Approved Outages |
Previous Version | |
Download CSV |
From | To | Owner | Type | Element | Scheduled Activity | Date/Time Comments | Interconnection |
---|---|---|---|---|---|---|---|
24-Jul-15 12:00 | 31-Mar-17 16:00 | ATCO | IO | 736s 601T (736s Valleyview P.R.O.P.L.),6L54 (736s Valleyviewp.R.O.P.L. - 734s Sturgeon) | customer request to permanently disconnect secondary from substation to their site | 616.17 Days
Continuous |
|
31-Jul-15 18:01 | 31-Jan-17 12:45 | EPCOR | Outage | Rossdale C1 | forced outage | 549.82 Days
Continuous |
|
18-Apr-16 08:00 | 31-Mar-17 16:00 | ENMAX | Outage | 41.1C (ENMAX 41) | forced outage | 347.33 Days
Continuous |
|
27-Jun-16 09:00 | 31-Mar-17 16:00 | ATCO | Outage | 757S Battle River | cracked insulators maintenance on main bus | 277.29 Days
Continuous |
|
31-Aug-16 02:59 | 31-Jan-17 16:00 | WINDYPWPL | Outage | 112s CAP1 (112s Windy Point) | forced outage; blown capacitor | 153.58 Days
Continuous |
|
31-Aug-16 08:00 | 31-Jan-17 16:00 | ATCO | Outage | 6L06 (705s Kitscoty - 751s Hill) | crews working in close proximity to 6L06 | 153.38 Days
Continuous |
|
07-Sep-16 17:00 | 01-May-17 17:00 | BCH | Outage | RAS3 - Pocaterra RAS | forced outage | 236 Days
Continuous |
AB-BC |
14-Sep-16 17:46 | 27-Feb-17 17:00 | ALTALINK | Outage | 755L (535s Joffre - 247s Piper Creek) | complete 755L rebuild | 166.01 Days
Continuous |
|
21-Nov-16 08:00 | 27-Jan-17 16:00 | ATCO | TE | 848s Ruth Lake RTU/SCADA | set-up / commission new RTU | 67.33 Days
Continuous |
|
21-Nov-16 08:00 | 30-Jun-17 16:00 | ATCO | Outage | 789s 706C (789s Keg River) | forced out - repair oil leak on CT | 221.29 Days
Continuous |
|
14-Dec-16 16:01 | 01-Feb-17 17:00 | ENMAX | Outage | ENMAX 65 B138-D84 (ENMAX 65) | (FATDSC) - install 65MD138-54.81, SW 89, 65B138-D83 | 49.04 Days
Continuous |
|
20-Dec-16 08:00 | 31-Jan-17 16:30 | ATCO | TE | 757s Battle River RTU/SCADA | update the RTU program for the GPS clock addition | 42.35 Days
Continuous |
|
02-Jan-17 08:00 | 31-Jan-17 16:00 | ATCO | TE | 931S Bohn | Alarm testing on new equipment. Some alarms will be visible to TOC. Station Major Alarms may be present for more than 10 minutes. | 29.33 Days
Continuous |
|
03-Jan-17 06:00 | 31-Mar-17 16:30 | ALTALINK | RB | 551L (123s Banff - 953s Lake Louise) | line rebuild | 87.4 Days
Daily |
|
04-Jan-17 07:00 | 30-Jan-17 14:30 | ALTALINK | Outage | 65s T3 (65s High River) | south 25KV bus upgrades and expansion, install new Fortis feeders for 63L, 2361L, 2362L and AMI cables upto fenceline | 26.31 Days
Continuous |
|
04-Jan-17 07:30 | 02-Feb-17 17:30 | ALTALINK | RB | 1107L (ENMAX 65 - 237s Foothills) | damper replacements | 29.42 Days
Daily |
|
04-Jan-17 07:30 | 03-Mar-17 17:30 | ALTALINK | Outage | 1037L (237s Foothills - 138 Windy Flats) | damper replacement | 58.42 Days
