From | To | Owner | Type | Element | Scheduled Activity | Date/Time Comments | Interconnection |
---|---|---|---|---|---|---|---|
26-Jun-13 08:00 | 30-Jun-15 17:00 | ENBRIDGE | Outage | Hay Lake North Series Capacitor,Marias South Series Capacitor | Series capacitor banks were removed from service due to the Subsynchronous Control Interaction (SSCI) with connected wind farm. | 734.38 Days
Continuous |
AB-MATL |
31-Jul-13 11:00 | 31-Dec-15 18:00 | ATCO | Outage | 720s 501R (720s Wabasca) | Forced outage | 883.33 Days
Continuous |
|
01-May-14 08:00 | 07-May-15 16:00 | ENMAX | Outage | 47.2TR (ENMAX 47) | 47s major capital | 371.33 Days
Continuous |
|
03-Jun-14 11:15 | 30-Apr-15 16:00 | EPCOR | Outage | Rossdale C1 | forced outage | 331.2 Days
Continuous |
|
20-Oct-14 08:00 | 30-Apr-15 16:00 | EPCOR | Outage | Rossdale C2 | forced outage | 192.33 Days
Continuous |
|
31-Oct-14 08:00 | 21-Jun-15 16:00 | ATCO | Outage | 898s904A (898s Heart Lake),898s906B (898s Heart Lake),898s900PT3 (898s Heart Lake) | demolition of existing flex bus & structures, install new piles, structures & apparatus for switches | 233.33 Days
Continuous |
|
17-Nov-14 08:00 | 30-Jun-15 12:00 | ALTALINK | Trans Test/Comm | 12s12L70 Advice for EATL | construction of lines | 225.13 Days
Continuous |
|
17-Nov-14 08:00 | 30-Jun-15 12:00 | ALTALINK | Trans Test/Comm | 12s12L85 Advice for EATL | construction of lines | 225.13 Days
Continuous |
|
08-Dec-14 08:00 | 28-Feb-16 12:00 | ALTALINK | Outage | 983L (251S Whitla - 244S Bowmanton),964L (251s Whitla - 244s Bowmanton) | RAVI bolt replacement - deficiency from construction - SATR BW | 447.17 Days
Continuous |
|
08-Dec-14 08:00 | 25-Jun-15 12:00 | ALTALINK | Outage | 1034L (244s Bowmanton - 324s Cassils),1035L (244s Bowmanton - 324s Cassils) | RAVI bolt replacement - deficiency from construction - SATR BW | 199.13 Days
Continuous |
|
07-Jan-15 07:00 | 15-May-15 18:00 | ENMAX, ALTALINK | RB | 1003L (74s Janet - ENMAX 25) | Langdon to Janet project | 128.42 Days
Continuous |
|
07-Jan-15 07:00 | 15-May-15 18:00 | ALTALINK | RB | 937L (102s Langdon - 74s Janet) | Langdon to Janet project | 128.42 Days
Continuous |
|
26-Jan-15 07:00 | 30-Nov-15 18:00 | EPCOR | Outage | Hardisty T1 (Hardisty) | 15kV switchgear at Hardisty is being replaced | 308.46 Days
Continuous |
|
30-Jan-15 07:00 | 15-May-15 18:00 | ALTALINK | RB | 936L (102s Langdon - 5s East Calgary) | NFTP: Setting QQ Tower in Close Proximity to Line | 105.42 Days
Continuous |
|
09-Feb-15 08:00 | 09-Jul-15 16:00 | ENMAX | Outage | 5.5TR (ENMAX 5) | transformer replacement | 150.29 Days
Daily |
|
23-Feb-15 06:30 | 15-May-15 18:30 | ALTALINK | RB | 727L (74s Janet - 1140s Temp) | L to J: foundation & stringing work | 81.46 Days
Daily |
|
23-Feb-15 07:00 | 15-May-15 18:00 | ALTALINK | RB | 1080L (ENMAX 65 - ENMAX 25) | L to J: foundation & stringing work | 81.42 Days
