| From | To | Owner | Type | Element | Scheduled Activity | Date/Time Comments | Interconnection |
|---|---|---|---|---|---|---|---|
| 26-Jun-13 08:00 | 31-Dec-14 17:00 | ENBRIDGE | Outage | Hay Lake North Series Capacitor,Marias South Series Capacitor | Series capacitor banks were removed from service due to the Subsynchronous Control Interaction (SSCI) with connected wind farm. | 553.42 Days
Continuous |
AB-MATL |
| 31-Jul-13 11:00 | 30-Dec-14 18:00 | ATCO | Outage | 720s 501R (720s Wabasca) | Forced outage | 517.33 Days
Continuous |
|
| 01-May-14 08:00 | 19-Dec-14 16:00 | ENMAX | Outage | 47.2TR (ENMAX 47) | 47s major capital | 232.38 Days
Daily |
|
| 30-May-14 08:00 | 07-Nov-14 16:00 | ATCO | Outage | 840S McNeill Station,840s 901T (840s MCNEILLSTATION),840s 701T (840s MCNEILLSTATION) | upgrade McNeill HVDC controls | 161.38 Days
Continuous |
AB-SK |
| 03-Jun-14 11:15 | 31-Dec-14 16:00 | EPCOR | Outage | Rossdale C1 | forced outage | 211.24 Days
Continuous |
|
| 14-Jun-14 07:00 | 21-Nov-14 18:00 | ALTALINK | Outage | 1034L (244s Bowmanton - 324s Cassils),1035L (244s Bowmanton - 324s Cassils),1088L (324s Cassils - 2075s Newell) | EATL Interface: Line cut in and out | 160.5 Days
Continuous |
|
| 25-Jun-14 07:00 | 15-Nov-14 18:00 | EPCOR | Outage | 1055L (629s Argyll Transfer - 816s Petrolia),240BA2 (814s Bellamy - 629s Argyll Transfer Station) | reterminate and rebuild as required on the 240 Kv oil filled cable at 629s | 143.5 Days
Continuous |
|
| 21-Aug-14 13:00 | 01-Mar-15 17:00 | ALTALINK | Outage | 33s3 (33s Spray) | maintenance | 192.21 Days
Continuous |
|
| 15-Sep-14 08:00 | 21-Nov-14 17:00 | ALTALINK | Outage | 983L (251S Whitla - 244S Bowmanton),964L (251s Whitla - 244s Bowmanton) | step bolt replacement - deficiency from construction - SATR BW | 67.42 Days
Continuous |
|
| 22-Sep-14 14:00 | 31-Oct-14 10:00 | ATCO | Outage | 853s 702T (853s Ring Creek),853S 502VR | 853s 502VR regulator class tap changers and 25 kV regulation | 38.83 Days
Continuous |
|
| 28-Sep-14 08:00 | 10-Nov-14 16:00 | ENMAX | Outage | 8.4TR (ENMAX 8) | doble, transformer wash, facilities equipment inspection | 43.38 Days
Continuous |
|
| 29-Sep-14 08:00 | 22-Nov-14 17:30 | ALTALINK | Outage | 658L (649s Chappice Lake - 562s Cypress) | line rebuild str’s #189 to #243 | 54.44 Days
Continuous |
|
| 01-Oct-14 08:00 | 21-Nov-14 16:00 | ENMAX | Outage | 23.4TR (ENMAX 23),MD138_23_4TR (ENMAX 23) | transformer replacement | 51.38 Days
Continuous |
|
| 05-Oct-14 08:00 | 25-Nov-14 08:00 | CapitalPower | Outage | 615S Halkirk | DSTATCOM trasnfomer | 51.04 Days
Continuous |
|
| 06-Oct-14 13:00 | 17-Dec-14 09:00 | ATCO | Outage | 735s 602T (735s Swan River) | construction on new 25 kV bays and require equipment clearance near 602TD | 71.88 Days
Continuous |
|
| 11-Oct-14 08:00 | 05-Nov-14 18:00 | ALTALINK | IO | 1238L (510s Sunnybrook - 330p Genesee) | cutovers of new protection panel, perform final End to End Test for New 1238L and energize 1238L | 25.46 Days
Continuous |
|
| 14-Oct-14 07:00 | 17-Nov-14 18:00 | EPCOR | Outage | 72LH8 (Hardisty - 803s Lambton),Hardisty H726 (Hardisty Epcor) | beaker replacement | 34.5 Days
Continuous |
|
| 14-Oct-14 08:00 | 07-Nov-14 16:00 | ENMAX, ALTALINK | TE | 1003L (74s Janet - ENMAX 25),1080L (ENMAX 65 - ENMAX 25),ENMAX 25 | Shepard RAS, Z43, Z44 &Z45: protection outages required to swap power supply on both A&B units, 1080L A&B: protection outages required to swap power supply on both A&B units | 24.38 Days
Daily |
|
| 14-Oct-14 08:00 | 07-Nov-14 16:00 | ENMAX, ALTALINK | TE | ENMAX 65,24.82L (ENMAX 65 - ENMAX 24),26.83L (ENMAX 65 - ENMAX 26),911L (59s Peigan - ENMAX 65) | protection outages required to swap power supply on both A&B units | 24.38 Days
Continuous |
|
| 17-Oct-14 08:00 | 21-Nov-14 17:00 | ALTALINK | Outage | 225s T1 (225s Magrath),225L (67s Stirling - 225AL tap),225L (225s Magrath - 225AL tap),225L (385s Spring Coulee - 225s Magrath) | remove 225s 69kV wood bus structure and install new metal structure | 35.42 Days
Continuous |
|
| 18-Oct-14 07:00 | 07-Nov-14 18:00 | ALTALINK | RB | 944L (132s Ware Junction - 275s Jenner) | install temporary pole in proximity to line in preparation for tower addition/raise for river crossing | 20.5 Days
Daily |
|
| 18-Oct-14 08:00 | 14-Nov-14 17:00 | ALTALINK | RB | 925L (63s Red Deer - 74s Janet) | work on 929L in vicinity, required for safety | 27.42 Days
Daily |
|
| 18-Oct-14 08:00 | 14-Nov-14 17:00 | ALTALINK | RB | 901L (63s Red Deer - 74s Janet) | install rider poles, string 1325L, work on 929L in vicinity, remove rider poles - WATL | 27.42 Days
Daily |
|
| 20-Oct-14 07:00 | 09-Nov-14 18:00 | EPCOR | Outage | Garneau T1 (Garneau) | transformer oil recoditioning | 20.5 Days
Continuous |
|
| 20-Oct-14 08:00 | 28-Nov-14 18:00 | EPCOR | Outage | Rossdale C1,Rossdale C2 | protection upgrade | 39.46 Days