Continuous |
|
04-Jan-17 07:30 | 02-Feb-17 17:30 | ALTALINK | Outage | 1106L (ENMAX 65 - 237s Foothills) | damper replacements | 29.42 Days
Continuous |
|
04-Jan-17 07:30 | 24-Feb-17 17:30 | ALTALINK | RB | 1038L (138s Windy Flats - 237s Foothills) | damper replacements | 51.42 Days
Daily |
|
05-Jan-17 07:30 | 20-Mar-17 16:30 | ALTALINK | Outage | 853L (504s Queenstown - 853L76A) | Line rebuild | 74.33 Days
Continuous |
|
05-Jan-17 07:30 | 17-Feb-17 17:30 | ALTALINK | Outage | 1043L (320p Keephills - 816s Petrolia) | damper replacements | 43.42 Days
Continuous |
|
05-Jan-17 07:30 | 17-Feb-17 17:30 | EPCOR | IO | ALTALINK - 1043L (320p - E816s) - GOI | damper replacements | 43.42 Days
Continuous |
|
10-Jan-17 17:00 | 30-Apr-17 16:00 | ATCO | Outage | 732s 902T (732s Mitsue) | forced outage. transformer tap changer | 109.92 Days
Continuous |
|
11-Jan-17 06:55 | 30-Jan-17 17:05 | ALTALINK | RB | 892L (895s Suffield - 244s Bowmanton) | Working on adjacent circuit 675L | 19.42 Days
Daily |
|
17-Jan-17 07:00 | 30-Jan-17 17:00 | ATCO | Outage | 700s 702T (700s Bonnyville) | close jumper J2 (ties 500BS2 to 500BS3), rebuild 504 and 505 structures, recable 702T, 702TCS, 502TD | 13.42 Days
Continuous |
|
23-Jan-17 07:00 | 10-Feb-17 17:00 | EPCOR | TE | 805s T1 (805s Jasper),805s T3 (805s Jasper),805s T4 (805s Jasper) | performing relay calibration as part of relay maintenance. | 18.42 Days
Daily |
|
23-Jan-17 07:00 | 09-Feb-17 17:00 | ALTALINK | IO | 102S Langdon | CIP info, access request for the installation of new equipment | 17.42 Days
Continuous |
|
23-Jan-17 07:00 | 09-Feb-17 17:00 | ALTALINK | IO | 510S Sunnybrook | CIP info, access request for the installation of new equipment | 17.42 Days
Continuous |
|
23-Jan-17 07:00 | 27-Jan-17 16:00 | Medicine Hat | Outage | MH69s3 MH69_311 (MH69s3 South Ridge),MH69s3 MH69_308 (MH69s3 South Ridge),MH69s3 T31 (MH69s3 South Ridge),MH-30L (MH69s3 South Ridge - MH69s5 NE Crescent Heights) | replace disconnect switch MH69-309 & MH69-310 | 4.38 Days
Continuous |
|
23-Jan-17 08:00 | 03-Feb-17 16:00 | ENMAX | Outage | 20.82L (ENMAX 21 - ENMAX 20) | line protection upgrade | 11.33 Days
Continuous |
|
23-Jan-17 08:00 | 03-Feb-17 17:00 | ATCO | Outage | 7L65 (709s Vegreville - 710s Vermilion) | line work to install conductor splice at each structure and construction to construct bypass to build T Tap for new 2019s Vincent sub | 11.38 Days
Continuous |
|
23-Jan-17 08:00 | 03-Feb-17 16:00 | ENMAX | TE | ENMAX 21 RTU/SCADA | line protection upgrade | 11.33 Days
Continuous |
|
23-Jan-17 08:00 | 03-Feb-17 17:00 | ALTALINK | IO | 7L65 - ATCO Info | ATCO maintenance | 11.38 Days
Continuous |
|
