Power Pool Of Alberta |
||||||||||
Weekly Report |
||||||||||
12-Sep-1999 to 18-Sep-1999 |
||||||||||
Pool Prices ($/MWh) |
||||||||||
Occurred on: | ||||||||||
Day | 12-Sep | 13-Sep | 14-Sep | 15-Sep | 16-Sep | 17-Sep | 18-Sep | Week |
Date |
Hr |
Minimum | 32.00 | 5.91 | 11.94 | 5.80 | 8.83 | 5.80 | 34.28 | 5.80 |
15-Sep |
1 |
Maximum | 38.48 | 54.89 | 124.99 | 52.00 | 46.00 | 59.48 | 44.31 | 124.99 |
14-Sep |
13 |
Average | 36.40 | 35.73 | 61.34 | 35.52 | 34.71 | 34.84 | 37.55 | 39.44 |
||
System Demand (MW) |
||||||||||
Occurred on: | ||||||||||
Day | 12-Sep | 13-Sep | 14-Sep | 15-Sep | 16-Sep | 17-Sep | 18-Sep | Week |
Date |
Hr |
Minimum | 4,860 | 4,801 | 4,904 | 4,935 | 4,911 | 4,972 | 4,882 | 4,801 |
13-Sep |
4 |
Maximum | 5,855 | 6,340 | 6,320 | 6,437 | 6,458 | 6,340 | 5,814 | 6,458 |
16-Sep |
17 |
Energy Traded (MWh) |
||||||||||
Day | 12-Sep | 13-Sep | 14-Sep | 15-Sep | 16-Sep | 17-Sep | 18-Sep | Week |
||
Total | 128,793 | 137,686 | 138,139 | 139,096 | 140,498 | 138,929 | 129,946 | 953,087 |
||
The weekly system peak was 6,458 and total energy demand was 953 GWh as compared to the previous week's 6,526 MW and 948 GWh.
The maximum pool price of 124.99 $/MWh was higher than the previous week's 42.08 $/MWh.
Highlights:
Monday, September 13, 1999
22:09 Wabamun #1 on line (off since 10:21 September 11, 1999).
Tuesday, September 14, 1999
09:07 Sheerness #2 tripped due to boiler control problem.
09:12 The Transmission Administrator's 10 minutes Interruptible Load on reserve notification.
13:00 Option F (4 Hour) Load dispatched off for 17:00.
17:51 Sheerness #2 on line.
20:37 Option F (4 Hour) Load dispatched back on.
21:06 The Transmission Administrator's 10 minutes Interruptible Load off reserve notification.
The weekly maximum pool price of 124.99 $/MWh was posted from Hour Ending 13 to 18.
Thursday, September 16, 1999
05:06 Rossdale #10 on line.
12:45 Cloverbar #4 on line (back from annual maintenance since August 14, 1999).
21:05 Cloverbar #4 off line.
22:33 Cloverbar #4 on line.
Friday, September 17, 1999
09:28 Cloverbar #4 tripped.
10:21 Cloverbar #4 on line.
14:13 Battle River #4 tripped.
18:05 Battle River #4 on line.
21:11 Sheerness #1 off line for boiler leak repair.
Prepared by Jeff Chun, System Scheduler on September 21, 1999.
Power Pool of Alberta
McFarlane Tower
1800, 700 4 Avenue SW
Calgary, AB T2P 3J4
Phone: (403) 543-0380
Fax: (403) 543-0388