38 Days
Continuous |
|
07-Nov-17 08:00 | 08-Nov-17 17:00 | ALTALINK | IO | 7L79 (A771s-A892s-A932s) - ATCO Info | emergency repair affected by hoar frost | 1.38 Days
Continuous |
|
07-Nov-17 08:00 | 17-Nov-17 16:00 | ATCO | TE | 801S Anderson,801s 901T (801s Anderson) | to test new 9L97, 905 and 906 circuits | 10.33 Days
Continuous |
|
07-Nov-17 08:00 | 04-Dec-17 16:00 | ATCO | TE | 9L99 (807s Sheerness - 801s Anderson) | protection upgrade | 27.33 Days
Continuous |
|
07-Nov-17 08:30 | 09-Nov-17 18:00 | SUNCOR | Outage | 29EDD-94 952_9701 (29EDD-94) | repair leaking gasket on SF-6 breaker | 2.4 Days
Continuous |
|
07-Nov-17 08:30 | 07-Nov-17 16:00 | ATCO | TE | 706s Irish Creek RTU/SCADA | download RTU program to change 51SN status | 7.5 Hours
Continuous |
|
07-Nov-17 09:00 | 07-Nov-17 15:00 | ALTALINK | TE | AltaLink Radio Tower | test new radios for the 9495R Alder Flats - 9516R Tomahawk radio path | 6 Hours
Daily |
|
07-Nov-17 09:30 | 07-Nov-17 11:30 | ATCO | TE | 970s Bourque RTU/SCADA | 970S historian RTU configuration | 2 Hours
Continuous |
|
07-Nov-17 12:00 | 07-Nov-17 15:00 | ATCO | TE | 813S Little Smoky | cutover of 7L46 a/b protection circuits | 3 Hours
Continuous |
|
08-Nov-17 00:00 | 08-Nov-17 05:00 | PANC | TE | CAVALIER Cavalier RTU/SCADA | network outage | 5 Hours
Continuous |
|
08-Nov-17 00:01 | 08-Nov-17 02:00 | ALTALINK | Outage | 297s 757 (297s Rimbey) | urgent: replace defective heater | 119 Mins
Daily |
|
08-Nov-17 06:30 | 08-Nov-17 18:30 | EPCOR | Outage | Kennedale K724 (Kennedale),Kennedale K723 (Kennedale),72KN23 (Namao - Kennedale) | replace faulty CVT | 12 Hours
Continuous |
|
08-Nov-17 07:00 | 09-Nov-17 17:00 | ALTALINK | Outage | 320p 752 (320p Keephills) | migrate controls, annunciation and analogs to new RTU | 1.42 Days
Continuous |
|
08-Nov-17 07:00 | 10-Nov-17 14:00 | ENMAX | Outage | ENMAX 25 B240-D131 (ENMAX 25),ENMAX 25 B240-D132 (ENMAX 25) | repair SW132, SF6 gas sample on D131 | 2.29 Days
Continuous |
|
08-Nov-17 07:00 | 09-Nov-17 17:00 | EPCOR | Outage | 803s T2 (803s Lambton),803s L2402 (803s Lambton),803s L2405 (803s Lambton) | cutover of new relay protection on T2 | 1.42 Days
Continuous |
|
08-Nov-17 07:15 | 08-Nov-17 17:45 | ALTALINK | Outage | 729L (285s East Camrose - 542s Ervick) | emergency repair; replace insulators | 10.5 Hours
Daily |
|
08-Nov-17 08:00 | 08-Nov-17 17:00 | ALTALINK | Outage | 74s 103 (74s Janet),74s C4 (74s Janet) | C phase mechanical local/remote switch does not work and will be rewired | 9 Hours
Daily |
|
08-Nov-17 08:00 | 08-Nov-17 17:00 | ALTALINK | Outage | 33s3 (33s Spray) | routine maintenance | 9 Hours
Daily |
|
08-Nov-17 08:15 | 08-Nov-17 11:45 | ALTALINK | Outage | 671L (58s Edson - 39s Bickerdike),58s 671 (58s Edson) | high load move | 3.5 Hours
Daily |
|
08-Nov-17 09:00 | 08-Nov-17 13:00 | ALTALINK | TE | 649s Chappice Lake RTU/SCADA | RTU configuration change | 4 Hours
Daily |