23-Jan-17 08:00 | 03-Feb-17 16:00 | ENMAX | TE | 20PT138-Z31 (ENMAX 20) | line protection upgrade | 11.33 Days
Continuous |
|
23-Jan-17 08:00 | 01-Feb-17 16:00 | ENMAX | TE | 7.84L (ENMAX 36 - ENMAX 7) | end to end testing | 9.33 Days
Continuous |
|
23-Jan-17 08:00 | 01-Feb-17 16:00 | ENMAX, ALTALINK | TE | 37.82L (74s Janet - ENMAX 37) | end to end testing | 9.33 Days
Continuous |
|
23-Jan-17 08:00 | 03-Feb-17 16:00 | ENMAX | TE | ENMAX 5 | test bus diff relays - west 138 kV bus Z31 | 11.33 Days
Continuous |
|
23-Jan-17 08:00 | 03-Feb-17 16:00 | ALTALINK | IO | 21.80L Enmax Info | line protection upgrade | 11.33 Days
Daily |
|
23-Jan-17 08:00 | 27-Jan-17 17:00 | ATCO | TE | 700s Bonnyville RTU/SCADA | download RTU and update HMI program | 4.38 Days
Continuous |
|
23-Jan-17 08:00 | 27-Jan-17 16:00 | ATCO | RB | 791s 702 (791s Rainbow Lake) | BCH work on 7L81 (1L359) to fix leaning pole | 4.33 Days
Daily |
|
23-Jan-17 12:00 | 27-Jan-17 16:00 | ATCO | TE | 931s Bohn RTU/SCADA | update RTU and HMI configurations and test with STG | 4.17 Days
Continuous |
|
24-Jan-17 07:30 | 27-Jan-17 17:30 | ALTALINK | RB | 757L (17s Benalto - 297s Rimbey) | structure replacement | 3.42 Days
Continuous |
|
24-Jan-17 07:30 | 27-Jan-17 17:30 | ALTALINK | RB | 801AL (445s Elk River - 801AL0),801L (294s Brazeau Outlet Works - 358s Amoco Brazeau) | component replacement and maintenance | 3.42 Days
Daily |
|
24-Jan-17 09:00 | 02-Feb-17 16:00 | ATCO | IO | 749S 7L33 Protection Relay,845S 7L33 Protection Relay,Kleskun_T-Telecom | ***PREP WORK FOR RADIO REPLACEMENT*** | 9.29 Days
Continuous |
|
25-Jan-17 06:30 | 30-Jan-17 17:30 | AESO | Outage | 892L (895s Suffield - 244s Bowmanton) | replace saddles | 5.46 Days
Continuous |
|
25-Jan-17 06:55 | 30-Jan-17 17:05 | ALTALINK | RB | 675L (244s Bowmanton - 41s Medicine Hat) | working on adjacent curciut (892L) | 5.42 Days
Daily |
|
25-Jan-17 07:00 | 08-Feb-17 09:00 | ATCO | IO | 13L50 (2029s Heathfield - 2075s Newell) | ATCO outage -valve hall reactor replacements at A2029s & A2075s | 14.08 Days
Continuous |
|
25-Jan-17 07:00 | 08-Feb-17 09:00 | ATCO | Outage | 2075s ACF11 (2075s Newell) | repair faulty connections on the AC filter bus #1 inspect filter banks and SVC | 14.08 Days
Continuous |
|
25-Jan-17 07:00 | 08-Feb-17 09:00 | ATCO | Outage | 2029s Heathfield | removing valve hall reactors and replacing them with refurbished ones | 14.08 Days
Continuous |
|
25-Jan-17 07:00 | 08-Feb-17 09:00 | ATCO | Outage | 2075S Newell,13L50 (2029s Heathfield - 2075s Newell),2029s Heathfield | install new/refurbished valve hall reactors | 14.08 Days
Continuous |
|
25-Jan-17 07:00 | 08-Feb-17 09:00 | ATCO | Outage | 2029s ACF11 (2029s Heathfield) | repair poor connections to fix corona noise | 14.08 Days
Continuous |
|