Daily |
|
13-Mar-15 15:00 | 21-Apr-15 09:00 | ALTALINK | Outage | 310P Sundance | maintenance | 38.75 Days
Continuous |
|
16-Mar-15 08:00 | 31-Jul-15 17:00 | ATCO | TE | 856s Kinosis RTU/SCADA | download RTU & update HMI | 137.38 Days
Continuous |
|
17-Mar-15 08:00 | 12-May-15 16:00 | CapitalPower | Outage | 615s DVAR (615s Halkirk) | maintenance | 56.33 Days
Continuous |
|
19-Mar-15 16:00 | 19-Apr-15 15:59 | ALTALINK | Outage | 294s T2 (294s Brazeau Outlet Works) | metering upgrade | 31 Days
Continuous |
|
21-Mar-15 07:00 | 30-Apr-15 17:30 | ATCO | TE | 757s 705 (757s Battle River) | breaker replacement, 9L79 protection upgrade | 40.44 Days
Continuous |
|
23-Mar-15 07:00 | 30-Apr-15 17:30 | ATCO | TE | 9L79 (757s Battle River - 755s Cordel) | protection upgrade | 38.44 Days
Continuous |
|
23-Mar-15 08:00 | 29-Apr-15 16:00 | ALTALINK | Outage | 5s C3 (5s East Calgary),5s 7 (5s East Calgary),5s C4 (5s East Calgary) | ENMAX: 2s cap bank ECTP, swap AIS 5s7 to C2sGIS | 37.33 Days
Continuous |
AB-BC |
25-Mar-15 07:00 | 30-Apr-15 17:30 | ATCO | Outage | 757s 911PT (757s Battle River),757s 9L79PT (757s Battle River),757s 9L79GS1 (757s Battle River),9L79 (757s Battle River - 755s Cordel),757s 911 (757s Battle River),757s 911A (757s Battle River),757s 9L79D1 (757s Battle River) | maintenance | 36.44 Days
Continuous |
|
25-Mar-15 08:00 | 24-Apr-15 16:00 | ENMAX | Outage | ENMAX 65 B240-D131 (ENMAX 65) | modification of protection systems for the new 1106L bay | 30.33 Days
Continuous |
|
25-Mar-15 08:00 | 01-May-15 16:00 | ENMAX | TE | 65.1 TR (ENMAX 65),ENMAX 65 | protection wiring changes | 37.33 Days
Continuous |
|
26-Mar-15 08:00 | 30-Apr-15 17:00 | ALTALINK | Outage | 244s 252 (244s Bowmanton) | part of 244s152 outage | 35.38 Days
Continuous |
|
27-Mar-15 08:00 | 05-May-15 16:00 | ENMAX | Outage | 2.2TR (ENMAX 2) | ECTP: dissasemble/move/assemble/fill/comission | 39.33 Days
Continuous |
|
30-Mar-15 07:00 | 22-Apr-15 17:00 | ALTALINK | Outage | 850L (1140s Temp - 525s Carseland) | FATD - NFTP: stringing of the north side of the new triple circuit 1106L ,1107L & 850L | 23.42 Days
Continuous |
|
30-Mar-15 07:00 | 01-May-15 17:30 | ALTALINK | Outage | 291s T1 (291s Cochrane) | T1 replace, VR1 remove, & 25kv bus reconfig | 32.44 Days
Continuous |
|
30-Mar-15 10:00 | 30-Jun-15 17:30 | ATCO | TE | 898s Heart Lake RTU/SCADA | update RTU, HMI, 2032 configuration | 92.31 Days
Continuous |
|
01-Apr-15 07:30 | 26-Jun-15 17:00 | ALTALINK | Outage | 648L (63s Red Deer - 580s Sylvan Lake) | RATD - create open points at both ends to facilitate 648 rebuild | 86.4 Days
Continuous |
|
05-Apr-15 07:00 | 01-May-15 17:00 | ENMAX, AESO | Outage | 2.82L (ENMAX 2 - ENMAX 5),ENMAX 5 B138-2.82 (ENMAX 5) | transfer and dead end 2.82L to pothead structure | 26.42 Days
Continuous |
|