Continuous |
|
| 20-Oct-14 09:00 | 06-Nov-14 17:00 | BCH | Outage | 5L76 (Ashton Creek - Nicola) | replacing CVT - BC maintenance does not affect AB ATC | 17.38 Days
Continuous |
AB-BC |
| 20-Oct-14 13:00 | 09-Nov-14 16:00 | ATCO | IO | 735S Swan River | install mobile sub | 20.17 Days
Continuous |
|
| 20-Oct-14 13:00 | 16-Mar-15 16:00 | ATCO | Outage | 6L12 (775s Sullivan Lake - 6L25 tap),774S 701T | maintenance | 147.13 Days
Continuous |
|
| 21-Oct-14 07:30 | 07-Nov-14 18:00 | ALTALINK | RB | 944L (132s Ware Junction - 275s Jenner) | move 951L onto temp structures to facilitate tower raise, required for safety | 17.48 Days
Daily |
|
| 22-Oct-14 08:00 | 05-Nov-14 18:00 | ALTALINK, EPCOR | Outage, Trans Test/Comm | 330p 1202 (330p Genesee),330p 1201 (330p Genesee),1238L (510s Sunnybrook - 330p Genesee) | isolate the 1238 line node formally the 1209 line node | 14.46 Days
Continuous |
|
| 22-Oct-14 09:00 | 01-Nov-14 12:00 | ATCO | TE | 840S McNeill Station | 15 MW to 150 MW import/export tests | 10.13 Days
Daily |
|
| 23-Oct-14 07:00 | 05-Nov-14 18:00 | ALTALINK | RB | 1239L (510s Sunnybrook - 330p Genesee) | salvage old 1203L towers in vicinity | 13.5 Days
Daily |
|
| 23-Oct-14 08:00 | 05-Nov-14 15:00 | ALTALINK | Outage | 668L (394s Empress - 562s Cypress) | remove old 5/16’ O.H.S.W. and install new O.P.G.W. | 13.33 Days
Continuous |
|
| 26-Oct-14 07:30 | 03-Nov-14 17:00 | ALTALINK | RB | 967L (59s Peigan - 370s North Lethbridge) | replace step bolts | 8.44 Days
Daily |
|
| 27-Oct-14 06:30 | 07-Nov-14 17:00 | ALTALINK | Outage | 74s C2 (74s Janet),74s 54 (74s Janet) | cap bank replacement, 74s53 (C2) advice | 11.48 Days
Continuous |
AB-BC |
| 27-Oct-14 07:00 | 01-Nov-14 18:00 | EPCOR | Outage | 987s T4 (987s Clover Bar),987sC2408 (987s Clover Bar) | retrofit of the Alstom breaker C2408 | 5.46 Days
Continuous |
|
| 27-Oct-14 07:00 | 01-Nov-14 18:00 | EPCOR | TE | 987s T4 (987s Clover Bar) | retrofit of the Alstom breaker C2408 | 5.46 Days
Continuous |
|
| 27-Oct-14 07:00 | 01-Nov-14 18:00 | EPCOR | TE | 987S Clover Bar 240 kV Bus 2 | retrofit of the Alstom breaker C2408 | 5.46 Days
Continuous |
|
| 27-Oct-14 07:00 | 01-Nov-14 18:00 | EPCOR | TE | 987s T2 (987s Clover Bar) | retrofit of the Alstom breaker C2408 | 5.46 Days
Continuous |
|
| 27-Oct-14 07:00 | 01-Nov-14 18:00 | EPCOR | TE | 987sC2408 (987s Clover Bar) | retrofit of the Alstom breaker C2408 | 5.46 Days
Continuous |
|
| 27-Oct-14 07:00 | 27-Nov-14 18:00 | EPCOR | Outage | Garneau T1 (Garneau) | oil reconditioning | 31.5 Days
Continuous |
|
| 27-Oct-14 07:30 | 31-Oct-14 17:00 | ALTALINK | Outage | 929L (63s Red Deer - 74s Janet) | complete line reconfiguration for 1325L crossing | 4.4 Days
Continuous |
AB-BC |
| 27-Oct-14 07:30 | 31-Oct-14 17:30 | ALTALINK | RB | 955L (59s Peigan - 103s Goose Lake) | install bird diverters on OHSW | 4.42 Days
Daily |
|
| 27-Oct-14 07:30 | 31-Oct-14 17:30 | ALTALINK | RB | 956L (103s Goose Lake - 59s Peigan) | install bird diverters on OHSW | 4.42 Days
Daily |
|
| 27-Oct-14 07:30 | 11-Nov-14 18:00 | ALTALINK | RB | 1206L (89s Ellerslie - 12s Heartland) | replace shackle bolts on 1212L | 15.48 Days
Daily |
|
| 27-Oct-14 08:00 | 14-Nov-14 16:00 | ENMAX | Outage | 3.82L (ENMAX 3 - ENMAX 8) | derating mitigation, line differential, sheath test, cathodic check, heater repair 3s, breaker inspection (3s) | 18.38 Days
Continuous |
|
| 27-Oct-14 08:00 | 31-Oct-14 17:00 | ALTALINK | Outage | 753L (65s High River - 253s Blackie) | replace CT at breaker 65s753E | 4.38 Days
Continuous |
|
| 27-Oct-14 08:00 | 31-Oct-14 17:00 | ATCO | TE | ATCO's system operations centre | Patching and replacement of some SOC servers | 4.38 Days
Continuous |
|
| 27-Oct-14 08:00 | 11-Nov-14 17:00 | ALTALINK | Outage | 1212L (89s Ellerslie - 12s Heartland) | replace shackle bolts | 15.42 Days
Continuous |
|
| 27-Oct-14 08:30 | 14-Nov-14 15:00 | ALTALINK | Outage | 310p 1152 (310p Sundance) | replace CTs and breaker fail protection | 18.31 Days
Continuous |
|
| 27-Oct-14 09:00 | 31-Oct-14 15:00 | ALTALINK | Outage | 744L (235s Entwistle - 744L88C) | line maintenance. | 4.25 Days
Continuous |
|
| 27-Oct-14 09:30 | 07-Nov-14 16:00 | ATCO | TE | 801S Station General Equipment | changing passwords for multiple protection relays and comm processors as per the CIP security standards | 11.31 Days
Continuous |
|
| 27-Oct-14 12:00 | 06-Nov-14 17:00 | ALTALINK | Outage | 63s T1 (63s Red Deer) | bushing replacement & oil leaks | 10.25 Days
Continuous |
|
| 28-Oct-14 07:00 | 02-Nov-14 18:00 | ATCO | RB | 9L933 (132s Ware Junction - 801s Anderson) | 9L933 - stringing EATL over 9L933 | 5.5 Days
Daily |
|
| 28-Oct-14 07:00 | 02-Nov-14 18:00 | ATCO | RB | 9L934 (132s Ware Junction - 801s Anderson) | 9L934 - stringing EATL over 9L933 | 5.5 Days
Daily |
|