25-Jan-17 07:00 | 08-Feb-17 09:00 | ATCO | Outage | 2075s SVC2 (2075s Newell) | 2075s ACF21 (SVC) required in order to properly isolate the fence | 14.08 Days
Continuous |
|
25-Jan-17 07:30 | 07-Feb-17 17:30 | ALTALINK | Outage | 1212L (89s Ellerslie - 12s Heartland) | damper replacement | 13.42 Days
Continuous |
|
25-Jan-17 07:30 | 07-Feb-17 17:30 | ALTALINK | RB | 1206L (89s Ellerslie - 12s Heartland) | damper replacement | 13.42 Days
Daily |
|
25-Jan-17 08:00 | 27-Jan-17 17:00 | ATCO | TE | 820s 701T (820s Hangingstone) | 820S 701T 50/51 relay testing | 2.38 Days
Continuous |
|
26-Jan-17 07:00 | 31-Jan-17 16:00 | ATCO | TE | 931s 701T (931s Bohn) | 931s 701T protection changes | 5.38 Days
Continuous |
|
26-Jan-17 07:00 | 31-Jan-17 16:00 | ATCO | TE | 931S Bohn | 931s 144kV breaker relays - update and test 50BF/701 relay settings | 5.38 Days
Continuous |
|
27-Jan-17 07:30 | 09-Feb-17 17:30 | ALTALINK | Outage | 850L (525s Carseland - 678s Okotoks) | damper replacements | 13.42 Days
Continuous |
|
27-Jan-17 08:00 | 27-Jan-17 17:00 | ATCO | TE | 820s 700BS1 144kV Bus (820s Hangingstone) | 144kV bus protection - 820S 702BF relay testing | 9 Hours
Continuous |
|
27-Jan-17 09:00 | 27-Jan-17 13:00 | ATCO | RB | 766S Nevis,7L16 (766s Nevis - 948s Heatburg) | 5L244 RB: connect mobile sub 750s to 7L16 and 5L244,connect mobile sub 750s to 7L16 and 5L244 | 4 Hours
Continuous |
|
27-Jan-17 09:00 | 11-Feb-17 16:00 | ATCO | RB | 7L16 (766s Nevis - 948s Heatburg) | 750S mobile sub tapped up, connected & operated, removed from 7L16, to protect 750s | 15.29 Days
Continuous |
|
28-Jan-17 07:00 | 29-Jan-17 18:00 | ENMAX | RB | 26.83L (ENMAX 65 - ENMAX 26) | string conductor near line | 1.46 Days
Daily |
|
28-Jan-17 09:00 | 03-Feb-17 17:30 | ATCO | Outage | 766s 701T (766s Nevis),766s 901T (766s Nevis),7L143 (766s Nevis - 769s Stettler),7L16 (766s Nevis - 948s Heatburg) | replace 701T and sample 700PT1 | 6.35 Days
Continuous |
|
29-Jan-17 07:00 | 29-Jan-17 17:30 | ALTALINK | TE | 65s High River 138kV Bus 1 | 138kV bus protection work and testing | 10.5 Hours
Daily |
|
30-Jan-17 06:00 | 12-Feb-17 18:00 | ENMAX | TE | ENMAX 41 RTU/SCADA | DPAC RTU replacement | 13.5 Days
Daily |
|
30-Jan-17 06:00 | 03-Feb-17 18:00 | ENMAX | TE | ENMAX 6 RTU/SCADA,ENMAX 7 RTU/SCADA | RTU replacement. (RTU defective) | 4.5 Days
Daily |
|
30-Jan-17 07:00 | 02-Feb-17 17:00 | ATCO | RB | 9L27 (863s Paintearth - 755s Cordel) | inspection / X brace replacement | 3.42 Days
Daily |
|
30-Jan-17 07:00 | 21-Apr-17 17:00 | ATCO | Outage | 800s 701T (800s Friedenstal) | replace 701T | 81.38 Days
Continuous |
|
30-Jan-17 07:00 | 24-Feb-17 17:00 | EPCOR | TE | 52s E1T1 (52s East Industrial),52s E2T2 (52s East Industrial) | performing relay maintenance to Tx1, Tx2, E2401 BF, E2402 BF | 25.42 Days