07-Apr-15 07:00 | 11-May-15 17:30 | ATCO | Outage | EX1-01 (879s Scotford Upgrader - 402s Scotford Expansion),879s T1 (879s Scotford Upgrader) | install new 701TD and 701T | 34.44 Days
Continuous |
|
07-Apr-15 08:00 | 30-Apr-15 18:00 | ALTALINK | Outage | 172L (370s North Lethbridge - 172L1236) | line rebuild | 23.42 Days
Continuous |
|
09-Apr-15 08:00 | 30-Apr-15 16:00 | ATCO | Outage | 7L183 (856s Kinosis - 2060s Engstrom) | protection testing | 21.33 Days
Continuous |
|
09-Apr-15 08:00 | 27-Apr-15 17:00 | ALTALINK | Outage | 3L (272s Springbank - 3L147) | rebuild line - structure 148 - 229 | 18.38 Days
Continuous |
|
11-Apr-15 07:00 | 22-Apr-15 19:30 | ATCO | RB | 7L104 (856s Kinosis - 989s Quigley) | to set structures | 11.52 Days
Continuous |
|
12-Apr-15 07:30 | 25-Apr-15 18:00 | ALTALINK | Outage | 1201L (520s Bennett - BCH Cranbrook) | move 1114L protections to new 102s7452 | 13.44 Days
Continuous |
AB-BC |
12-Apr-15 07:30 | 25-Apr-15 18:00 | ALTALINK | Outage | 520s T1 (520s Bennett) | connect 1114L protection to new 102s7452 | 13.44 Days
Continuous |
|
12-Apr-15 07:30 | 25-Apr-15 18:00 | MONTANA | Outage | MATL (120s Picture Butte - Montana) | line repair | 13.44 Days
Continuous |
AB-MATL |
12-Apr-15 08:00 | 25-Apr-15 17:00 | ALTALINK | TE | 102s Langdon RTU/SCADA | update RTU and HMI configurations | 13.38 Days
Daily |
|
12-Apr-15 10:00 | 22-Apr-15 17:00 | ALTALINK | Outage | 63s T2 (63s Red Deer) | bushing replacement & oil reclamation | 10.29 Days
Continuous |
|
13-Apr-15 08:00 | 22-Apr-15 17:00 | ALTALINK | Outage | 63s Red Deer 138 kV South Bus,80L (63s Red Deer - 214s Innisfail),755L (63s Red Deer - 247s Piper Creek),648L (63s Red Deer - 580s Sylvan Lake) | 138kV south bus outage to add new 63sT4 and switchgear | 9.38 Days
Continuous |
|
14-Apr-15 08:00 | 18-Apr-15 17:00 | ENMAX | Outage | ENMAX 65 240kV South Bus | NFTP: string 1106L and 1107L slack span into ENMAX 65SS | 4.38 Days
Continuous |
|
14-Apr-15 16:30 | 20-Apr-15 17:00 | ALTALINK | Outage | 936L (102s Langdon - 5s East Calgary) | L to J: removal of existing SS tower in close proximity to 936L | 6.02 Days
Continuous |
AB-BC |
15-Apr-15 08:00 | 20-Apr-15 12:00 | ALTALINK | TE | 648S Metiskow | bus protection replacement - 138kV bus protection outage | 5.17 Days
Continuous |
|
15-Apr-15 11:01 | 20-Apr-15 14:00 | ALTALINK | Outage | 703L (648s Metiskow - 703L),648s T1 (648s Metiskow),648s T3 (648s Metiskow),648s 749E (648s Metiskow),954L (648s Metiskow - 650s Hansman Lake) | replace bus protection | 5.12 Days
Continuous |
|
15-Apr-15 17:00 | 22-Apr-15 16:00 | ATCO | Outage | 845s 702 (845s Big Mountain) | forced outage | 6.96 Days
Continuous |
|
16-Apr-15 08:00 | 24-Apr-15 08:00 | ALTALINK | Outage | 286s T2 (286s Yasa) | customer request for T2 outage | 8 Days
Continuous |
|