| 28-Oct-14 07:00 | 31-Oct-14 18:00 | ALTALINK | IO, RB | 1077L (74s Janet - 5s Eastcalgary),765L (74s Janet - 151s Strathmore),917L (74s Janet - 5s East Calgary) | ECTP: install 1077L conductors and to 6 pole U/G riser on 936L bypass. Line de-energized | 3.46 Days
Continuous |
|
| 28-Oct-14 07:00 | 02-Nov-14 18:00 | ALTALINK | RB | 933L (132s Ware Junction - 801s Anderson) | EATL interface: String new line 13L50 over top 933L/934L line | 5.5 Days
Daily |
|
| 28-Oct-14 07:00 | 02-Nov-14 17:00 | ALTALINK | RB | 934L (132s Ware Junction - 801s Anderson) | EATL interface: string new line 13L50 over top 933L/934L line | 5.46 Days
Daily |
|
| 28-Oct-14 08:00 | 31-Oct-14 18:00 | EPCOR | Outage | RossdaleT4 (Rossdale) | replace PT | 3.42 Days
Daily |
|
| 28-Oct-14 08:00 | 26-Nov-14 08:00 | ALTALINK | Outage | 244S Bowmanton,1034L (244s Bowmanton - 324s Cassils),1035L (244s Bowmanton - 324s Cassils),983L (251S Whitla - 244S Bowmanton),964L (251s Whitla - 244s Bowmanton) | 240/138Kv bus & close In Open points A & B | 29.04 Days
Continuous |
|
| 28-Oct-14 08:00 | 31-Oct-14 16:00 | ALTALINK, ENMAX | Outage | 23.80L (74s Janet - ENMAX 23),765L (74s Janet - 151s Strathmore) | L to J: required for clearance to string new 1077L conductor | 3.33 Days
Continuous |
|
| 28-Oct-14 08:00 | 31-Oct-14 16:00 | ENMAX, ALTALINK | RB | 37.82L (74s Janet - ENMAX 37) | ECTP: hot line work to string 1077L conductors | 3.33 Days
Continuous |
|
| 28-Oct-14 08:00 | 31-Oct-14 17:30 | ALTALINK | RB | 616L (103s Goose Lake - 616AL tap),616L (59s Peigan - 616AL tap) | install bird divertors on OHSW | 3.4 Days
Daily |
|
| 28-Oct-14 08:00 | 31-Oct-14 17:30 | ALTALINK | RB | 164L (103s Goose Lake - 415s Drywood) | install bird divertors on OHSW | 3.4 Days
Daily |
|
| 28-Oct-14 08:00 | 31-Oct-14 17:30 | ALTALINK | RB | 1071L (103s Goose Lake - 312s Fidler) | install bird divertors on OHSW | 3.4 Days
Daily |
|
| 28-Oct-14 10:00 | 31-Oct-14 16:00 | ATCO | TE | 710S Vermilion | block of 144kV Bus Protection relay 700BS1 for re-termination of 7L14 into Kitscoty | 3.25 Days
Continuous |
|
| 29-Oct-14 08:30 | 31-Oct-14 16:00 | ATCO | TE | ATCO Radio Tower | Bitumount Tower - add points for Kearl | 2.31 Days
Continuous |
|
| 30-Oct-14 07:00 | 12-Nov-14 17:00 | ALTALINK | Outage | 792L (191s N.W. Cardiff - 92s Viscount) | line maintenance | 13.46 Days
Continuous |
|
| 30-Oct-14 07:00 | 03-Nov-14 17:30 | ATCO | RB | 9L930 (72s Leismer - 825s Whitefish Lake) | installing screw piles for new in/out configuration for Heart Lake | 4.48 Days
Daily |
|
| 30-Oct-14 07:00 | 31-Oct-14 17:00 | ENMAX | RB | 16.63L (ENMAX 16 - ENMAX 36) | tree trimming | 1.42 Days
Daily |
|
| 30-Oct-14 07:00 | 31-Oct-14 17:00 | ENMAX | RB | 2.83L (ENMAX 2 - 2.83L tap),2.83L (ENMAX 13 - 2.83L tap) | climbing inspection | 1.42 Days
Daily |
|
| 30-Oct-14 07:00 | 31-Oct-14 17:00 | ENMAX | RB | 2.82L (ENMAX 2 - ENMAX 5) | climbing inspection | 1.42 Days
Daily |
|
| 30-Oct-14 08:00 | 13-Nov-14 17:00 | ALTALINK | Outage | 33S Spray,113L (20s Ghost - 33s Spray),76L (115s Mt. Allan - 33s Spray),84L (35s Rundle - 33s Spray) | install new control building, expand fence, new access road, replace 33sPT1, replace insulators, new SS feed; install new line protection | 14.42 Days
Continuous |
|
| 30-Oct-14 08:00 | 01-Nov-14 18:00 | EPCOR | TE | 814s T2 (814s Bellamy) | block of A&B protection. settings change on each protection | 2.42 Days
Daily |
|
| 30-Oct-14 08:00 | 31-Oct-14 18:00 | ATCO | TE | 790s Poplar Hill RTU/SCADA | points addition | 1.42 Days
Continuous |
|
| 30-Oct-14 10:00 | 02-Nov-14 16:00 | ATCO | TE | 710S Vermilion,7L14 (710s Vermilion - 751s Hill) | 710s Vermilion CT ratio and relay setting changes for re-termination of 7L14 into Kitscoty. 144 kV bus protection relay setting changes. | 3.29 Days
Continuous |
|
| 31-Oct-14 07:00 | 31-Oct-14 18:00 | ALTALINK | Outage | 604L (149s Nisku - 155s Blackmud),149s 604 (149s Nisku) | required for transformer protection checks & insulator washing | 11 Hours
Daily |
|
| 31-Oct-14 07:00 | 01-Nov-14 18:00 | ALTALINK | RB | 956L (103s Goose Lake - 59s Peigan) | replace step bolts | 1.46 Days
Daily |
|
| 31-Oct-14 07:00 | 31-Oct-14 17:00 | ENMAX | RB | 30.81L (42s Sarcee - ENMAX 30) | tree trimming | 10 Hours
Daily |
|
| 31-Oct-14 07:30 | 01-Nov-14 18:00 | ALTALINK | Outage | 955L (59s Peigan - 103s Goose Lake) | replace step bolts | 1.44 Days
Continuous |
|
| 31-Oct-14 08:00 | 04-Nov-14 17:00 | ATCO | Outage | 7L14 (710s Vermilion - 751s Hill) | cut in lines to new Kitscoty 144 kV sub | 4.42 Days
Continuous |
|
| 31-Oct-14 08:00 | 31-Oct-14 16:00 | ENMAX | Outage | 2.81L (ENMAX 2 - ENMAX 9),9B138-2.81 (ENMAX 9) | SF6 gasket seal check & shroud modification, heater check | 8 Hours
Continuous |
|
| 31-Oct-14 08:00 | 01-Nov-14 17:00 | ATCO | TE | 710s Vermilion RTU/SCADA | telecontrol RTU work, download RTU & HMI & SEL programs | 1.38 Days