Daily |
|
30-Jan-17 07:00 | 31-Jan-17 16:00 | Medicine Hat | Outage | MH69s2 MH69_202 (MH69s2 North Industrial),MH69s6 MH69_602 (MH69s6 Riverview),MH69s6 MH69_604 (MH69s6 Riverview),MH69s6 MH69_607 (MH69s6 Riverview),MH69s6 MH69_616 (MH69s6 Riverview) | inspection and maintenance | 1.38 Days
Continuous |
|
30-Jan-17 07:30 | 10-Feb-17 17:30 | ALTALINK | Outage | 39s 352 (39s Bickerdike) | replacing existing breaker with a new SF6 breaker | 11.42 Days
Continuous |
|
30-Jan-17 08:00 | 30-Jan-17 17:00 | ATCO | TE | 7L38 (875s Algar - 917s Horse River) | 875S 7L38 21A relay testing | 9 Hours
Continuous |
|
30-Jan-17 08:00 | 03-Feb-17 16:00 | ENMAX | TE | ENMAX 23 | test auto switching relay | 4.33 Days
Daily |
|
30-Jan-17 08:00 | 03-Feb-17 16:00 | ENMAX | TE | ENMAX 41 | test auto switching relay | 4.33 Days
Daily |
|
30-Jan-17 09:00 | 02-Feb-17 17:00 | ATCO | RB | 7L75 (A793s West Peace River - 800s Friedenstal) | 7L75 mitigation replace poles | 3.33 Days
Daily |
|
30-Jan-17 09:30 | 03-Feb-17 17:30 | ALTALINK | RB | 757L (17s Benalto - 297s Rimbey) | structure replacement | 4.33 Days
Continuous |
|
30-Jan-17 09:30 | 03-Feb-17 17:30 | ALTALINK | RB | 801AL (445s Elk River - 801AL0),801L (294s Brazeau Outlet Works - 358s Amoco Brazeau) | component replacement and maintenance | 4.33 Days
Daily |
|
30-Jan-17 11:00 | 30-Jan-17 17:00 | ALTALINK | TE | 538s Buford RTU/SCADA | change the SMP to communicate on fiber as it is currently on copper | 6 Hours
Daily |
|
30-Jan-17 12:00 | 31-Jan-17 16:00 | ALTALINK | TE | 62S Brazeau | relay maintenance | 28 Hours
Daily |
|
30-Jan-17 12:00 | 03-Feb-17 12:00 | ATCO | TE | 731s Elmworth RTU/SCADA | D20MX RTU firmware upgrade | 4 Days
Continuous |
|
30-Jan-17 14:31 | 31-Jan-17 17:30 | ALTALINK | Outage | 65s T3 (65s High River) | T3 outage to connect temp cables to low-side | 26.98 Hours
Daily |
|
31-Jan-17 06:30 | 17-Feb-17 17:30 | ALTALINK | Outage | 676L (523s Bullshead - 244s Bowmanton) | replace saddles | 17.46 Days
Continuous |
|
31-Jan-17 06:55 | 12-Feb-17 17:05 | ALTALINK | RB | 879L (368s Burdett - 244s Bowmanton) | working on adjacent circuit (676L) | 12.42 Days
Daily |
|
31-Jan-17 07:00 | 17-Feb-17 17:00 | EPCOR, ALTALINK | TE | 803s T3 (803s Lambton),1059L (38s East Edmonton - 803s Lambton) | performing relay calibration as part of relay maintenance | 17.42 Days
Daily |
|
31-Jan-17 07:00 | 17-Feb-17 17:00 | EPCOR | TE | 72LH8 (Hardisty - 803s Lambton),72LS24 (Strathcona - 803s Lambton) | performing relay calibration as part of relay maintenance | 17.42 Days
Daily |
|
31-Jan-17 08:00 | 31-Jan-17 15:00 | ALTALINK | TE | 62s Brazeau RTU/SCADA | replace back up batteries on substation RTU | 7 Hours
Daily |
|
