Alberta Electric System Operator
Weekly Graphs: November 23, 2003 to November 29, 2003



 


AESO Weekly Report

23-November-2003 to 29-November-2003

Pool Prices ($/MWh)

Occurred on:

Day

23-Nov

24-Nov

25-Nov

26-Nov

27-Nov

28-Nov

29-Nov

Week

Date

Hr

 

Minimum

10.37

10.37

25.00

18.79

10.37

15.50

15.82

10.37

23-Nov

1

Maximum

67.05

66.50

156.41

294.88

63.94

69.20

69.60

294.88

26-Nov

17

Average

34.71

37.85

53.75

68.07

39.38

47.06

38.21

45.58

   
 

System Demand (MW)

Occurred on:

Day

23-Nov

24-Nov

25-Nov

26-Nov

27-Nov

28-Nov

29-Nov

Week

Date

Hr

 

Minimum

6,822

6,673

6,852

6,772

6,854

6,738

6,706

6,673

24-Nov

4

Maximum

8,166

8,576

8,481

8,423

8,492

8,364

8,040

8,576

24-Nov

18

 

Energy Traded (MWh)

 
 

Day

23-Nov

24-Nov

25-Nov

26-Nov

27-Nov

28-Nov

29-Nov

Week

 
 

Total

176,555

184,131

183,800

183,715

184,645

182,110

176,154

1,271,110

 

 


The weekly system peak demand was 8,576 MW and total energy demand was 1,271 GWh as compared to the previous week's 8,578 MW and 1,265 GWh.

The weekly maximum pool price was 294.88 $/MWh versus the previous week's 624.04 $/MWh.  

Highlights:

Date

Time

Event

November 25, 2003

08:59

Battle River #5 off line.

November 26, 2003 

15:18

Sundance #4 off line.

 

16:22

Battle River #5 on line.

 

22:00

Battle River # 4 off line

November 27, 2003

00:28

Sun #4 on line

 

15:42

Brazeau #1 returned to service

November 28, 2003

05:15

Sundance #5 off line.

 

08:17

Battle River #4 on line.

 

19:10

Battle River #4 off line

 

20:09

Rainbow #4 off line.

November 29, 2003

22:17

Rainbow #5 on line.

Prepared by Steve Heidt, December 1, 2003

 


ALBERTA ELECTRIC SYSTEM OPERATOR (AESO)

1800, 700 4 Avenue SW
Calgary, AB T2P 3J4
Phone: (403) 543-0380
Fax: (403) 543-0388

900, 736-8th Ave SW
Calgary, AB T2P 1H4
Phone: (403) 232-0944
Fax: (403) 266-2959

Copyright Alberta Electric System Operator. ©2003. All rights reserved.