16-Apr-15 08:00 | 23-Apr-15 16:00 | ALTALINK | RB | 172L (370s North Lethbridge - 172L1236),172L (15s Fort Macleod - 172L1251) | work near structure 1249 | 7.33 Days
Continuous |
|
18-Apr-15 00:00 | 18-Apr-15 07:00 | ENMAX | Outage | 9.80L (ENMAX 31 - ENMAX 9) | high load move | 7 Hours
Continuous |
|
18-Apr-15 07:00 | 19-Apr-15 18:00 | ALTALINK | Outage | 898L (37s North Calder - 92s Viscount),747L (99s North St. Albert - 747DL4) | line maintenance | 1.46 Days
Daily |
|
18-Apr-15 07:00 | 18-Apr-15 18:00 | EPCOR | Outage | 113S Inland-Cement | aerial maintenance - customer work | 11 Hours
Continuous |
|
18-Apr-15 07:30 | 18-Apr-15 16:00 | ALTALINK | Outage | 918L (17s Benalto - 162s Beddington) | switch maintenance on SW 134 & 135, 62MD240-918L, spring substation washing | 8.5 Hours
Continuous |
AB-BC |
18-Apr-15 08:00 | 18-Apr-15 12:00 | ENMAX, ALTALINK | Outage | 28.2TR (ENMAX 28),28.80L (42s Sarcee - ENMAX 28) | spring substation washing | 4 Hours
Continuous |
|
18-Apr-15 08:00 | 19-Apr-15 16:00 | ENMAX | TE | ENMAX 12 | replace 50VDC battery charger | 1.33 Days
Continuous |
|
18-Apr-15 09:00 | 18-Apr-15 21:00 | EPCOR | Outage | Garneau T3 (Garneau) | swichgear maintenance | 12 Hours
Continuous |
|
18-Apr-15 12:01 | 18-Apr-15 16:00 | ENMAX | Outage | 28.1TR (ENMAX 28),1.80L (ENMAX 28 - ENMAX 1) | spring substation washing | 3.98 Hours
Continuous |
|
19-Apr-15 08:00 | 19-Apr-15 12:00 | ENMAX | Outage | 31.2TR (ENMAX 31),31.3TR (ENMAX 31),31.84L (ENMAX 31 - ENMAX 32),24.81L (ENMAX 31 - ENMAX 24) | spring substation washing | 4 Hours
Continuous |
|
19-Apr-15 08:00 | 19-Apr-15 12:00 | ALTALINK | Outage | 62s11 (62s Brazeau) | brush gear work | 4 Hours
Daily |
|
19-Apr-15 08:30 | 19-Apr-15 15:00 | ALTALINK | Outage | 87s 2352 (87s Gaetz) | emergency repair | 6.5 Hours
Continuous |
|
19-Apr-15 12:00 | 19-Apr-15 16:00 | ENMAX | Outage | 31.1TR (ENMAX 31),31.2TR (ENMAX 31),31.1C (ENMAX 31),9.80L (ENMAX 31 - ENMAX 9) | spring substation washing | 4 Hours
Continuous |
AB-BC |
19-Apr-15 12:00 | 19-Apr-15 16:00 | ALTALINK | Outage | 62s12 (62s Brazeau) | brush gear work | 4 Hours
Continuous |
|
19-Apr-15 14:00 | 19-Apr-15 16:00 | ALTALINK | Outage | 801L (62s Brazeau - 294s Brazeau Outlet Works) | remove mobile from 801L | 2 Hours
Continuous |
|
20-Apr-15 07:00 | 30-May-15 18:00 | EPCOR | Outage | 814s T1 (814s Bellamy) | bushing replacement | 40.46 Days
Continuous |
|
20-Apr-15 07:00 | 27-Apr-15 18:00 | EPCOR | Outage | 814s T1 (814s Bellamy),814s B2401 (814s Bellamy),Rossdale BR721 (Rossdale),814s B2407 (814s Bellamy) | breaker fail upgrade | 7.46 Days
Continuous |
|
20-Apr-15 07:00 | 30-Apr-15 17:00 | ALTALINK | Outage | 44S Bearspaw Plant,44s T1 (44s Bearspaw Plant) | install T1 prot, install new feeder prot module | 10.42 Days
Continuous |
|
20-Apr-15 07:00 | 24-Apr-15 19:00 | ATCO | RB | 9L84 (934s Black Fly - 977s Salt Creek) | repair overhead shield wire sleeves. | 4.5 Days