31-Jan-17 08:00 | 02-Feb-17 17:00 | ALTALINK | TE | 526s Relays & RTU | RTU troubleshoot, relay maintenance and redundant protections one at a time | 2.38 Days
Daily |
|
31-Jan-17 08:00 | 31-Jan-17 12:00 | ENMAX | Outage | 23.3TR (ENMAX 23) | plug installation | 4 Hours
Continuous |
|
31-Jan-17 09:00 | 31-Jan-17 17:00 | ALTALINK | TE | 729L (285s East Camrose - 542s Ervick) | relay maintenance | 8 Hours
Daily |
|
31-Jan-17 09:00 | 02-Feb-17 17:00 | ALTALINK | TE | 263s Strachan RTU/SCADA | update RTU config | 2.33 Days
Continuous |
|
31-Jan-17 10:00 | 31-Jan-17 18:00 | ATCO | TE | 740s 702T (740s H.R.Milner) | overcurrent relay out for maintenance | 8 Hours
Continuous |
|
31-Jan-17 12:00 | 01-Feb-17 16:00 | ENMAX | Outage | 23.4TR (ENMAX 23) | test TR diff relay | 28 Hours
Continuous |
|
31-Jan-17 17:31 | 07-Feb-17 07:59 | ALTALINK | Outage | 65s T2 (65s High River) | connect new 25kV bus to existing south bus, replace SS2, replace 63L overhead conductor | 6.6 Days
Daily |
|
01-Feb-17 07:00 | 02-Feb-17 17:00 | EPCOR | Outage | 113s T2 (113s Inland Cement) | protection repair | 1.42 Days
Continuous |
|
01-Feb-17 07:00 | 03-Feb-17 16:00 | Medicine Hat, CMH | Outage | MH69s3 MH69_302 (MH69s3 South Ridge),MH69s6 MH69_608 (MH69s6 Riverview),MH69s6 MH69_611 (MH69s6 Riverview),MH69s6 MH69_614 (MH69s6 Riverview),MH69s6 MH69_616 (MH69s6 Riverview),20L (MH69S-6 Riverview - MH69S-3 South Ridge),8L (MH69S-6 Riverview - MH69S-1 Power Plant) | inspection and maintenance | 2.38 Days
Continuous |
|
01-Feb-17 07:00 | 03-Feb-17 17:00 | ALTALINK | TE | 454s Buck Lake RTU/SCADA,341s Sand Hills Sub RTU/SCADA,392s Black Diamond RTU/SCADA,993s Abee RTU/SCADA | SFE - supervisory. Affects visibility | 2.42 Days
Continuous |
|
01-Feb-17 07:30 | 02-Feb-17 14:30 | ALTALINK | Outage | 150L (42s Sarcee - 150L47) | emergency repair; structure replacement | 31 Hours
Continuous |
|
01-Feb-17 07:30 | 01-Feb-17 10:00 | ATCO | TE | 740s 703T (740s H.R.Milner) | 703T overcurrent relay out for maintenance | 2.5 Hours
Continuous |
|
01-Feb-17 08:00 | 01-Feb-17 17:00 | ALTALINK | TE | 1201L (520s Bennett - BCH Cranbrook) | SAs per OP eng setting change required on SEL421 A21/51N/67N/L3 , SEL421 B21/51N/67N/L3. | 9 Hours
Daily |
|
01-Feb-17 08:00 | 01-Feb-17 16:00 | ENMAX | Outage | 33.1TR (ENMAX 33) | CT and PT measurements required | 8 Hours
Continuous |
|
01-Feb-17 08:00 | 01-Feb-17 12:00 | ENMAX | Outage | 14.1TR (ENMAX 14) | install Roxtek plugs in ducts | 4 Hours
Continuous |
|
01-Feb-17 08:30 | 01-Feb-17 15:30 | ATCO | TE | 727s 601T (727s Kinuso) | testing 50N/601T. Shared on the blocking switch for this relay is 67N/6L91. | 7 Hours
Continuous |
|
01-Feb-17 09:00 | 01-Feb-17 15:00 | ALTALINK | IO | AltaLink Radio Tower | 253s Blackie telecomm - routine site inspection & maintenance work | 6 Hours