Continuous |
|
| 31-Oct-14 08:00 | 04-Nov-14 16:00 | ATCO | TE | 7L14 (710s Vermilion - 751s Hill) | relay settings change, CT ratio change. | 4.38 Days
Continuous |
|
| 31-Oct-14 08:00 | 30-Nov-14 15:00 | ATCO | IO | 7L130 (710s Vermilion - 705s Kitscoty) | sub construction | 30.33 Days
Continuous |
|
| 31-Oct-14 08:00 | 30-Nov-14 15:00 | ATCO | IO | 7L14 (705s Kitscoty - 751s Hill) | sub construction | 30.33 Days
Continuous |
|
| 31-Oct-14 08:00 | 21-Jun-15 16:00 | ATCO | Outage | 898s904A (898s Heart Lake),898s906B (898s Heart Lake),898s900PT3 (898s Heart Lake) | demolition of existing flex bus & structures, install new piles, structures & apparatus for switches | 233.33 Days
Continuous |
|
| 31-Oct-14 08:00 | 31-Oct-14 16:00 | ALTALINK | TE | MUX Radio | replace control module (emergency) | 8 Hours
Continuous |
|
| 31-Oct-14 08:00 | 31-Oct-14 16:00 | ALTALINK | Outage | 74s 2852 (74s Janet) | L to J: P&C work for future 1064L Bay. | 8 Hours
Continuous |
|
| 01-Nov-14 07:00 | 08-Nov-14 18:00 | ALTALINK | RB | 815L (13s Deerland - 127s Bruderheim) | EATL interchange: string 13L50 OPGW and conductors over 815L. | 7.5 Days
Daily |
|
| 01-Nov-14 07:00 | 14-Nov-14 18:00 | ALTALINK | RB | 929L (63s Red Deer - 74s Janet) | install rider poles, string 1325L, remove rider poles - WATL | 13.5 Days
Daily |
|
| 01-Nov-14 08:00 | 22-Dec-14 16:00 | ATCO, IMPERIALOIL | IO | 7L105 (837s Mahihkan - 909s Mahno) | comissioning | 51.38 Days
Continuous |
|
| 01-Nov-14 08:00 | 10-Nov-14 18:00 | ATCO | RB | 6L05 (843s Bigknife Creek - 757s Battle River) | EATL project work | 9.46 Days
Daily |
|
| 01-Nov-14 08:00 | 01-Nov-14 16:00 | ENMAX | Outage | 162s 138-RB83 (162s Beddington) | breaker maintenance & SF6 gas sample 162B138-RB83 | 8 Hours
Continuous |
|
| 01-Nov-14 08:00 | 01-Nov-14 12:00 | ENMAX | Outage | 5.2TR (ENMAX 5),5.5TR (ENMAX 5),5.7TR (ENMAX 5),1.84L (ENMAX 1 - ENMAX 5),2.82L (ENMAX 2 - ENMAX 5) | substation washing off peak | 4 Hours
Continuous |
|
| 01-Nov-14 08:00 | 01-Nov-14 16:00 | ENMAX | Outage | 24.81L (ENMAX 31 - ENMAX 24) | doble 65PT138-24.82C & 65LA138-24.82L-C | 8 Hours
Continuous |
|
| 01-Nov-14 08:00 | 09-Nov-14 16:00 | ATCO | TE | 735s Swan River RTU/SCADA | testing | 8.38 Days
Continuous |
|
| 01-Nov-14 12:00 | 01-Nov-14 16:00 | ENMAX | Outage | 2.1TR (ENMAX 2),2.3TR (ENMAX 2),2.83L (ENMAX 2 - 2.83L tap) | substation washing off peak | 4 Hours
Continuous |
|
| 01-Nov-14 12:00 | 01-Nov-14 12:15 | ALTALINK | IO | AltaLink Satellite Phone | SOC monthly satellite phone testing | 15 Mins
Continuous |
|
| 01-Nov-14 12:00 | 01-Nov-14 16:00 | ENMAX | Outage | 2.83L (ENMAX 2 - 2.83L tap) | ENMAX: wash Enmax 2.83L portion 2 sub bus | 4 Hours
Daily |
|
| 02-Nov-14 07:30 | 03-Nov-14 17:30 | ALTALINK | Outage | 968L (59s Peigan - 370s North Lethbridge) | replace step bolts, will not start until 955L is returned | 1.42 Days
Continuous |
|
| 02-Nov-14 08:00 | 15-Nov-14 16:00 | ENMAX | Outage | 8.1TR (ENMAX 8) | doble, transformer wash, fire alarm modification | 13.33 Days
Continuous |
|
| 02-Nov-14 08:00 | 02-Nov-14 12:00 | ENMAX | Outage | 26.2TR (ENMAX 26),26.83L (ENMAX 65 - ENMAX 26),26B138-26BT3 (ENMAX 26),26PT138-26.83 (ENMAX 26) | substation washing,coble 65LA138-26.83L-C | 4 Hours
Continuous |
|
| 02-Nov-14 11:30 | 02-Nov-14 16:00 | ALTALINK, ENMAX | Outage | 918L (17s Benalto - 162s Beddington),162s 240_132 (162s Beddington),162s 240_133 (162s Beddington),17s918X (17s Benalto) | substation washing, SCADA function checks | 4.5 Hours
Continuous |
AB-BC |
| 03-Nov-14 07:00 | 06-Nov-14 17:00 | ALTALINK | Outage | 107s T1 (107s Westfield),722L (368s Burdett - 107s Westfield) | replace 25kV bus PTs, change CT ratios | 3.42 Days
Daily |
|
| 03-Nov-14 07:00 | 03-Nov-14 17:00 | ALTALINK | Outage | 149s C1 (149s Nisku),149s 3 (149s Nisku) | transformer prot checks | 10 Hours
Daily |
|
| 03-Nov-14 07:00 | 03-Nov-14 16:00 | ALTALINK | Outage | 746s T1 (746s Sherwood Park) | add CT's to new differential protection | 9 Hours
Daily |
|
| 03-Nov-14 07:00 | 03-Nov-14 17:00 | ENMAX | RB | 2.82L (ENMAX 2 - ENMAX 5) | climbing inspection | 10 Hours
Daily |
|
| 03-Nov-14 07:00 | 05-Nov-14 17:00 | ENMAX | RB | 30.81L (42s Sarcee - ENMAX 30) | tree trimming | 2.42 Days
Continuous |
|
| 03-Nov-14 07:00 | 28-Nov-14 18:00 | EPCOR | Outage | 987s CGB3 (987s Clover Bar) | maintenance | 25.46 Days
Continuous |
|
| 03-Nov-14 07:00 | 17-Nov-14 19:00 | ALTALINK | Outage | 727L (65s High River - 727L39S) | SFTP: install 7 caisson foundations under portion of 727L. | 14.5 Days
Continuous |
|
| 03-Nov-14 07:00 | 14-Nov-14 17:30 | ALTALINK | Outage | 397s T1 (397s Benbow) | Install 397s39 Breaker, install 397s27 MOD, upgrade 2045L and 220L feeder cables, upgrade SST1 | 11.44 Days
Continuous |
|