Daily |
|
20-Apr-15 07:00 | 21-Apr-15 20:00 | SUNCOR | Outage | 29PL9-5 (29EDD-1 Millennium - 29EDD-34) | address phase A ground fault issue | 1.54 Days
Continuous |
|
20-Apr-15 07:00 | 24-Apr-15 18:00 | EPCOR | Outage | Namao N724 (Namao),72CN10 (987s Clover Bar - Namao) | bushing replacement | 4.46 Days
Continuous |
|
20-Apr-15 08:00 | 24-Apr-15 16:00 | ENMAX | TE | ENMAX 16 RTU/SCADA | RTU replacement | 4.33 Days
Continuous |
|
20-Apr-15 08:00 | 21-Apr-15 16:00 | ENMAX | Outage | 14.83L (ENMAX 14 - ENMAX 36),ENMAX 14 B138-14.83 (ENMAX 14) | breaker Inspection | 1.33 Days
Continuous |
|
20-Apr-15 08:00 | 20-Apr-15 12:00 | ALTALINK | TE | 749L (899s Edgerton - 749L118AN) | remove line protection from service, restore and test settings | 4 Hours
Daily |
|
20-Apr-15 08:00 | 20-Apr-15 12:00 | ALTALINK | TE | 715L (648s Metiskow - 650s Hansman Lake) | 650s 715AL 'A' protection outage | 4 Hours
Daily |
|
20-Apr-15 08:00 | 04-May-15 16:00 | ENMAX | Outage | ENMAX 20,1.81L (ENMAX 20 - ENMAX 1) | line differential | 14.33 Days
Continuous |
|
20-Apr-15 08:00 | 26-Apr-15 16:00 | ENMAX | TE | 20.82L (ENMAX 21 - ENMAX 20) | line differential | 6.33 Days
Daily |
|
20-Apr-15 08:00 | 01-May-15 16:00 | ENMAX | TE | ENMAX 2 | battery checks | 11.33 Days
Continuous |
|
20-Apr-15 08:00 | 21-Apr-15 16:00 | ENMAX | Outage | 20.1TR (ENMAX 20) | hot spot on switch 82 at ENMAX 20 | 1.33 Days
Continuous |
|
20-Apr-15 08:00 | 24-Apr-15 16:00 | ENMAX | Outage | 40.1TR (ENMAX 40) | doble and LV cable test | 4.33 Days
Continuous |
|
20-Apr-15 08:00 | 24-Apr-15 16:00 | ENMAX | Outage | 34.1TR (ENMAX 34) | oil leak containment | 4.33 Days
Continuous |
|
20-Apr-15 08:30 | 20-Apr-15 17:00 | ATCO | Outage | 836s 630 (836s Steepbank),836s 626T (836s Steep Bank) | relay testing | 8.5 Hours
Continuous |
|
20-Apr-15 09:00 | 01-May-15 17:00 | BCH | Outage | 5L75 (Revelstoke - Ashton Creek) | REV SA and CVT replacement | 11.33 Days
Continuous |
AB-BC |
20-Apr-15 09:00 | 20-Apr-15 16:30 | ATCO, IMPERIALOIL | TE | 7L105 (837s Mahihkan - 909s Mahno) | relay work | 7.5 Hours
Continuous |
|
20-Apr-15 10:00 | 20-Apr-15 17:00 | ALTALINK | Outage | 19s203 (19s Wabamun),896L (19s Wabamun - 432s Carvel) | Switch repair | 7 Hours
Daily |
|
20-Apr-15 10:00 | 23-Apr-15 17:00 | ALTALINK, ATCO | Outage | 69s 138kV Bus & T5 - Advice,69s North Barrhead 138kV Bus,7L230 (69s North Barrhead - 7L230 tap),723L (69s North Barrhead - 723L133) | Replace 69s17 138kV PT | 3.29 Days
Continuous |
|
20-Apr-15 10:00 | 23-Apr-15 17:00 | ALTALINK | Outage | 729L (285s East Camrose - 542s Ervick) | line maintenance | 3.29 Days
Continuous |
|
20-Apr-15 10:00 | 20-Apr-15 17:00 | ALTALINK | RB | 603L (243s Soderglen Wind Farm - 59s Peigan) | Fortis work | 7 Hours
Daily |
|
20-Apr-15 12:00 | 24-Apr-15 17:00 | ALTALINK | Outage | 421s T2 (421s Hays) | oil leak repair | 4.21 Days