|
08-Nov-17 09:00 | 08-Nov-17 15:00 | REDDEER | TE | 217s North Red Deer RTU/SCADA | required for 217s T1 CT replacement | 6 Hours
Daily |
|
08-Nov-17 09:00 | 08-Nov-17 17:00 | ALTALINK | TE | 331s Ponoka RTU/SCADA | update supervisory configuration and complete checkout | 8 Hours
Daily |
|
08-Nov-17 10:00 | 08-Nov-17 10:30 | ATCO | TE | ATCO Radio Tower | RAS 139 move from 3600 to SAR, Nevis and Cordel telecom | 30 Mins
Continuous |
|
08-Nov-17 10:00 | 08-Nov-17 14:00 | ATCO | TE | 733s Simonette RTU/SCADA | 733S RTU configuration upgrade | 4 Hours
Continuous |
|
08-Nov-17 11:00 | 08-Nov-17 14:00 | ALTALINK | TE | 895S Suffield | relay maintenance, battery under voltage protection and meter reseal | 3 Hours
Daily |
|
09-Nov-17 08:00 | 09-Nov-17 17:00 | ALTALINK | TE | 320P Keephills RTU/SCADA | RTU upgrade | 9 Hours
Daily |
|
09-Nov-17 08:00 | 10-Nov-17 17:00 | SUNCOR | Outage | 635EDD-1000 635PK-1002 (635EDD-1000),635EDD-1000 635PK-1003 (635EDD-1000) | capacitor bank protection setting change and test activities | 1.38 Days
Continuous |
|
09-Nov-17 08:00 | 09-Nov-17 11:00 | ALTALINK | TE | AltaLink Radio Tower | place new radios for the 9495R Alder Flats - 9516R Tomahawk radio path into service | 3 Hours
Daily |
|
09-Nov-17 08:00 | 09-Nov-17 12:00 | ENMAX | Outage | 34.4TR (ENMAX 34),21.61L (ENMAX 21 - ENMAX 34) | install OAC/CAC relays for RTU upgrade | 4 Hours
Continuous |
|
09-Nov-17 08:00 | 09-Nov-17 16:00 | ATCO | TE | 801S Anderson,2075S Newell,2029s Heathfield | upgrade Veg remote access server switches per NERC/CIP requiremen,upgrade Veg remote access server switches per NERC/CIP requirements | 8 Hours
Continuous |
|
09-Nov-17 08:30 | 10-Nov-17 18:00 | ATCO | Trans Test | 959S SVC (959s Lanfine) | Lanfine SVC - system tests | 1.4 Days
Continuous |
|
09-Nov-17 08:30 | 15-Nov-17 16:30 | REDDEER | Outage | 194s T2 (194s South Red Deer) | protection replacement | 6.33 Days
Continuous |
|
09-Nov-17 08:30 | 10-Nov-17 18:00 | ATCO | IO | 959S SVC (959s Lanfine) | Atco maintenance (SVC control issue) | 1.4 Days
Continuous |
|
09-Nov-17 09:00 | 09-Nov-17 12:00 | ATCO | TE | 813s Little Smoky RTU/SCADA | change RTU configuration | 3 Hours
Continuous |
|
09-Nov-17 09:30 | 09-Nov-17 11:30 | ATCO | TE | 936s Norberg RTU/SCADA | RTU configuration upgrade | 2 Hours
Continuous |
|
09-Nov-17 10:00 | 09-Nov-17 14:00 | ATCO | TE | 7LA33 (758s CG&E - 7L33 tap) | cutover of 7LA33A/B 3-terminal protection | 4 Hours
Continuous |
|
09-Nov-17 12:00 | 09-Nov-17 16:00 | ENMAX | Outage | 16.60L (ENMAX 34 - ENMAX 16),34.2TR (ENMAX 34),34.3TR (ENMAX 34) | install OAC/CAC relays for RTU upgrade | 4 Hours
Continuous |
|
09-Nov-17 14:00 | 09-Nov-17 15:00 | ATCO | TE | 749s Flyingshot Lake RTU/SCADA | migration of SCADA circuit | 60 Mins
Continuous |
This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein. © 2009 Alberta Electric System Operator. All rights reserved |