| 03-Nov-14 07:00 | 13-Nov-14 17:00 | ALTALINK | IO | MUX Radio | 9286R radio microwave link update | 10.42 Days
Daily |
|
| 03-Nov-14 07:00 | 04-Nov-14 17:00 | ALTALINK | Outage | 150L (42s Sarcee - 150L47),42s 150W (42s Sarcee) | replace CVT | 1.42 Days
Continuous |
|
| 03-Nov-14 07:00 | 13-Nov-14 17:30 | ALTALINK | Outage | 720L (347s Fox Creek - 397s Benbow) | install new equipments | 10.44 Days
Continuous |
|
| 03-Nov-14 07:30 | 04-Nov-14 16:00 | ALTALINK | Outage | 102s 6652 (102s Langdon) | CT SF6 leak repair | 1.35 Days
Continuous |
|
| 03-Nov-14 08:00 | 07-Nov-14 16:00 | ENMAX | Outage | 16.61L (ENMAX 16 - ENMAX 27) | switch replacement | 4.33 Days
Continuous |
|
| 03-Nov-14 08:00 | 07-Nov-14 17:00 | ALTALINK | Outage | 154s Black Spruce 240 kV Bus 2 | add SS VT and connect to 240kV bus 2 | 4.38 Days
Continuous |
|
| 03-Nov-14 08:00 | 05-Nov-14 07:59 | ALTALINK | Outage | 434s T3 (434s East Stony Plain),739L (305s Acheson - 434s Stony Plain),434s 739E (434s Stony Plain) | CT contributions and trip Test s739E | 2 Days
Continuous |
|
| 03-Nov-14 08:00 | 03-Nov-14 16:00 | ALTALINK | TE | 434s East Stony Plain RTU/SCADA | update RTU with new configuration | 8 Hours
Daily |
|
| 03-Nov-14 08:00 | 07-Nov-14 18:00 | EPCOR | Outage | 511s VictoriaT3 (511s Victoria) | replace pressure relief device | 4.42 Days
Continuous |
|
| 03-Nov-14 08:00 | 03-Nov-14 16:00 | ATCO | TE | 848s Ruth Lake RTU/SCADA | CIP password changes | 8 Hours
Continuous |
|
| 03-Nov-14 08:00 | 06-Nov-14 16:00 | ATCO | TE | 848s Ruth Lake RTU/SCADA | SEL password change and port configuration | 3.33 Days
Daily |
|
| 03-Nov-14 08:00 | 07-Nov-14 17:30 | ALTALINK | RB | 994L (103s Goose Lake - 312s Fidler) | install bird divertors on OHSW | 4.4 Days
Daily |
|
| 03-Nov-14 08:00 | 07-Nov-14 17:30 | ALTALINK | RB | 1071L (205s Castle Rock Ridge - 312s Fidler) | install bird divertors on OHSW | 4.4 Days
Daily |
|
| 03-Nov-14 08:00 | 07-Nov-14 17:30 | ALTALINK | RB | 1072L (103s Goose Lake - 205s Castle Rock Ridge) | install bird divertors on OHSW | 4.4 Days
Daily |
|
| 03-Nov-14 08:00 | 03-Nov-14 17:00 | ALTALINK | Outage | 731L (38s East Edmonton - 420s Broadmoor) | install corona rings | 9 Hours
Daily |
|
| 03-Nov-14 08:00 | 05-Nov-14 16:00 | ENMAX | Outage | 25B240-D136 (ENMAX 25) | doble work | 2.33 Days
Continuous |
|
| 03-Nov-14 08:00 | 03-Nov-14 16:00 | ENMAX | Outage | 32.82L (ENMAX 54 - ENMAX 32),54B138-32.82 (ENMAX 54) | heater repair, doble 54LA138-32.82C | 8 Hours
Continuous |
|
| 03-Nov-14 08:00 | 07-Nov-14 16:00 | ENMAX | TE | ENMAX 28 | relay maintenance | 4.33 Days
Daily |
|
| 03-Nov-14 08:00 | 04-Nov-14 16:00 | ATCO | TE | 735S Swan River,735s 601T (735s Swan River) | protection setting change | 1.33 Days
Continuous |
|
| 03-Nov-14 08:00 | 06-Nov-14 16:00 | ATCO | RB | 7L48 (882s Triangle - 794s Valleyview) | pole straighten | 3.33 Days
Continuous |
|
| 03-Nov-14 08:00 | 06-Nov-14 18:00 | EPCOR | TE | 814s T1 (814s Bellamy) | protection settings change | 3.42 Days
Continuous |
|
| 03-Nov-14 08:00 | 06-Nov-14 17:00 | ALTALINK | TE | 320P Keephills RTU/SCADA | RTU upgrade | 3.38 Days
Daily |
|
| 03-Nov-14 09:00 | 05-Nov-14 19:00 | SUNCOR | Outage | 29EDD-71 752_4631 (29EDD-71),29EDD-71 752_4621 (29EDD-71),29EDD-71 752_4613 (29EDD-71),29EDD-71 752_4651 (29EDD-71),29EDD-71 752_4641 (29EDD-71),29EDD-71 144kV Bus 29PP-46 | Switch maintenance. | 2.42 Days
Continuous |
|
| 03-Nov-14 09:00 | 05-Nov-14 20:00 | SUNCOR | Outage | 30PL2-1 (30EDD-1 - 30EDD-2) | maintenance on breaker, VT, cable, reactor, relays and meters associated with 30PL2-2 | 2.46 Days
Continuous |
|
| 03-Nov-14 09:00 | 03-Nov-14 12:00 | Syncrude | TE | AURORA Aurora RTU/SCADA,D05 Syncrude RTU/SCADA | upgrade to Syncrude DCS and ICCP servers | 3 Hours
Continuous |
|
| 03-Nov-14 09:30 | 03-Nov-14 17:00 | ATCO | TE | 801s Anderson RTU/SCADA | download new configuration file | 7.5 Hours
Daily |
|
| 03-Nov-14 10:00 | 03-Nov-14 12:00 | ATCO | TE | 800s Friedenstal RTU/SCADA | radio maintenance | 2 Hours
Continuous |
|
| 03-Nov-14 10:00 | 07-Nov-14 15:00 | ATCO | TE | ATCO Radio Tower | radio work | 4.21 Days
Continuous |
|
| 03-Nov-14 12:00 | 03-Nov-14 17:00 | ALTALINK | TE | 42s Sarcee RTU/SCADA | update RTU configuration with new alarms | 5 Hours
Daily |
|
| 03-Nov-14 12:00 | 06-Nov-14 11:30 | ALTALINK | TE | 618s Riverbend RTU/SCADA | RTU replacement project | 2.98 Days
Daily |
|
| 04-Nov-14 06:30 | 18-Nov-14 18:00 | ALTALINK | Outage | 901L (63s Red Deer - 74s Janet) | L to J : replace 74s901N, PTs, CTs and footings, in conjunction with north B1 bus outage | 14.48 Days
Continuous |
AB-BC |
| 04-Nov-14 08:00 | 05-Nov-14 17:00 | ALTALINK | Outage | 38s T3 (38s East Edmonton) | replace 25kV Protections | 1.38 Days
Continuous |
|
| 04-Nov-14 08:00 | 08-Nov-14 16:00 | ATCO | RB | 7L89 (721s La Corey - 700s Bonnyville) | install blast wall at 721S between 701T and 702T | 4.33 Days