Continuous |
|
20-Apr-15 12:01 | 20-Apr-15 16:00 | ALTALINK | TE | 715L (648s Metiskow - 650s Hansman Lake) | 'B' protection outage - relay | 3.98 Hours
Daily |
|
20-Apr-15 12:01 | 20-Apr-15 16:00 | ALTALINK | TE | 749L (899s Edgerton - 749L118AN) | 'B' protection outage | 3.98 Hours
Daily |
|
20-Apr-15 13:00 | 20-Apr-15 17:00 | ALTALINK | TE | 69s North Barrhead RTU/SCADA | update RTU configuration | 4 Hours
Daily |
|
20-Apr-15 14:00 | 20-Apr-15 16:00 | ALTALINK | Outage | 885L (648s Metiskow - 650s Hansman Lake) | remove mobile from 885L | 2 Hours
Daily |
|
20-Apr-15 17:00 | 25-May-15 08:00 | ALTALINK | IO | 1107L (ENMAX 65 - 237s Foothills),1106L (ENMAX 65 - 237s Foothills) | NFTP: for future 237s Foothills energization | 34.63 Days
Continuous |
|
20-Apr-15 17:30 | 25-Apr-15 17:00 | ALTALINK | Outage | 937L (102s Langdon - 74s Janet) | L to J: Remove 937L from temporary attachment on 1064L onto new Str# 49. String new 937L into final orientation @ 102s. | 4.98 Days
Continuous |
AB-BC |
21-Apr-15 07:30 | 22-Apr-15 18:00 | ALTALINK | Outage | 164L (103s Goose Lake - 415s Drywood) | line repair from rebuild - broken anchor | 1.44 Days
Continuous |
|
21-Apr-15 08:00 | 23-Apr-15 16:00 | ALTALINK | Outage | 938L (77s Sagitawah - 809s Louise Creek) | SCADA upgrade project | 2.33 Days
Continuous |
|
21-Apr-15 08:00 | 22-Apr-15 12:00 | ALTALINK | Outage | 74s 56 (74s Janet),74s C1 (74s Janet) | warranty work | 28 Hours
Continuous |
AB-BC |
21-Apr-15 08:00 | 23-Apr-15 16:00 | ALTALINK | Outage | 118s 754E (118s Canmore),754L (118s Canmore - 437s Baymag) | replace breaker CT modify str | 2.33 Days
Continuous |
|
21-Apr-15 08:00 | 21-Apr-15 16:00 | ALTALINK | TE | 158s Vauxhall RTU/SCADA | splitting T1 alarms | 8 Hours
Daily |
|
21-Apr-15 08:00 | 23-Apr-15 16:00 | ATCO | IO | 9L938 (77s Sagitawah - 809s Louise Creek) | Altalink request - SCADA upgrade project | 2.33 Days
Continuous |
|
21-Apr-15 08:00 | 21-Apr-15 23:59 | TRANSCANADAP | Outage | 910s 701T (910s Excel) | bird proofing instatllation | 15.98 Hours
Continuous |
|
21-Apr-15 08:00 | 22-Apr-15 16:00 | ALTALINK | Outage | 170s 1452 (170s Pike) | install heaters on breaker 1452 pole tanks | 1.33 Days
Continuous |
|
21-Apr-15 08:00 | 21-Apr-15 16:00 | ENMAX | TE | ENMAX 6 | 50V DC battery bank load test | 8 Hours
Continuous |
|
21-Apr-15 08:00 | 21-Apr-15 16:00 | ENMAX | TE | ENMAX 6 | 130V DC battery bank load test | 8 Hours
Continuous |
|
21-Apr-15 08:30 | 21-Apr-15 17:00 | ALTALINK | Outage | 325s T1 (325s Leduc) | repair leaks on T1 | 8.5 Hours
Daily |
|
21-Apr-15 08:30 | 21-Apr-15 16:00 | ATCO | TE | 6L99 (727s Kinuso - 745s Slave Lake) | relay testing one at a time | 7.5 Hours
Continuous |
|
21-Apr-15 09:00 | 24-Apr-15 09:00 | ALTALINK | Outage | 310P Sundance | repairs to 310p | 3 Days
Continuous |
|
