AIES Event Log

The report is downloading, please wait...

Click here for information about 'Energy Emergency Alerts'
Date/Time Comments
05/21/2026 04:35Keephills 2 online.
05/20/2026 08:51The AESO has cancelled Limited Market Operation at 08:51 2026 05 20. Normal market operations and communications have resumed.
05/20/2026 07:59This Cory Deydey System Controller from the Alberta Electric System Operator, as of 07:59 on 2026 05 20 Limited Market Operations has been declared due to market tool outage. The AESO will be dispatching from the HE 08 merit order. The SMP as of 07:59 is $21.01. The duration of limited market is unknown at this time.
05/19/2026 13:17CAL1 offline.
05/18/2026 11:22Cascade 2 online.
05/18/2026 10:20Cascade 2 offline.
05/17/2026 16:13Supply Surplus is no longer in effect. Restatements to reduce zero-dollar block volumes within the T-2 timeframe are no longer permitted
05/17/2026 16:13Supply Surplus is no longer in effect. Restatements to increase export bids or reduce Import offers are no longer permitted within the T-2 timeframe
05/17/2026 15:00Battle River 4 Online
05/17/2026 14:01Battle River 5 Online
05/17/2026 13:01H.R. Milner Online
05/17/2026 08:00Supply Surplus in effect; restatements to increase export bids and reduce Import offers are now permitted within the T-2 timeframe
05/17/2026 08:00Supply Surplus in effect; restatements to reduce zero-dollar block volume are now permitted within the T-2 timeframe
05/16/2026 00:02H.R. Milner Offline
05/15/2026 22:10Battle River 4 Offline
05/15/2026 22:06H.R. Milner Online
05/15/2026 17:01Battle River 4 online.
05/15/2026 14:21Cascade 2 Online
05/15/2026 01:16Battle River 5 offline.
05/14/2026 23:15Battle River 4 offline.
05/14/2026 18:02Battle River 5 online

Report Disclaimer
The above information represents a log of non-confidential system events of public interest that impact the AIES. It is a manual communications tool updated by the AESO on a reasonable efforts basis.