Daily |
|
| 04-Nov-14 08:00 | 04-Nov-14 17:00 | ALTALINK | Outage | 202L (58s Edson - 178s Cynthia),58s 202X (58s Edson) | test recloser | 9 Hours
Daily |
|
| 04-Nov-14 08:00 | 04-Nov-14 19:00 | ALTALINK | Outage | 331s T2 (331s Ponoka) | replace defective ETM unit | 11 Hours
Daily |
|
| 04-Nov-14 08:00 | 04-Nov-14 17:00 | TRANSALTA, ALTALINK | IO | 59S Peigan,370S North Lethbridge | add new fibres to network | 9 Hours
Daily |
|
| 04-Nov-14 08:00 | 07-Nov-14 17:00 | ALTALINK | IO | 523S Bullshead | add new telecom antenna | 3.38 Days
Daily |
|
| 04-Nov-14 08:00 | 08-Nov-14 17:00 | ALTALINK | IO | 370S North Lethbridge,MUX Radio | 9370R move fibre to new conduit | 4.38 Days
Daily |
|
| 04-Nov-14 08:00 | 24-Nov-14 08:00 | ENMAX | Outage | 32.83L (ENMAX 32 - ENMAX 40) | line differential | 20 Days
Continuous |
|
| 04-Nov-14 08:00 | 04-Nov-14 17:00 | AESO | Outage | 736L (38s East Edmonton - 293s Bernese) | install corona rings | 9 Hours
Daily |
|
| 04-Nov-14 08:00 | 28-Apr-15 17:00 | ALTALINK | Outage | 637L (17s Benalto - 580s Sylvan Lake) | line rebuild; for RATD | 175.33 Days
Continuous |
|
| 04-Nov-14 08:00 | 20-Feb-15 17:00 | ALTALINK | Outage | 80L (194s South Red Deer - 217s North Red Deer) | rebuild and will be renamed to 425L; for RATD | 108.38 Days
Continuous |
|
| 04-Nov-14 08:00 | 05-Nov-14 16:00 | ENMAX | Outage | 15.60L (ENMAX 21 - ENMAX 15) | climbing inspection | 1.33 Days
Continuous |
|
| 04-Nov-14 08:00 | 05-Nov-14 16:30 | ATCO | TE | 707s St.Paul RTU/SCADA | download SEL-2032 program, pre-commission with STG | 1.35 Days
Continuous |
|
| 04-Nov-14 08:00 | 04-Nov-14 18:00 | ALTALINK | Outage | 739L (305s Acheson - 434s Stony Plain) | insulator washing with ground crew, planned with 434s739E breaker outage. | 10 Hours
Daily |
|
| 04-Nov-14 09:00 | 07-Nov-14 15:00 | ALTALINK | Outage | 744L (228s T.M.P.L.Niton - 744L89B) | line maintenance | 3.25 Days
Continuous |
|
| 04-Nov-14 09:00 | 04-Nov-14 17:00 | ALTALINK | Outage | 868s T1 (868s Keephills Make-Up) | transformer doble | 8 Hours
Daily |
|
| 04-Nov-14 09:00 | 04-Nov-14 16:00 | ALTALINK | TE | 294s Brazeau Outletworks RTU/SCADA | radio firmware upgrade | 7 Hours
Daily |
|
| 04-Nov-14 09:00 | 04-Nov-14 12:00 | ALTALINK | RB | 190L (17s Benalto - 320p Keephills) | high load move | 3 Hours
Daily |
|
| 04-Nov-14 10:00 | 04-Nov-14 14:00 | ALTALINK | TE | 38s East Edmonton RTU/SCADA | update RTU with new configuration | 4 Hours
Daily |
|
| 04-Nov-14 10:00 | 04-Nov-14 12:00 | ALTALINK | TE | 447s Enchant RTU/SCADA,158s Vauxhall RTU/SCADA,257s Hull RTU/SCADA | move MPLS and 447s radio (circuit Outages 158s, 447s, 257s supervisory) | 2 Hours
Daily |
|
| 04-Nov-14 10:00 | 04-Nov-14 14:00 | ATCO | TE | ATCO Radio Tower | Codesa Tower, routine maintenance. | 4 Hours
Continuous |
|
| 04-Nov-14 11:00 | 04-Nov-14 16:00 | ATCO | TE | 846S Grand Centre | to install and test new settings for the existing 21A_7L24 relay at 846s Grand Centre | 5 Hours
Continuous |
|
| 04-Nov-14 12:00 | 04-Nov-14 16:00 | ATCO | TE | 787s 701T (787s High Prairie) | troubleshoot ground fault on alarm cable | 4 Hours
Continuous |
|
| 04-Nov-14 12:30 | 04-Nov-14 17:00 | ATCO | TE | 766s Nevis RTU/SCADA | commission newly added security points and change programming/wiring | 4.5 Hours
Continuous |
|
| 04-Nov-14 13:00 | 04-Nov-14 15:00 | ALTALINK | TE | 257s Hull RTU/SCADA | move 257s radio to new control building at 158s (circuit outage 257s supervisory) | 2 Hours
Daily |
|
| 04-Nov-14 14:00 | 04-Nov-14 15:00 | ATCO | Outage | 881s 702T (881s Sturgeon) | CT radio changes. | 60 Mins
Continuous |
|
| 05-Nov-14 07:00 | 06-Nov-14 17:00 | ALTALINK | Outage | 370s 23 (370s North Lethbridge) | replace breaker protection & control module | 1.42 Days
Continuous |
|
| 05-Nov-14 07:00 | 07-Nov-14 17:00 | ENMAX | RB | 16.63L (ENMAX 16 - ENMAX 36) | tree trimming | 2.42 Days
Continuous |
|
| 05-Nov-14 07:00 | 08-Nov-14 18:00 | ATCO | Outage | 9L59 (972s Tinchebray - 801s Anderson) | string new 13L50 line | 3.46 Days
Continuous |
|
| 05-Nov-14 07:30 | 05-Nov-14 16:30 | REDDEER | Outage | 194s T1 (194s South Red Deer) | switch repair 15-81-1 | 9 Hours
Continuous |
|
| 05-Nov-14 08:00 | 06-Nov-14 16:00 | ALTALINK | Outage | 824L (593s Lethbridge Lakeview - 618s Riverbend),618s 824 (618s Riverbend) | RTU replacement project and 824L CT ratio change upgrade project | 1.33 Days
Daily |
|
| 05-Nov-14 08:00 | 05-Nov-14 18:00 | ALTALINK | Trans Test/Comm | 1238L (510s Sunnybrook - 330p Genesee) | commissioning and energization of this new line | 10 Hours
Continuous |
|
| 05-Nov-14 08:00 | 06-Nov-14 17:00 | ALTALINK | Outage | 434s T1 (434s East Stony Plain),739L (434s Stony Plain - 739L216A),434s 739W (434s Stony Plain) | CT contributions (T1 & s739W) / trip test 739W | 1.38 Days
Continuous |
|