21-Apr-15 09:00 | 21-Apr-15 09:30 | ALTALINK | TE | 118S Canmore | breaker CT replacement & bus differential protection | 30 Mins
Daily |
|
21-Apr-15 10:00 | 21-Apr-15 14:00 | ALPAC | TE | 282s Grassland (Alpac) RTU/SCADA | urgent replacement of MPLS shelf to correct 282s tripping issues | 4 Hours
Daily |
|
21-Apr-15 10:00 | 21-Apr-15 14:00 | ALTALINK, FORTIS, ALPAC | TE | 405s Waupisoo RTU/SCADA,282s Grassland (Alpac) RTU/SCADA,353s Plamondon RTU/SCADA,140s Thompson RTU/SCADA,242s Flat Lake RTU/SCADA,157s Lac La Biche RTU/SCADA | upgrade router firmware - supervisory outage | 4 Hours
Daily |
|
21-Apr-15 12:00 | 23-Apr-15 16:00 | ALTALINK | TE | 77s Sagitawah RTU/SCADA | SCADA upgrade project | 2.17 Days
Daily |
|
22-Apr-15 06:30 | 02-Jun-15 06:30 | ALBIAN | Outage | 919s 908 (919s Hartley) |
maintenance |
41 Days
Continuous |
|
22-Apr-15 08:00 | 22-Apr-15 16:00 | ATCO | TE | 6L57 (735s Swan River - 727s Kinuso) | test 21 and 67N relays, and 79 recloser on 6L57 | 8 Hours
Continuous |
|
22-Apr-15 08:00 | 02-Jun-15 16:00 | ENMAX | Outage | 2.1TR (ENMAX 2) | energization of this new transformer | 41.33 Days
Continuous |
|
22-Apr-15 08:00 | 23-Apr-15 16:00 | ENMAX | TE | ENMAX 7 | relay maintenance | 1.33 Days
Continuous |
|
22-Apr-15 08:00 | 22-Apr-15 16:00 | ENMAX | TE | ENMAX 7 | battery bank load test | 8 Hours
Continuous |
|
22-Apr-15 08:00 | 08-May-15 17:00 | ATCO | TE | 879s Scotford Upgrader RTU/SCADA | download RTU & update HMI program | 16.38 Days
Continuous |
|
22-Apr-15 08:00 | 22-Apr-15 16:00 | ALTALINK | Outage | 452S B.F. Goodrich Fort Saskatchewan | customer performing checks for future project | 8 Hours
Daily |
|
22-Apr-15 08:30 | 22-Apr-15 15:00 | ATCO | TE | 7L80 (740s H.R.Milner - 857s Kakwaridge) | change settings and test 7L80 21B & 7L80 21A relay | 6.5 Hours
Continuous |
|
22-Apr-15 09:00 | 24-Apr-15 15:00 | ATCO | TE | 789s Keg River RTU/SCADA | complete commissioning/changeover of station RTU | 2.25 Days
Continuous |
|
22-Apr-15 09:30 | 22-Apr-15 11:30 | ALTALINK | TE | 115s Mt.Allan RTU/SCADA,271s Shell Jumpingpound RTU/SCADA,212s Lacombe RTU/SCADA,180s Cope Creek RTU/SCADA,581s Amocoricinus RTU/SCADA,649s Chappice Lake RTU/SCADA,437s Baymag RTU/SCADA,43s Shell Canada Jumping Pound Jct RTU/SCADA,512s Hartell RTU/SCADA,1140s Temp RTU/SCADA | AECC satellite supervisory circuits move | 2 Hours
Daily |
|
22-Apr-15 09:30 | 22-Apr-15 17:30 | AESO | TE | 736L (38s East Edmonton - 293s Bernese) | re-test and repair fiber | 8 Hours
Daily |
|
22-Apr-15 12:00 | 23-Apr-15 18:00 | Syncrude | TE | D05 Syncrude RTU/SCADA | FFT project setting updates to D200 | 30 Hours
Continuous |
|
22-Apr-15 13:00 | 23-Apr-15 17:00 | ALTALINK | Outage | 74s C2 (74s Janet),74s 54 (74s Janet) | warranty work | 28 Hours
Continuous |
AB-BC |