Daily |
|
01-Feb-17 09:00 | 02-Feb-17 17:00 | ALTALINK | TE | 523S Bullshead | standard relay maintenance. | 1.33 Days
Continuous |
|
01-Feb-17 09:00 | 01-Feb-17 15:00 | ATCO | TE | ATCO Radio Tower | Newell SAR-7705 requires a Firmware upgrade to Version 6 | 6 Hours
Daily |
|
01-Feb-17 10:00 | 01-Feb-17 18:00 | ATCO | TE | 740S H.R.Milner | 740s HR Milner 144kV bus differential relay testing | 8 Hours
Continuous |
|
01-Feb-17 10:00 | 01-Feb-17 17:00 | ALTALINK | TE | 37S North Calder | maintain 240 kV breaker fail protections | 7 Hours
Daily |
|
02-Feb-17 08:00 | 02-Feb-17 16:00 | ATCO | TE | 7L33 (749s Flyingshot Lake - 845s Big Mountain) | temporary protection setting for 2-40006 teleprotection outage | 8 Hours
Continuous |
|
02-Feb-17 08:00 | 02-Feb-17 17:00 | FORTIS | TE | 140s Thompson RTU/SCADA | work on radio to stop reboot errors | 9 Hours
Daily |
|
02-Feb-17 08:00 | 02-Feb-17 16:00 | ALTALINK | TE | 172S Sherritt Gordon | 172s relays. Investigate and repair low optical signal levels on MPLS. | 8 Hours
Daily |
|
02-Feb-17 08:00 | 03-Feb-17 15:30 | ATCO | TE | 844s 702T (844s AEC Mill) | 702T Relay maintenance | 31.5 Hours
Continuous |
|
02-Feb-17 08:00 | 03-Feb-17 15:30 | ATCO | TE | 844s 701T (844s AEC Mill) | 701T Relay maintenance | 31.5 Hours
Continuous |
|
02-Feb-17 08:30 | 02-Feb-17 17:00 | ALTALINK | TE | 286S Yasa | relay maintenance | 8.5 Hours
Daily |
|
02-Feb-17 09:00 | 02-Feb-17 11:00 | ATCO | TE | ATCO Radio Tower | Cassils SAR-7705 requires a Firmware upgrade to Version 6 | 2 Hours
Daily |
|
02-Feb-17 09:00 | 02-Feb-17 16:00 | ATCO | TE | 7L33 (749s Flyingshot Lake - 845s Big Mountain) | 7L33 TPR A&B and Kleskun Tower telecommunication. | 7 Hours
Continuous |
|
03-Feb-17 07:30 | 04-Mar-17 17:30 | ALTALINK | RB | 1106L (ENMAX 65 - 237s Foothills) | damper replacements | 29.42 Days
Daily |
|
03-Feb-17 07:30 | 04-Mar-17 17:30 | ALTALINK | Outage | 1107L (ENMAX 65 - 237s Foothills) | damper replacements | 29.42 Days
Continuous |
|
03-Feb-17 07:30 | 04-Mar-17 17:30 | ALTALINK | IO | 1107L (ENMAX 65 - 237s Foothills) | AltaLink work - damper replacements | 29.42 Days
Continuous |
|
03-Feb-17 07:30 | 04-Mar-17 17:30 | ALTALINK | RB | 1106L (ENMAX 65 - 237s Foothills) | ENMAX info for AltaLink damper replacements | 29.42 Days
Daily |
|
03-Feb-17 10:10 | 03-Feb-17 11:50 | ALTALINK | TE | 122s Alberta Newsprint RTU/SCADA | SCADA comms cutover | 100 Mins
Continuous |
|
03-Feb-17 17:31 | 11-Feb-17 12:00 | ATCO | Outage | 766s 701T (766s Nevis) | reconfigure 25 kV bus and soak 701T | 7.77 Days
Continuous |
This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein. © 2009 Alberta Electric System Operator. All rights reserved |