| 05-Nov-14 08:00 | 05-Nov-14 18:00 | ALTALINK | Outage | 194s3 (194s South Red Deer) | 194s 15-81-1 maintenance | 10 Hours
Daily |
|
| 05-Nov-14 08:00 | 05-Nov-14 10:00 | ALTALINK | Outage | 893L (806s Oldman River - 103s Goose Lake) | open Jumpers on str 5 to facilitate bird divertor installation | 2 Hours
Daily |
|
| 05-Nov-14 08:00 | 28-Apr-15 17:00 | ALTALINK | Outage | 17s 637 (17s Benalto) | RATD - replace 17s54 & add LA's | 174.33 Days
Continuous |
|
| 05-Nov-14 08:00 | 05-Nov-14 13:00 | ENMAX | Outage | ENMAX 65 B138-D82 (ENMAX 65) | SF6 sample | 5 Hours
Continuous |
|
| 05-Nov-14 08:00 | 05-Nov-14 17:00 | ATCO | RB | 7L230 (7L230 tap - 743s Sarah Lake),7L230 (69s North Barrhead - 7L230 tap) | high load move | 9 Hours
Continuous |
|
| 05-Nov-14 08:00 | 06-Nov-14 17:00 | ATCO | TE | 755s Cordel RTU/SCADA | upgrade and changes | 1.38 Days
Daily |
|
| 05-Nov-14 08:00 | 10-Nov-14 18:00 | EPCOR | TE | 814s T2 (814s Bellamy) | block of A&B protection and settings change on each protection, one at a time. | 5.42 Days
Daily |
|
| 05-Nov-14 08:00 | 05-Nov-14 17:00 | ATCO | RB | 7L230 (7L230 tap - 743s Sarah Lake),7L230 (69s North Barrhead - 7L230 tap) | ATCO high load move | 9 Hours
Daily |
|
| 05-Nov-14 08:00 | 05-Nov-14 11:00 | ALTALINK | Outage | 526L (268s Whitecourt - 526DL185) | high load move | 3 Hours
Daily |
|
| 05-Nov-14 08:00 | 06-Nov-14 17:00 | ALTALINK | Outage | 739L (434s Stony Plain - 739L216A) | insulator washing with ground crew, planned with 434s739W breaker outage | 1.38 Days
Continuous |
|
| 05-Nov-14 08:00 | 06-Nov-14 12:00 | ALTALINK | Outage | 223s T3 (223s Strome) | isolate transformer for warranty work, re-energize | 28 Hours
Continuous |
|
| 05-Nov-14 08:30 | 05-Nov-14 16:30 | ATCO | TE | 830S Carmon | prep work for relay install | 8 Hours
Continuous |
|
| 05-Nov-14 09:00 | 06-Nov-14 17:00 | ATCO | Outage | 7L65 (709s Vegreville - 710s Vermilion) | replacing crossarms on 7L65 | 1.33 Days
Daily |
|
| 05-Nov-14 09:00 | 06-Nov-14 17:00 | ATCO | TE | 848s Ruth Lake RTU/SCADA | password change | 1.33 Days
Daily |
|
| 05-Nov-14 09:00 | 06-Nov-14 17:00 | ATCO | IO | 7L65 (709s Vegreville - 710s Vermilion) | ATCO replacing crossarms on 7L65 | 1.33 Days
Continuous |
|
| 05-Nov-14 09:00 | 06-Nov-14 17:00 | ATCO | TE | 755s Cordel RTU/SCADA | configure RTU | 1.33 Days
Daily |
|
| 05-Nov-14 10:00 | 05-Nov-14 12:00 | ATCO | IO | ATCO's system operations centre | CROW is unavailable during this time. I-Tek is performing monthly server patches |
2 Hours
Continuous |
|
| 05-Nov-14 10:00 | 07-Nov-14 17:00 | BCH | Outage | 1L274 (Line Creek - Elkford) | replacing the structures | 2.29 Days
Continuous |
AB-BC |
| 05-Nov-14 10:00 | 05-Nov-14 12:00 | ALTALINK | IO | 421S Hays,158S Vauxhall | move link radio facing 421s (traffic to be rerouted by Netcom, no outage) | 2 Hours
Daily |
|
| 05-Nov-14 10:00 | 06-Nov-14 15:00 | AESO | Outage | 893L (103s Goose Lake - 893BL tap) | install bird divertors on OHSW | 29 Hours
Continuous |
|
| 05-Nov-14 10:00 | 05-Nov-14 14:00 | ALTALINK | TE | 370s North Lethbridge RTU/SCADA | RTU config update to add alarms related to 370s23 prot | 4 Hours
Daily |
|
| 05-Nov-14 12:00 | 05-Nov-14 15:00 | ATCO | TE | 854s Swan Dive RTU/SCADA | upgrade firewall | 3 Hours
Daily |
|
| 05-Nov-14 12:00 | 06-Nov-14 12:30 | ALTALINK | TE | 245s Seebe RTU/SCADA | RTU configuration update | 24.5 Hours
Daily |
|
| 05-Nov-14 13:30 | 05-Nov-14 15:30 | ALTALINK | IO | 158S Vauxhall,83S Taber | move link radio facing 83s (traffic to be rerouted by Netcom, no outage) | 2 Hours
Daily |
|
| 05-Nov-14 16:00 | 05-Nov-14 18:00 | ALTALINK | Trans Test/Comm | 1238L (510s Sunnybrook - 330p Genesee) | place holder - WATL | 2 Hours
Daily |
|
| 06-Nov-14 08:00 | 06-Nov-14 20:00 | SUNCOR | Outage | 29PL6-4 (836s Steepbank - 29EDD-1) | remove line markers, fix broken strands | 12 Hours
Continuous |
|
| 06-Nov-14 08:00 | 06-Nov-14 17:00 | ALTALINK | RB | 80L (214s Innisfail - 55s Olds) | required for 55s51 repair | 9 Hours
Daily |
|
| 06-Nov-14 08:00 | 06-Nov-14 17:00 | ALTALINK | RB | 80L (55s Olds - 152s Didsbury) | required for 55s51 repair | 9 Hours
Daily |
|
| 06-Nov-14 08:00 | 06-Nov-14 17:00 | ALTALINK | Outage | 678s T2 (678s Okotoks) | Install bird cover-up | 9 Hours
Daily |
|
| 06-Nov-14 08:00 | 07-Nov-14 17:00 | ENMAXGPI | Outage | 134S Taber Wind Farm | installing a new relay | 1.38 Days
Daily |
|
| 06-Nov-14 08:00 | 06-Nov-14 16:00 | ENMAX | Outage | ENMAX 65 B138-D85 (ENMAX 65) | SF6 sample | 8 Hours
Continuous |
|
| 06-Nov-14 08:00 | 06-Nov-14 15:00 | ATCO | TE | 787S High Prairie | SCADA end to end testing for 702T and 703 | 7 Hours
Continuous |
|
| 06-Nov-14 08:30 | 06-Nov-14 16:00 | ATCO | TE | 813s Little Smoky RTU/SCADA | configure RTU | 7.5 Hours
Continuous |
|