23-Apr-15 07:00 | 14-Sep-15 17:00 | ALTALINK | Outage | 80L (194s South Red Deer - 63s Red Deer) | line rebuild, protection work & renaming as 426L | 144.42 Days
Continuous |
|
23-Apr-15 07:00 | 25-Apr-15 17:00 | ALTALINK | Outage | 80L (55s Olds - 152s Didsbury) | install foundation 417L for new Johnson poles | 2.42 Days
Continuous |
|
23-Apr-15 08:00 | 23-Apr-15 16:00 | ENMAX | TE | ENMAX 1 | 130 VDC, battery charger checks & impedance tests | 8 Hours
Continuous |
|
23-Apr-15 08:30 | 23-Apr-15 17:00 | ALTALINK | Outage | 997L (71s Lamoureux - 410s Josephburg),71s47 (71s Lamoureux) | Switch repair | 8.5 Hours
Daily |
|
23-Apr-15 08:30 | 23-Apr-15 17:00 | ALTALINK | RB | 921L (71s Lamoureux - 987s Clover Bar) | 71s47 71s Lamoureux maintenance | 8.5 Hours
Continuous |
|
23-Apr-15 08:30 | 23-Apr-15 13:00 | ALTALINK | Outage | 38s 3152 (38s East Edmonton),38s C2 (38s East Edmonton) | repair 52HS device | 4.5 Hours
Daily |
|
23-Apr-15 08:30 | 23-Apr-15 18:00 | ALTALINK | Outage | 162L (415s Drywood - 229s Glenwood) | line repair from rebuild - straighten structure | 9.5 Hours
Daily |
|
23-Apr-15 09:00 | 23-Apr-15 13:00 | ALTALINK | TE | 69s North Barrhead RTU/SCADA | update RTU configuration | 4 Hours
Daily |
|
23-Apr-15 09:00 | 23-Apr-15 17:00 | BENIGN | Outage | 383s Kettles Hill Windfarm RTU/SCADA | SCADA software relay upgrade | 8 Hours
Continuous |
|
23-Apr-15 11:00 | 23-Apr-15 12:00 | BLACKSPRING | TE | 485s Black Springs RTU/SCADA | transfer communication to new MPLS network | 60 Mins
Continuous |
|
23-Apr-15 13:00 | 23-Apr-15 13:15 | ALTALINK | TE | 118S Canmore | breaker CT replacement | 15 Mins
Daily |
|
23-Apr-15 13:00 | 23-Apr-15 17:00 | ALTALINK | Outage | 38s C1 (38s East Edmonton),38s 3052 (38s East Edmonton) | repair 52HS device | 4 Hours
Daily |
|
24-Apr-15 06:00 | 02-May-15 16:00 | ALTALINK | Outage | 310P Sundance | maintenance | 8.42 Days
Daily |
|
24-Apr-15 08:00 | 24-Apr-15 16:00 | ENMAX | Outage | 7.84L (ENMAX 36 - ENMAX 7) | spring sub washing | 8 Hours
Continuous |
|
24-Apr-15 08:00 | 29-Apr-15 17:00 | ALTALINK | IO | 1117L (898s Heart Lake - 167s Ipiatik Lake) | connect new 1117L to A-frame structure inside 898s | 5.38 Days
Continuous |
|
24-Apr-15 08:00 | 24-Apr-15 15:00 | ALTALINK | Outage | 729L (40s Wetaskiwin - 729L13A) | line maintenance | 7 Hours
Daily |
|
24-Apr-15 09:00 | 24-Apr-15 17:00 | ALTALINK | Outage | 432s 739 (432s Carvel),739L (432s Carvel - 739L214B) | replace gas density meter | 8 Hours
Daily |
|
24-Apr-15 16:00 | 14-Sep-15 17:00 | ALTALINK | Outage | 63s 80N (63s Red Deer),194s 80X (194s South Red Deer) | protection work | 143.04 Days
Continuous |
|
24-Apr-15 16:00 | 26-Jun-15 17:00 | ALTALINK | Outage | 648L (63s Red Deer - 580s Sylvan Lake),63s 648 (63s Red Deer) | protection work | 63.04 Days
Continuous |
This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein. © 2009 Alberta Electric System Operator. All rights reserved |