| 06-Nov-14 08:30 | 06-Nov-14 16:00 | ATCO | Outage | 6L57 (735s Swan River - 727s Kinuso),6L97 (735s Swan River - 739s Edith Lake) | install jumpers J4 as per staged SLD # 3 drawing | 7.5 Hours
Continuous |
|
| 06-Nov-14 09:00 | 08-Nov-14 19:00 | SUNCOR | Outage | 29EDD-71 752_4634 (29EDD-71),29EDD-71 752_4624 (29EDD-71),29EDD-71 752_4614 (29EDD-71),29EDD-71 752_4654 (29EDD-71),29EDD-71 752_4644 (29EDD-71),29EDD-71 144kV Bus 29PP-47 | maintenance on switch in 29EDD-71 | 2.42 Days
Continuous |
|
| 06-Nov-14 09:00 | 06-Nov-14 10:00 | ALTALINK | Outage | 55s T2 (55s Olds),55s52 (55s Olds),55s51 (55s Olds) | remove broken blade | 60 Mins
Daily |
|
| 06-Nov-14 09:00 | 06-Nov-14 15:00 | ATCO | TE | 918s Bauer RTU/SCADA | Update RTU configuration | 6 Hours
Continuous |
|
| 06-Nov-14 10:00 | 06-Nov-14 11:00 | ALTALINK | TE | 310P Sundance RTU/SCADA | configuration update due to 310p1152 breaker change | 60 Mins
Daily |
|
| 06-Nov-14 10:00 | 06-Nov-14 15:00 | ATCO | TE | 886s Updike RTU/SCADA | troubleshoot poor RF signal | 5 Hours
Continuous |
|
| 06-Nov-14 10:00 | 06-Nov-14 10:30 | ALTALINK | TE | 498s Tilley RTU/SCADA | RTU config update | 30 Mins
Daily |
|
| 06-Nov-14 10:00 | 06-Nov-14 11:00 | ALTALINK | TE | 35s Rundle RTU/SCADA | circuit cutover to new MPLS network | 60 Mins
Daily |
|
| 06-Nov-14 10:01 | 06-Nov-14 14:00 | ALTALINK | Outage | 55s T2 (55s Olds),55s Olds 138kV T2 Bus | install new connector | 3.98 Hours
Daily |
|
| 06-Nov-14 12:00 | 06-Nov-14 12:30 | ALTALINK | TE | 107s Westfield RTU/SCADA | RTU configuration update. | 30 Mins
Daily |
|
| 06-Nov-14 12:00 | 06-Nov-14 13:00 | ALTALINK | TE | 29s Cascade RTU/SCADA | circuit move to new MPLS network | 60 Mins
Daily |
|
| 06-Nov-14 12:00 | 06-Nov-14 15:00 | ALTALINK | RB | 763L (83s Taber - 158s Vauxhall) | Fortis request | 3 Hours
Daily |
|
| 06-Nov-14 12:30 | 07-Nov-14 17:00 | ATCO | TE | 757s Battle River RTU/SCADA | commission newly added security points to SCC & change programming/wiring | 28.5 Hours
Continuous |
|
| 06-Nov-14 13:00 | 13-Nov-14 09:00 | ALTALINK | Outage | 574s T3 (574s Nilrem) | complete the construction on 574s51, 574s1752, 574sT3, 574sSS3, new AMI including cables, 25kV bus and install Fortis feeder cables on 2035L, 2309L, 2474L and 2244L | 6.83 Days
Continuous |
|
| 06-Nov-14 14:00 | 06-Nov-14 15:00 | ALTALINK | TE | 20s Ghost RTU/SCADA | circuit move to new MPLS network | 60 Mins
Daily |
|
| 06-Nov-14 14:00 | 06-Nov-14 16:00 | ALTALINK | RB | 995AL (68s Willesden Green - 995L tap),995L (62s Brazeau - 995AL tap),995L (17s Benalto - 995AL tap) | high load move | 2 Hours
Daily |
|
| 06-Nov-14 14:01 | 06-Nov-14 17:00 | ALTALINK | Outage | 55s T2 (55s Olds),55s52 (55s Olds) | close in 55s51 | 2.98 Hours
Daily |
|
| 06-Nov-14 15:00 | 06-Nov-14 17:00 | AESO | Outage | 893L (103s Goose Lake - 893BL tap),893BL (806s Oldman River Dam - 893BL tap) | close jumpers on str 5 after bird divertor installation | 2 Hours
Daily |
|
| 07-Nov-14 08:00 | 07-Nov-14 12:00 | ENMAX | Outage | 162s 138_RB80 (162s Beddington) | SF6 sample | 4 Hours
Continuous |
|
| 07-Nov-14 08:00 | 07-Nov-14 18:00 | ALTALINK | Outage | 739L (432s Carvel - 739L214B) | insulator washing with ground crew | 10 Hours
Daily |
|
| 07-Nov-14 10:00 | 07-Nov-14 11:00 | ATCO | TE | 9L20 (766s Nevis - 755s Cordel) | 21B protection outage for password change | 60 Mins
Continuous |
|
| 07-Nov-14 12:01 | 07-Nov-14 16:00 | ENMAX | Outage | 162s 138_RB85 (162s Beddington) | SF6 sample | 3.98 Hours
Continuous |
|
| 07-Nov-14 15:00 | 07-Nov-14 17:00 | ALTALINK | Outage | 154S Black Spruce | close open point for new station service load SS2 | 2 Hours
Daily |
| This document and the information contained herein are based upon information and data which by their nature contain a degree of uncertainty and are subject to change. In addition, this document may contain information and data from public sources and/or third parties, which have been assumed to be accurate and complete and have not been verified. Accordingly, the Independent System Operator, operating as the Alberta Electric System Operator (the "AESO") makes no warranty, representation or guarantee, express or implied, with respect to this document or the information contained herein, including, but not limited to, any warranty, representation or guarantee of accuracy, completeness, timeliness, reliability, availability, absence of computer virus, non- infringement, merchantability or suitability for any purpose. Under no circumstances will the AESO, its members, officers, employees, contractors or agents, or any of their respective affiliates, be liable for any errors or omissions in, or any losses, damages or claims whatsoever, whether in contract, tort or otherwise, arising from use of or reliance upon, this document or any information contained herein. © 2009 Alberta Electric System Operator. All rights reserved |